Installation steps for Electrical looms installation into Module B
Auteur Gareth Green | Dernière modification 21/02/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Installation steps for Electrical looms installation into Module B
R0015034B_ZX5_Module_B_Wiring_Loom_installation_Part_2_Screenshot_2024-02-21_125719.png
Parts Required
Pre labelled Wiring loom assembly R0015034B from electrical team
Tools required
Flush cutters
Tie wraps small
Tie Wraps LargeAll bolts to have Loctite 243 adhesive applied unless otherwise stated
All Threaded Pneumatic connections to have Loctite 570 applied
All bolts to be pen marked once adhesive applied and correct tension added
Retrieve 24B cable which exits the rotary head energy chain and loom to box FB04B out port
Retrieve X488 and X56 from rotary ring loom and route around trunking to EC04B
Route reed switch X65 as shown. Finish at FB04B
Ensure maximum length is left for routing to cylinder at a later point
Route X63 reed switch to the route shown, leaving minimal cable for termination at FB04B end
Route reed switches X59 and X61 from FB04B to exit at point shown of trunking
Ensure minimal length of cable is left at FB04B termination end
Route X111 and X112 reed switches from loom box and route as shown
Reed switches to exit same side as cylinders for V notch clamps
Ensure minimal cable length is left at FB01B connection end
Coil reed switches onto cylinder for temporary measure
Route fitted reed switches X459 and X460 to FB01B
Ensure spiral wrap is used and routed as shown
Connect X120 VY datum cable from wiring loom to sensor shown . Leave trailing ready for looming
Route power cables from ring and exit as shown for Z105 and later
Z104 will have green power cable instead of grey, and single earth cable , route same as above