Recherche par propriété

Cette page fournit une simple interface de navigation pour trouver des entités décrites par une propriété et une valeur nommée. D’autres interfaces de recherche disponibles comprennent la page recherche de propriété, et le constructeur de requêtes ask.

Recherche par propriété

Une liste de toutes les pages qui ont la propriété « Step Content » avec la valeur « Check the Devices and boxes match the expected EtherCAT setup<span class="icon-instructions idea-icon"> <span class="icon-instructions-icon"><i class="fa fa-lightbulb-o"></i></span> <span class="icon-instructions-text">...Check the green lights on the etherCAT boxes for connection status. Flickering Green means it is OK</span> </span>Repeat steps 7 and 8 until the physical network matches the scanned network You may need to Right Click->scan Boxes on the second device if the EtherCAT boxes do not appear <br/><span class="icon-instructions idea-icon"> <span class="icon-instructions-icon"><i class="fa fa-lightbulb-o"></i></span> <span class="icon-instructions-text">...If the boxes do not appear in the right order, there could be an EtherCAT In /Out crossover</span> </span><br/> ». Puisqu’il n’y a que quelques résultats, les valeurs proches sont également affichées.

Affichage de 101 résultats à partir du n°1.

Voir (200 précédentes | 200 suivantes) (20 | 50 | 100 | 250 | 500).


    

Liste de résultats

  • R0015343 Waste Guidance Installation  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015253 Fit Slider units  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015093 Bench Assemble Transfer Beam  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts when finalised)
  • R0015315 Fit Y Axis Drive components  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised <br/>)
  • R000718E Stage 2 spindle assembly  + (Do not add final tension to bolts until alDo not add final tension to bolts until alignment has been achieved 1 Attach pre built cylinder anchor to end of cylinder 2 Position pre built cylinder on slide base assembly as shown 3 Use 2 off m5 x 25 socket caps with A form washers to attach to slide base 4 Temporarily mount D0007648 with 1 off m6 x 20 socket cap 5 Attach D0007790 cylinder anchor with 4 off M6 x 20 socket caps 6 Attach Cylinder base to anchor with 4 off M6x 20 socket capsse to anchor with 4 off M6x 20 socket caps)
  • R0015035 Bench Assemble V Notch Components  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015004 Bench Assemble Gripper  + (1 Fit bushes B0001106 (20 off) to 8 off D0015095 link bars 2 off D0015096 link bars 2 Fit bearings B0000034 x 2 into D00015086 grip slide body. Use grease to lubricate bearing before assembly)
  • R0015095 Bench Assemble Infeed Support Arms  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015291 Install Transfer Beams To Module C and E  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015060 Bench Assemble Flapper Beam  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts when finalised)
  • R0000738 Pneumatic Installation Part 2  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015094 Fit shafts and Pinions  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015272 1st Stage fitting Saw Outfeed  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts when finalised)
  • R0015096 (c) Bench Assemble Transfer Drive Assembly  + (Use Loctite 243 on all fasteners Use Loctite 572 on all pneumatic threaded connections Pen mark all bolts to show finalised)
  • R0010260 Bench Assemble Tool Break Sensor  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015323 Mount Electrical Cabinet  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015286 Bench Assemble X axis Components and Energy Chain  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015303 Fit backplates and covers  + (Use Loctite 243 on all fasteners Pen mark all bolts to show finalised)
  • R0015285 Bench Assemble Pneumatic Rail  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0000738 Pneumatic Installation  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015292 Install Cylinder Rails and Align  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0002916 Install Machine Trunking  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015340 Drill, Assemble and Mount Electrical Cabinet  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015301 Fit terminal holders and Ethercat boxes  + (1 Segregate cables and pipes as shown in image 2 Mount D0010806 relay mounting base using 4 off M3x 25 pan head screws 3 Repeat for 7 off other connection boxes)
  • R0015071 Bench Assemble Pneumatics Rail  + (Use Loctite 243 on all fasteners Use Loctite 572 on all pneumatic threaded connections Pen mark all fasteners to show finalised)
  • R0015242 Level and Adjust Roller beds module C and E  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015027 Install Pneumatic Connection rail and Air Feeds  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015114 Bench Assemble Valve Banks and Regulators  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015346 Conveyor blower system  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015281 Bench Assemble Transfer Sliders  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts when finalised)
  • R0015011 Bench assemble Gripper  + (check shafts fit correctly into bores of D0015082 gripper bottom bar and D0015083 gripper upper bar)
  • R0015288 Bench Assemble Transfer slider units and Cylinder Rails  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts when finalised)
  • R0015028D ZX5 Hepco Beam Alignment Module C part 2  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts once finalised)
  • R0015119 Mount Assemblies  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts when finalised)
  • R0015140 Spindle energy chains and looms  + (Use Loctite 243 on all fasteners Pen mark bolts once finalised)
  • R0015275 Fit shafts and pinions  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015342 Bench Assemble Outfeed Parts  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts when finalised)
  • R0015349 Install Waste collection boxes  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015096 (e) Bench Assemble Transfer Drive Assembly  + (Use Loctite 243 on all fasteners Use Loctite 572 on all pneumatic threaded connections Pen mark all bolts to show finalised)
  • R0015028D ZX5 Hepco Beam Alignment Module C  + (Ensure additional spacer is removed from jigs when using for alignment on module C)
  • Autoflow Maintenance - Infeed  + (Use a suitable foam cleaner for cleaning off the glue and tape residue left by the profile rolling along the beds)
  • J0001000H Autoflow Mk4 Mechanical installation-Alignment  + (Use footprint drawing to determine machine location for installation)
  • R0015297 Mount V Notch Datum Rollers  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015317 Install Rotary Ring  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0000963E Bench Assemble Z axis Components  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015325 Mount Infeed Clamp  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015332 Mount Backfences and Align  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015298 Bench Assemble V notch Clamps  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0000962E Bench assemble Y axis Components  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015312 Finalise V Notch Subframe  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015063 Bench Assemble Roller Tables  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0000572 Bench Assemble Centralise Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015245 Module C support arm alignment  + (1 Move channel 2 section up or down to co1 Move channel 2 section up or down to copy height of adjacent channel 3. Use the tabs as the reference points 2 Use 2 meter straight edge and level between points indicated Move channel 2 at the end indicated, to give a level reading 3 Tighten bolts to hold in place
    3 Tighten bolts to hold in place <br/>)
  • R0000706 Bench assemble Infeed Datum rollers  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015090 Bench Assemble Roller Tables  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015310 Install V Notch Subframe  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0002794E Mount Width sensor  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015316 V notch Final Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015046 Bench Assemble Infeed Clamps  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015311 Install and Align Datum rollers  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015038 Bench Assemble V notch Datum Rollers  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015273 Module E support arm alignment  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015321 Bench Assemble Guards and Doors  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015331 Mount Centralise Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015101 Bench Assemble Take Up Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015007 Bench Assemble Roller Tables Machining Outfeed  + (13 off Check part D00150001 has been supplied to new specification Check indicated hole, should measure 8.2mm. If not open up with hand drill Drawing change requested 06/06/23 to amend from 8mm to 8.2mm <br/>)
  • R0015262 Drive shaft fitting  + (Attach 9 off B0001150 to load arms as shoAttach 9 off B0001150 to load arms as shown . ensure correct position is used for mounting of bearings . Use 2 off M8 x 30 socket countersink fasteners per bearing to align and fix to arms Ensure greasing point of bearing is facing towards the front of the machine as shown towards the front of the machine as shown)
  • R0015274 Fit X Axis Gearbox and Motor  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
  • R0015264 Fit Loader chains to arms  + (It is vital to tension the securing grubscIt is vital to tension the securing grubscrew for the drive sprockets correctly Use a straight ended 4mm hex key and extension bar to apply as much tension as possible to the m8 grubscrew Then add 2 drops of self wicking thread locker to complete the tension processead locker to complete the tension process)
  • R0015266B mount completed assemblies  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015030B Bench assemble loader wheel  + (Attach cylinder mount block D0010238 to assembly with 4 off M6 x 20 socket caps)
  • R0015079 Infeed extension assembly  + (1 Fit levelling jig to frame extension section as shown 2 Use engineers level to adjust the level with the floor jacking bolts to set the jig level)
  • R0015290 Bench Assemble Top guard  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015255 Mount Assemblies to Main Frame  + (Using the first point used to set the bracUsing the first point used to set the brackets , measure the gap indicated and replicate this measurement on the other 4 points . This is adjusted by moving the indicated bracket up or down .
    ...If enough adjustment isnt available on remaining positions, first position can be moved up and new measurement taken
    sitions, first position can be moved up and new measurement taken</div> </div>)
  • R0015269 Fit Frame ancillaries  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015121 Bench assemble Infeed arms  + (Use loctite 243 on all fasteners Pen mark all fasteners once finalised)
  • R0002913E Install and Align Rotary head Subframe PART 2  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015271 Mount buffer bars  + (Check D0015464B Infeed Rear Endfence has been drilled for m6 countersinks If not rework and note rework time)
  • R0015270 Bench assemble Shafts, bearings and sprockets  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015247 Fit X axis gearbox and Motor  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
  • R0015078B Module A infeed arm alignment  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0002913E Install and Align Rotary head Subframe  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015356 Assemble Pneumatics on to electrical cabinet  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015324 Install pipe and cable looms  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • Troubleshoot - Permanent IP Addresses - UVision Cameras  + (Using any Stuga PC on the same network as the target machines, search for the program '''CameraSetup.exe'''.)
  • Omron E5CVS PV Shift  + (H0 = No offset. Temp at Plate =230 degrees - Display on E5CSV = 240 Degrees L10 = - 10 degree. Temp at plate = 230 degrees - Display E5CSV = 230 Degrees H10 = +10 degree . Temp at plate = 230 degrees - Display E5CSV = 250 Degrees)
  • ACEpc Network Software - IP  + (Volume label [enter] This will format the hard drive and then copy all necessary network software as a ZIP file to the hard drive and then inflate it.)
  • Autoflow Maintenance - Gripper  + (Wipe away any excess oil, dirt or swarf. Apply oil lubricant and wipe of excess # Main X axis slideways # GY Gripper Y axis Slideway # GZ Gripper Z axis slideway)
  • Changing the Flowline Ops Password  + (Within FlowlineOps click on the unlock Button in the toolbar, you will be required to enter a challenge password to enter this area, this can be obtained from https://www.stuga.co.uk/unlock-code/)
  • Gripper Push Speed on Flowline and ZX  + (You can adjust the Flow control and Slow dYou can adjust the Flow control and Slow down the cylinder speed. The one you need to wind IN (clockwise) to slow down is the one nearest to the MH side - Not the Extractor side.
    ...Note, the photo is from a Right to Left feed machine, the video is from a Left to Right feed machine

    feed machine, the video is from a Left to Right feed machine</div> </div><br/>)
  • TB0431 Samsung Drive Parameter Setup  + (Using a stripped plug and making sure therUsing a stripped plug and making sure there is no power going through the plug during installation: # '''Live wire''' (Brown) in the top port # '''Neutral wire''' (Blue) in the second port # '''Ground wire''' (Green + Yellow) in the bottom port # The '''Joggers''' Serial port # Plug in and '''turn on''' plugial port # Plug in and '''turn on''' plug)
  • Convert TC2 Project to TC3  + ( #Open Visual Studio #Create a new TC3 pro #Open Visual Studio #Create a new TC3 project called [BuildNo] in c:\TwinCAT\Stuga\ #Make sure "Create Directory..." is Unticked #Right Click on the project name and select ‘Load Project from TwinCAT 2.11 Version…’ #Click Cancel on the two windows asking to convert the PLC project #Ignore or cancel any warnings about libraries (this part will be replaced later)
    ...Once created, you will have a copy of all the devices and boxes in the project with the correct naming.

    f all the devices and boxes in the project with the correct naming.</div> </div><br/> )
  • Filling Out An Online Daily Timesheet Form  + (You will receive a link via email that wilYou will receive a link via email that will open up your timesheet. Copy the link from the email and paste it into a new shortcut on the desktop of the device you are using. The shortcut should be labelled 'Timesheet' for clarity. To create the shortcut, right-click on a spare area on your desktop and hover over 'New'. This will open a selection panel. Select 'Shortcut'. A text box will appear and this is where you need to paste the link from the email. Once you have pasted the link, select 'Next'. A prompt will will then ask you to name the shortcut. I would suggest that it is named 'Timesheet'. After naming the shortcut, click 'Finish' and the shortcut will appear on your desktop. Double-click on the shortcut to open up your timesheet form.e shortcut to open up your timesheet form.)
  • Changing Version Control to Visual Studio  + (Delete the versionControl folder completelDelete the versionControl folder completely
    ...This prevents confusion in the future of where the project exists

    prevents confusion in the future of where the project exists</div> </div><br/>)
  • Autocut Regular Maintenance  + ([[Autocut Open Guard Doors|https://stuga.dokit.app/wiki/Autocut_Open_Guard_Doors]])
  • Autocut Monthly Maintenance  + ([[Autocut Open Guard Doors|https://stuga.dokit.app/wiki/Autocut_Open_Guard_Doors]])
  • Full Version Upgrade TwinCAT3 WinMulti  + ([[Create a TwinCAT Project from Scratch]] This procedure ensures that the front end PC has the latest TwinCAT version, and that the PLC source control program is correctly integrated, meaning the latest PLC code version will be available)
  • Stuga Product Database - Edit Product Data  + (Search box is upper right)
  • R0015278 Mount Completed Assemblies Section two  + (these steps follow on from dokit [[R0015278 Mount Completed Assemblies]])
  • Setting Gripper Nose  + (when it is in this position - Fully bottomwhen it is in this position - Fully bottomed make sure the Grip on comes down but doesn't catch the Grip nose. Notice the Dead stop bolt at bottom is hard up then set grip switch bolt so that the dead stop bolt gap is no more than 1mm when grip switch goes off.o more than 1mm when grip switch goes off.)
  • Create a TwinCAT Project from Scratch  + (Check the Devices and boxes match the expeCheck the Devices and boxes match the expected EtherCAT setup
    ...Check the green lights on the etherCAT boxes for connection status. Flickering Green means it is OK
    Repeat steps 7 and 8 until the physical network matches the scanned network You may need to Right Click->scan Boxes on the second device if the EtherCAT boxes do not appear
    ...If the boxes do not appear in the right order, there could be an EtherCAT In /Out crossover

    -instructions-text">...If the boxes do not appear in the right order, there could be an EtherCAT In /Out crossover</div> </div><br/>)
  • TB0314 Updating Mint File in Workbench  + ( # Contact Stuga service to download latest version to the machine via teamviewer # On the g:\ drive G:\Builds\Latest Software Versions. # From Dropbox service\Machine Software\ )
  • Correct Adjustment of Saw Anaconda Rotation  + ( # Ensure that the conduit is twisted / biased back # Ensure it misses the guard locking device when manually rotated # Lock off the locknuts in this biassed position )
  • Ensuring Mapped Drives Connect Every Time on Startup  + ( # Go to C:\\Users\Stuga - From here we need to go to 'View' and tick 'hidden items' to show folder 'App Data' # Navigate to C:\\Users\Stuga\App Data\Roaming\Microsoft\Windows\Start Menu\Programs\Start up )
  • VM Upgrade Software  + ( # Install the VM Upgrade hardware [[VM Upgrade Hardware]] # Check that you have at lease 12GB of memory. # Check that the extra disk is present (Should be D) )
  • TB0449 Ecoline Clearing out Old Archived Data  + ( # Open the '''Ecoline software''' and press '''login'''. # Select '''Supervisor''' and type password: '''th0mas''' # Now '''login'''. )
  • Monday - Putting Customer Machines On Stop  + ( # Open the Machines board # In the “Searc # Open the Machines board # In the “Search / Filter Board” oval box at the top left, Filter by the customer name (just a few letters are needed) # Click on the “Service Contract” column # Type “General” and then select  “General On Stop” or “General On Hold” Repeat for each machine this applies to (some machines may be under warranty) es to (some machines may be under warranty) )
  • Updating Teamviewer Host  + ( # Right click on the teamviewer icon in the taskbar (bottom right of screen) # Select Exit Teamviewer )
  • OBSOLETE Installing SourceTree Version Control Software  + ( #Download [http://sourcetreeapp.com/download/?v=win here] #Agree to Ts&Cs <br/> )
  • ACE PC Re-Flash  + (ctrl alt del)
  • TM018B Microline and ZX3 V Notch Blade Setup  + (A calibration mnd file has been written toA calibration mnd file has been written to help line up the  x offsets called VTEST. This program creates the following pattern on the bottom of the profile using a 10mm spindle and the notching blades themselves: Run the VTest operation on a length of large outer frame of at least 1m long. Put the    operation at a position of 500mm. The pattern allows you to measure the offsets required with calipers.
    ...Profile is viewed from the bottom face, Basically turn it over when it comes of the transfer table.

    face, Basically turn it over when it comes of the transfer table.</div> </div><br/>)
  • R0000164 Spindle Disassemble for Required parts  + ( #Remove 2 off M6 grubscrew from pulley #R #Remove 2 off M6 grubscrew from pulley #Remove pulley from shaft
    ...If pulley is tight to remove, use lever bars to prise pulley off

    pulley is tight to remove, use lever bars to prise pulley off</div> </div><br/> )
  • Hikvision Camera Setup  + (<div class="annotatedImageDiv" typeof="
    SADP Tool Icon
    On the machine open the “SADPTool” . This is our camera finder and IP address modifier for the cameras
    )
  • ACEpc Changing IP address using netedit  + (This is supplied by customer. IT department <small>''If testing in house it needs to be on the 192.168.16.xxx range.''</small> <small>''e.g 192.168.16.101''</small>)
  • Upgrade ZX Machine to Beckhoff Drives and Control  + (Before the upgrade is despatched to site, Before the upgrade is despatched to site, the servo system needs to be assembled and pre-wired in its enclosure.
    *Drill off Fan detail in right hand side of cabinet. A 114mm hole saw and arbor has been purchased for this. *Drill and fit 4 adjustable feet in the bottom of the cabinet. 4 extra nuts will be in the kit. The height of the feet does not need to be set at this stage. *Drill off all servo drives. For ZX3 machines, the rack will be as follows: AX8640-AX8118-AX8206-AX8206 and for a ZX4 the will be: AX8640-AX8118-AX8206-AX8206-AX8206 (the extra drive is for the V and W axes). *Pre-wire the rack (inc STO links) and the cabinet fan with the cable provided in the kit. leave the spare coil of cable in the cabinet ready for running on-site. *Plug in the 2x15m green etherCAT cables. *The enclosure bottom plate is left off to allow the cable entry on site. '''''*for detailed wiring information, please use drawing packs from Monday.com board.*'''''
    e use drawing packs from Monday.com board.*''''')
  • Setting Up Email Production Reports  + (Navigate to Settings->Parameters)
  • Installing VNC Server and Viewer  + (<nowiki>From the piggy back PC, connFrom the piggy back PC, connect to
    \\Bnnn\
    or
    \\Bnnn\saw
    [Where Bnnn is the build number - eg M012, F002 etc]
    on the older PC.

    If using the build number does not work, you may need to use IP addresses
    \\192.168.1.54\saw
    (Look up the IP address using ipconfig from the command prompt, or network settings)

    sing ipconfig from the command prompt, or network settings)</pre></div><br/></nowiki>)
  • Autoflow Power On  + ((minimum 6 bar to machine))
  • ZX5 Installation Procedure  + (No hard pipe under the Saw.)
  • ZX5 Alignment Check  + ( * Check backfence roller alignment to infeed * Check roller heights to infeed and outfeed )
  • Autoflow Maintenance - Outfeed Table  + ( * Clean Stainless Steel Bed of swarf and * Clean Stainless Steel Bed of swarf and remove any tape that may have transferred onto the bed during normal operation * Lightly oil shaft on underside of bed, lightly oil cylinder rods * Lghtly oil Hepco rail, 1 -2 pumps of grease into Linear Bearings * Use a suitable foam cleaner for cleaning off the glue and tape residue left by the profile rolling along the beds * Check Hepco rail, Linear Bearings, Shafts and cylinders for damage or wear gs, Shafts and cylinders for damage or wear )
  • Setting Up Windows PC C0000422-KIT 2023  + ( * Connect Keyboard and mouse * Connect network * Connect monitor )
  • Updating the Touchscreen Driver  + ( * Go to Control Panel > Programs and F * Go to Control Panel > Programs and Features > Uninstall a program * Scroll to 'EloMultiTouch' and click uninstall. Touchscreen will still work at this point as the Windows system takes over. However the new one still needs to be installed to allow for calibration. l needs to be installed to allow for calibration. )
  • Autoflow Maintenance - Sawing Centre  + ( * Remove any debris from clamp pads and rollers * Visually check the rollers and clamp pads for damage or excessive wear, oil rollers with supplied oil, visually check cylinder rods for damage )
  • Autoflow Maintenance - Machining Centre  + (Check level of grease in Auto lube Part replacement order code is M0001047)
  • Setting Up C0000422-KIT - Full Hardware 2023  + (Remove the PC from the Dell box with power adapter and power cable. Keyboard and mouse (if supplied) can be returned to stores (not needed here))
  • Upgrade Autoflow to Windows 10  + ( *Ensure regional settings correct - corre *Ensure regional settings correct - correct date format *Rename the Ethernet Adaptors to Ethernet and EtherCAT *Ensure the [https://stuga.dokit.app/wiki/TwinCAT_Issue_-_EtherCAT_Network_Protocol_Missing TwinCAT Protocol is installed] on the EtherCAT adaptor *Teamviewer setup *Administrator password set to "Stuga001" *Add Stuga desktop image *Latest winMulti in c:\multi desktop image *Latest winMulti in c:\multi )
  • PC Recovery Process  + (- Turn off the PC - Plug in recovery USB. - Turn the PC back on - Keep pressing F12 until the boot selection screen shows. <br/>)
  • ZX5 Clamp and Gripper Height Changes for Tall Profile  + (-Remove the gripper pin block by taking ou-Remove the gripper pin block by taking out the centre bolt between the pins, -Pull the block piece from the gripper body. to remove
    ...These Changes are Required on both MH and Saw side Grippers

    >...These Changes are Required on both MH and Saw side Grippers</div> </div><br/>)
  • R0000204 Notching gear boxes assembly  + (It is vital for correct function that all It is vital for correct function that all the shown components are thoroughly degreased before assembly . To do this, wash all parts with FE10 solvent spray and dry with airline.
    ...Ensure your work area is very clean and free from Dust/swarf. Use a clean cloth or paper towel to lay on your bench to ensure parts remain clean once washed

    o lay on your bench to ensure parts remain clean once washed</div> </div><br/>)
  • R0019207 Upgrade SR Axis Spigot  + (Refit bearing housing assembly to main plate)
  • Zx5-Zx 4-Zx3-FL-S65 Saw Blade Removal and Refitting  + (1 Open front door via control screen 2 Ensure emergency stop system is also activated for safe working 3 Remove swarf from saw)
  • TB0444 Renewing CF Card on TwinCAT2 Systems  + (1.      From Camera PC, use System Manager1.      From Camera PC, use System Manager to activate original configuration 2.      From Camera PC, use PLC Editor to login both original projects – PLC_Reset in Port 811, and the other main PLC control project in Port 801.
    DO NOT FORGET TO ACTIVATE BOOT PROJECT

    instructions-text">DO NOT FORGET TO ACTIVATE BOOT PROJECT</div> </div><br/>)
  • TEST JAMIE B  + (<big>This means prepping the changing area so everything is in reach.</big> *(6) Nappies *(2) Baby wipes *(3) Nappy Bag *(4) Change of clothes *(5) A toy (Distraction) <br/>)
  • Back Polish Stuga Saw Blades  + (<div class="icon-instructions caution-icon"> <div class="icon-instructions-icon"><i class="fa fa-exclamation-triangle"></i></div> <div class="icon-instructions-text">Always Polish in this orientation in relation to the Teeth of the blade</div> </div>)
  • Setting Profile Detection Laser Sensor  + (<div class="icon-instructions caution-i
    ...Incorrect L/D setting will make the sensor read back to front
    # Turn L/D adjustment clockwise so it is on its maximum "L" # Turn anticlockwise until Yellow light comes on # Turn clockwise until Yellow light goes off
    urn anticlockwise until Yellow light comes on # Turn clockwise until Yellow light goes off)
  • WinMulti Shutdown procedure  + (Once you have a black screen with a small blue text box in the middle you are safe to press the physical red 'POWER OFF' button on the console.)
  • Ecoline - Setting V Notches on winMulti Software  + (<div class="icon-instructions caution-i
    ...Ensure that the ecoline is producing consistent and reliable datum test results
    e ecoline is producing consistent and reliable datum test results</div> </div>)
  • Ecoline - Disabling V axis To Swap Faulty Drive  + ([[Archiving a TwinCAT Project]])
  • Ecoline Site Installation Guide  + (This is what the taper on the roller approach is for - to raise the profile onto the rollers)
  • Turning Off and Changing Datum Tool  + (<div class="icon-instructions dont-icon"> <div class="icon-instructions-icon"><i class="fa fa-hand-paper-o"></i></div> <div class="icon-instructions-text">Do not alter anything on the 'Tool' Settings' side.</div> </div><br/>)
  • Correcting Linearity with Rack Offset File  + (Write the error +\- next to each notch, meWrite the error +\- next to each notch, measuring from machining centre end (photo shown is RtoL feed machine). Repeat for each notch on each of the 3 bars Again, check for consistency. If there is any doubt that the results have not repeated consistently 3 times, then do not proceed consistently 3 times, then do not proceed)
  • Viewing Camera Footage from Hikvision Cameras  + (If this is the first time that this has been attempted on your PC, a Hikvision plugin will be needed. Follow the process to install it)
  • Disabling a Tool Home or Tool Out Sensor  + (A change has to be made to one of the setup files, so you need to exit to the desktop)
  • Importing Picking List from Sage To Monday  + (A pick run is a chunk or set of Job Cards that will be picked in a controlled amount. This is normally 10-20 job cards. it is managed in this way to keep the amount of time between the allocation on Sage and the physical pick as short as possible.)
  • Guide to Fitting Eject Push Sensors on ZX Machines  + (A retrofit kit will be sent with all the pA retrofit kit will be sent with all the parts needed to carry out this task. The assembly number for the kit is R0019218. If you have any feedback regarding this kit, please use this assembly number. It is important to check the parts you have received against the assembly list to ensure you have nothing missing before starting the job.e nothing missing before starting the job.)
  • ZX4 Infeed Roller Reinforcement  + (Align the infeed roller block so that it is square (check the roller with a straight edge against the other rollers). Fit the bracket using the 2 off M8 x 25 Bolts. Mark through the clearance holes on the bracket onto the roller block.)
  • R0000713E Bench Assemble R Axis Limit Assembly  + (All bolts must have Loctite 243 adhesive applied unless otherwise stated. All bolts must be marked with pen once completed to indicate adhesive and correct tension has been applied)
  • R0000712E Rotary Trunking  + (All bolts must have Loctite 243 adhesive applied unless otherwise stated. All bolts must be marked with pen once completed to indicate adhesive and correct tension has been applied)
  • R0015329 Fit Head Spindle Posts  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015034B ZX5 Module B Wiring Loom installation Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R000559 Bench assemble machined parts  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015064 Bench Assemble Clamp Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015146 Pneumatic pipe Installation  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000558E Bench Assemble Base and Turntable Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015330 Fit 1st stage Ejector and Level Base  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015081 Bench Assemble Single Roller Table  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015341 Bench Assemble Electrical Cabinet with Pneumatics and controls  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000574 Fit Motor and Swarf Chute  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015034B ZX5 Module B Wiring Loom installation Part 3  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015326 Bench Assemble Roller Backfences  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015146 Pneumatic pipe Installation Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R000562 Bench Assemble Centralise Top Table  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015334 Fit Centralise Front Table  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015305 Install Wiring loom for Rotary loom  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015037 Bench Assemble SY Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015064 Bench Assemble Clamp Assembly Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015085 Mount SR Datum Sensor and Flag  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015246 Fit Hepco Drive Beam Cylinder  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015146 Pneumatic pipe Installation Part 3  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000570B Bench Assemble 1st stage Ejector  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015335 Mount Electrical Cabinet  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R000569E Bench Assemble Head Spindle Posts  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015100 Fit Guarding  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015066 Bench Assemble Saw Motor Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015037 Bench Assemble SY Assembly Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000571 Fit and Level Cut Tables , Finalise Eject  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015041 Bench Assemble Top Hood Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015259 Mount roller beds to mainframe  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015034B ZX5 Module B Wiring Loom installation  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R000560 Bench Assemble Spindle  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015333 Fit Clamp Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015267 Assemble Backfences, Fit and Align  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • ZX5 Installation Procedure 2023 Pneumatic connections  + (All control pneumatic connections will be All control pneumatic connections will be identified with identification numbers All permanently fed supply lines will be identified by the use of Red pneumatic pipe All Emergency stop switched air feeds will be identified by the use of Blue pneumatic pipeentified by the use of Blue pneumatic pipe)
  • R0015300 Rotary Ring pneumatic test  + (When air is connect to rotary ring, attention should be paid to any audible air leaks. If any are present, identify source and rectify)
  • R0015029D Hepco Beam Alignment Part 2  + (Always Use Loctite 243 on all fasteners Always use Loctite 570 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
  • R0015029D Hepco Beam Alignment  + (Always Use Loctite 243 on all fasteners Always use Loctite 570 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
  • Commissioning a Beckhoff Axis  + (Ensure the axis.mul file is set up with the same axis Ids as the TwinCAT project Second number in axes.mul file)
  • ZX5 Production R0000548E Module G to R0015040 Module F alignment  + ( # X axis of module is levelled from the t # X axis of module is levelled from the two indicated points . Use a 2 meter straight edge between these points and an engineers level on top # y axis is levelled from these two indicated points . an engineers level rested on this face is sufficient for levelling ed on this face is sufficient for levelling )
  • Upgrading Visual Studio to Beckhoff TCXAEShell  + (Ask one of the IT team to connect and downAsk one of the IT team to connect and download it
    ...It is over 1Gb long!
    G:\Design\TwinCAT3\TC31-FULL-Setup.3.1.4024.22.exe
    er 1Gb long!</div> </div> G:\Design\TwinCAT3\TC31-FULL-Setup.3.1.4024.22.exe <br/>)
  • ZX5 Production R0015139 Module B to R0015000B Module C alignment  + (Before installing module B, module C rolleBefore installing module B, module C roller tables should be double checked for correct positioning 1 To do this inspect tables 1, 2,3 and 4 for level as shown. 2 Also inspect alignment with 2 meter straight edge. All rollers should be on the same height and no bump up should be present when moving the straight edge over the table. 3 Ensure fixed table is at same height as rollers Report any discrepancies to supervisor for correct remedial action to supervisor for correct remedial action)
  • Updating Zebra Firmware on ZD620 model  + (Both the zip files for the install of the Zdownloader and the ZPL version file can be located in G:\Builds\Install Files\Zebra Firmware. there is a manual for using the Zdonloader in with the zip file containing the ZPL version file .)
  • R0015295 Finalise wiring loom for Rotary head  + (Cables must be adjusted between each spindCables must be adjusted between each spindle to ensure the cable lengths are correct . 1 Start at cable point between 6 and 5 . Start with the light green ethercat cable with the right angle plug. Adjust so that 200mm is past the end of the spindle plate . See picture for detail. 2 Move to the next spindle connection between 5 and 4 and adjust the new right angled ethercat cable to match the length of the previous adjusted cable 3 Repeat this process working your way around the spindles to set all ethercat cablesnd the spindles to set all ethercat cables)
  • ZX5 Installation Procedure 2023 Part 2  + (Check X axis alignment of horiczontal and Check X axis alignment of horiczontal and vertical rollers using 2 meter straight edge and feeler gauges Any discrepancy must be reported and rectified if present Tolerance 0.002" / 0.05mm [https://stugaltd.monday.com/boards/3628350043/pulses/4665028475][[R0015311 Install and Align Datum rollers]]
    [[R0015311 Install and Align Datum rollers]] <br/>)
  • Upgrading Project File on TwinCAT2 System  + (Check the [https://stugaltd.monday.com/boards/304269981 Control Systems Log] board to look up the machine and the control system used This procedure only applies to TwinCAT2 For TwinCAT3 upgrades use [[Full Version Upgrade TwinCAT3 WinMulti]])
  • Removing or changing a Beckhoff AX8000 series servo drive  + (Circuit breaker will be labelled 'Servo Drives')
  • R0015327 Level Frame and quality Check  + (Clean all threads in frame using standard taps)
  • Autoflow PC Cleanup  + (Click the checkbox)
  • R0015033B ZX5 Module F Wiring Loom  + (Connect ethercat power cables)
  • TB0409 Setting Up Windows 10 PC 2018  + (Connect monitor, network cable, keyboard, mouse/touchpad, and switch on PC.)
  • ZX5 Production R0015040 Module F to R0015001B Module E alignment  + (Position module F at end of Module E infeed frame Approximately Align Saw roller back fences to Saw infeed back fences Approximately align X axis position by setting the to frames spaced at the distance shown of 20mm)