R0015093 Bench Assemble Transfer Beam

Cette page contient des modifications qui ne sont pas marquées pour la traduction.

Auteur avatarGareth Green | Dernière modification 8/11/2023 par Gareth Green en cours de rédaction

Introduction

Tools Required


Standard Hex key set

Standard hand taps

V rail alignment Jigs

Drill driver and 4mm hex fitting Parts Required


B0001155 OpenRail 1000mm Long x 32

B0001170 spacer x 320

D0015571 Transfer Arm (2018) x 9



Étape 1 - Unless otherwise stated

Use Loctite 243 on all fasteners

Use Loctite 570 on all threaded pneumatic connections

Pen mark all bolts when finalised



Étape 2 - Quality Check

All bare transfer beams should be visually checked for straightness on the indicated face .


Any discrepancy should be reported



Étape 3 - Transfer beam preparation

1 Remove all protective plastic wrap from D0015571 Transfer Arm (2018)


2 Tap all holes to clear debris.


3 Check area shown for sharp edges burrs. If present, dress down and report as rework. Use grinder with 'polirico' attachment


4 Clean with air to remove swarf and debris


5 Wipe transfer beams with duck oil on a clean rag

Étape 4 - Fit V alignment jigs

Fit 4 off alignment jigs as shown, using jig fasteners


Étape 5 - Align spacers

Align 20 off B0001170 spacer over fixing holes as shown



Étape 6 - Prepare Rail

Each V rail contains 2 off B0001155 OpenRail 1000mm Long


Clean and align 2 off as shown to create One double V rail


Étape 7 - Position Rail

Position assembled rail over spacers as shown.


ensure correct orientation of assembled rail as shown


Étape 8 - Add Fasteners

1 Use M5 x 25 socket caps and M5 A form washers to fix V rail to beam


2 Ensure V rail is touching jigs and assembled V rails are fully closed .


3 Used pistol drill on torque setting 5 with 4mm bit to drive fasteners into place


4 Finalise by hand



Étape 9 - Repeat for 2nd V rail

Repeat process for second rail on transfer beam



Étape 10 - Repeat for 7 more transfer beams

Repeat process and assemble 7 more transfer beams following the previous steps



Étape 11 - Note

1 transfer beam does not have any V rails attached


In total


8 transfer beams to be fitted with 2 V rails per beam


1 transfer beam to be fitted with no V rails



Commentaires

Draft