R0002794E Mount Width sensor

Cette page contient des modifications qui ne sont pas marquées pour la traduction.

Auteur avatarGareth Green | Dernière modification 28/03/2024 par Gareth Green en cours de rédaction

Introduction

Tools Required


Standard Hex key set

Standard spanner set

Hack saw


Parts Required


D0000655 Magnet mounting block x 1

E0000461B Analogue linear sensor x 1

E0000463 Captive magnet with ball joint x 1

M5 studding (consumable stock )

Étape 1 - Unless otherwise stated

Use locktite 243 on all fasteners

Use loctite 572 on all threaded pneumatic connection

Pen mark all fasteners to show finalised



Étape 2 - Ecr raised for spacer block

Ecr raised 15/08/23 to create new part for additional spacer block required


If not issued, part will require making until new parts are processed


See drawing for details


2 off required



Étape 3 - Fit mounting brackets

Fit mounting brackets and spacers


Ensure to fit supplied top hat bushes


Use longer M5 socket caps to captivate bracket and spacer



Étape 4 - Fit linear sensor

Slide into position linear sensor


Ensure plug connection is facing towards trunking



Étape 5 - Fit captive magnet ball joint

Slide on captive magnet ball joint


Ensure correct orientation, Use pictures for guidance for correct positioning


Part will indicate which face has to face towards the cable end of the sensor


Étape 6 - Attach magnet mounting block

Dry fit magnet mounting block



Étape 7 - Set position of magnet ball joint

Set position of magnet ball joint to align with indicator mark on linear sensor


Ensure side clamp assembly is fully retracted

Étape 8 - Connect Magnet block

Cut 1 off piece of M5 studding to 85mm


Attach studding to magnet block, use loctite 243 and M5 nuts to lock into position, ensuring position of markers is retained when the clamp is fully open


Étape 9 - Final fix magnet mounting block

Final fit magnet mounting block to clamp assembly


Finalise locking nut on studding



Étape 10 - Check alignment of mounting block

Clearance in mounting block M5 fixings should be used to ensure correct alignment of ball joint, studding and fixing block.


Finalize M5 nuts onto ball joint and mounting block. Then release tension on 2 off M5 socket caps holding mounting block on then re-tension.


This will correctly set alignment between the 3 components



Étape 11 - Test operation

Ensure side clamp movement is not hindered by attached width sensor assembly


Check when clamp is retracted magnet block aligns perfectly onto indicator mark on linear sensor


Check magnet block is orientated correctly ( cable indicator is facing cable )



Commentaires

Draft