R0015242 Level and Adjust Roller beds module C and E

Cette page contient des modifications qui ne sont pas marquées pour la traduction.

Auteur avatarGareth Green | Dernière modification 3/04/2024 par Gareth Green en cours de rédaction

Introduction

Tools Required


Standard hex key set

Standard spanner set

Engineers level

2mm shim spacer

2 meter straight edge


Parts Required


Installed transfer beam assemblies

Étape 1 - Unless otherwise stated

Use Loctite 243 on all fasteners

Use Loctite 572 on all threaded pneumatic connection

Pen mark all fasteners to show finalised



Étape 2 - Air Supply

The following steps require air supply to be active on the home line of the roller beds. Connect air to feed pipe from manifold bank to lift roller assemblies to home position



Étape 3 - Level roller beds

It is vital roller beds are levelled and positioned correctly


The following steps should be repeated for each and every roller bed assembly



Étape 4 - Cylinder adjustment

Each cylinder assembly will require adjusting to level roller bed correctly



Étape 5 - Check fasteners

Check fasteners holding roller assembly to frame are tensioned correctly. Not adhesive is required at this stage



Étape 6 - Position Engineers level

Engineers level should be positioned directly above cylinder assembly



Étape 7 - Adjust cylinder stroke

Wind back cylinder lock nut and apply 1 drop of Loctite 243 to exposed cylinder thread


Adjust cylinder stroke to bring engineers level to level position


Lock Locking nut in position ,Ensure that 2 spanners are used to hold spherical bearing and cylinder lock nut when tensioning


Ensure level is not affected on tensioning. If so, re adjust to correct


Apply final tension to cylinder lock nuts and mark as finalised



Étape 8 - Double cylinder roller beds

If a double cylinder roller bed is levelled , it is vital to check the first cylinder again after setting second cylinder level position



Étape 9 - Repeat

Repeat levelling process for all roller beds on module C and E



Étape 10 - Quality check on roller beds

Use a 2 meter straight edge to roll across the top face of all the roller beds when in the up position.


Transition should be smooth and bump free from each roller bed to the next


Check in both directions of travel



Étape 11 - Height setting

It is vital the roller beds are set at the correct height in relationship to the gripper assembly


The following steps should be used to correctly set roller bed heights



Étape 12 - Please Note!!

When adjusting height of roller bed assemblies, do not use impact from hammer to adjust . This leads to damage of the small top hat bush within the assembly . adjust height position with fasteners slack , so no force is applied to these bushes



Étape 13 - Position gripper

Gripper should be positioned directly above cylinder to be adjusted



Étape 14 - Gap Setting

Gap requires setting to 2mm between bottom of gripper and top of roller


Use a 2mm shim to set this distance


To adjust roller bed height, slacken bracket fixings and move bracket on slot


Étape 15 - Double cylinder assemblies

Double cylinder assemblies will need additional setting.


Adjust first cylinder position height


Move gripper to second cylinder


Adjust second cylinder position


Move gripper back to first cylinder and check position hasn't altered



Étape 16 - Finalise fixings

Once correct height has been set, adhesive will need individually applying to each fastener


2 off M8 per bracket require finalising



Étape 17 - Repeat above steps

Repeat above steps to set all roller beds on module C and E using the gripper as the datum for each roller bed



Étape 18 - Check transitions

Use a 2 meter straight edge to 'Roll ' along the levelled and set roller bed assemblies


Transition from one roller bed assembly to the next should be smooth with with no jump or drop onto neighbouring roller beds


If discrepancies are found, double check height and levelling, and if correct report to supervisor



Commentaires

Draft