Recherche par propriété

Cette page fournit une simple interface de navigation pour trouver des entités décrites par une propriété et une valeur nommée. D’autres interfaces de recherche disponibles comprennent la page recherche de propriété, et le constructeur de requêtes ask.

Recherche par propriété

Une liste de toutes les pages qui ont la propriété « Step Content » avec la valeur « Measure and mark up two points between the MACHINING CENTRE and the X-AXIS BEAM. Do this with the beam in the HOME position and also the OUT position. This gives the installation engineer the option of two different methods to go off, whichever suits them and to also check the measurements with the beam in both positions. This makes it easier for the installation engineer to get these two points as close as possible to where they were at Stuga base resulting in little - no adjustments to the X-axis drive min/max and datum. positions. ». Puisqu’il n’y a que quelques résultats, les valeurs proches sont également affichées.

Affichage de 101 résultats à partir du n°1.

Voir (200 précédentes | 200 suivantes) (20 | 50 | 100 | 250 | 500).


    

Liste de résultats

  • Install markings and measurements ZX5  + (Measure and mark up two points between theMeasure and mark up two points between the MACHINING CENTRE and the X-AXIS BEAM. Do this with the beam in the HOME position and also the OUT position. This gives the installation engineer the option of two different methods to go off, whichever suits them and to also check the measurements with the beam in both positions. This makes it easier for the installation engineer to get these two points as close as possible to where they were at Stuga base resulting in little - no adjustments to the X-axis drive min/max and datum. positions.X-axis drive min/max and datum. positions.)
  • TB0314 Updating Mint File in Workbench  + ( # Contact Stuga service to download latest version to the machine via teamviewer # On the g:\ drive G:\Builds\Latest Software Versions. # From Dropbox service\Machine Software\ )
  • Correct Adjustment of Saw Anaconda Rotation  + ( # Ensure that the conduit is twisted / biased back # Ensure it misses the guard locking device when manually rotated # Lock off the locknuts in this biassed position )
  • Ensuring Mapped Drives Connect Every Time on Startup  + ( # Go to C:\\Users\Stuga - From here we need to go to 'View' and tick 'hidden items' to show folder 'App Data' # Navigate to C:\\Users\Stuga\App Data\Roaming\Microsoft\Windows\Start Menu\Programs\Start up )
  • VM Upgrade Software  + ( # Install the VM Upgrade hardware [[VM Upgrade Hardware]] # Check that you have at lease 12GB of memory. # Check that the extra disk is present (Should be D) )
  • Updating Teamviewer Host  + ( # Right click on the teamviewer icon in the taskbar (bottom right of screen) # Select Exit Teamviewer )
  • OBSOLETE Installing SourceTree Version Control Software  + ( #Download [http://sourcetreeapp.com/download/?v=win here] #Agree to Ts&Cs <br/> )
  • ACE PC Re-Flash  + (ctrl alt del)
  • R0000164 Spindle Disassemble for Required parts  + ( #Remove 2 off M6 grubscrew from pulley #R #Remove 2 off M6 grubscrew from pulley #Remove pulley from shaft
    ...If pulley is tight to remove, use lever bars to prise pulley off

    pulley is tight to remove, use lever bars to prise pulley off</div> </div><br/> )
  • Hikvision Camera Setup  + (<div class="annotatedImageDiv" typeof="
    SADP Tool Icon
    On the machine open the “SADPTool” . This is our camera finder and IP address modifier for the cameras
    )
  • PLC Source Control - Git Credential Manager for Windows Install  + ( # Keep the destination folder as the default # Select Components , keep as defaults # Start Menu Folder keep as default # Chose the default editor ,keep as default # Select Use Git from the windows Command Prompt # Use the Window secure Channel Library )
  • ACEpc Changing IP address using netedit  + (This is supplied by customer. IT department <small>''If testing in house it needs to be on the 192.168.16.xxx range.''</small> <small>''e.g 192.168.16.101''</small>)
  • Setting Up Email Production Reports  + (Navigate to Settings->Parameters)
  • Installing VNC Server and Viewer  + (<nowiki>From the piggy back PC, connFrom the piggy back PC, connect to
    \\Bnnn\
    or
    \\Bnnn\saw
    [Where Bnnn is the build number - eg M012, F002 etc]
    on the older PC.

    If using the build number does not work, you may need to use IP addresses
    \\192.168.1.54\saw
    (Look up the IP address using ipconfig from the command prompt, or network settings)

    sing ipconfig from the command prompt, or network settings)</pre></div><br/></nowiki>)
  • Autoflow Power On  + ((minimum 6 bar to machine))
  • ZX5 Installation Procedure  + (No hard pipe under the Saw.)
  • ZX5 Alignment Check  + ( * Check backfence roller alignment to infeed * Check roller heights to infeed and outfeed )
  • Autoflow Maintenance - Outfeed Table  + ( * Clean Stainless Steel Bed of swarf and * Clean Stainless Steel Bed of swarf and remove any tape that may have transferred onto the bed during normal operation * Lightly oil shaft on underside of bed, lightly oil cylinder rods * Lghtly oil Hepco rail, 1 -2 pumps of grease into Linear Bearings * Use a suitable foam cleaner for cleaning off the glue and tape residue left by the profile rolling along the beds * Check Hepco rail, Linear Bearings, Shafts and cylinders for damage or wear gs, Shafts and cylinders for damage or wear )
  • Setting Up Windows PC C0000422-KIT 2023  + ( * Connect Keyboard and mouse * Connect network * Connect monitor )
  • Autoflow Maintenance - Sawing Centre  + ( * Remove any debris from clamp pads and rollers * Visually check the rollers and clamp pads for damage or excessive wear, oil rollers with supplied oil, visually check cylinder rods for damage )
  • Autoflow Maintenance - Machining Centre  + (Check level of grease in Auto lube Part replacement order code is M0001047)
  • Setting Up C0000422-KIT - Full Hardware 2023  + (Remove the PC from the Dell box with power adapter and power cable. Keyboard and mouse (if supplied) can be returned to stores (not needed here))
  • Upgrade Autoflow to Windows 10  + ( *Ensure regional settings correct - corre *Ensure regional settings correct - correct date format *Rename the Ethernet Adaptors to Ethernet and EtherCAT *Ensure the [https://stuga.dokit.app/wiki/TwinCAT_Issue_-_EtherCAT_Network_Protocol_Missing TwinCAT Protocol is installed] on the EtherCAT adaptor *Teamviewer setup *Administrator password set to "Stuga001" *Add Stuga desktop image *Latest winMulti in c:\multi desktop image *Latest winMulti in c:\multi )
  • PC Recovery Process  + (- Turn off the PC - Plug in recovery USB. - Turn the PC back on - Keep pressing F12 until the boot selection screen shows. <br/>)
  • ZX5 Clamp and Gripper Height Changes for Tall Profile  + (-Remove the gripper pin block by taking ou-Remove the gripper pin block by taking out the centre bolt between the pins, -Pull the block piece from the gripper body. to remove
    ...These Changes are Required on both MH and Saw side Grippers

    >...These Changes are Required on both MH and Saw side Grippers</div> </div><br/>)
  • R0000204 Notching gear boxes assembly  + (It is vital for correct function that all It is vital for correct function that all the shown components are thoroughly degreased before assembly . To do this, wash all parts with FE10 solvent spray and dry with airline.
    ...Ensure your work area is very clean and free from Dust/swarf. Use a clean cloth or paper towel to lay on your bench to ensure parts remain clean once washed

    o lay on your bench to ensure parts remain clean once washed</div> </div><br/>)
  • R0019207 Upgrade SR Axis Spigot  + (Refit bearing housing assembly to main plate)
  • Zx5-Zx 4-Zx3-FL-S65 Saw Blade Removal and Refitting  + (1 Open front door via control screen 2 Ensure emergency stop system is also activated for safe working 3 Remove swarf from saw)
  • Ecoline Site Installation Guide  + (This is what the taper on the roller approach is for - to raise the profile onto the rollers)
  • Setting Profile Detection Laser Sensor  + (<div class="icon-instructions caution-i
    ...Incorrect L/D setting will make the sensor read back to front
    # Turn L/D adjustment clockwise so it is on its maximum "L" # Turn anticlockwise until Yellow light comes on # Turn clockwise until Yellow light goes off
    urn anticlockwise until Yellow light comes on # Turn clockwise until Yellow light goes off)
  • Turning Off and Changing Datum Tool  + (<div class="icon-instructions dont-icon"> <div class="icon-instructions-icon"><i class="fa fa-hand-paper-o"></i></div> <div class="icon-instructions-text">Do not alter anything on the 'Tool' Settings' side.</div> </div><br/>)
  • Viewing Camera Footage from Hikvision Cameras  + (If this is the first time that this has been attempted on your PC, a Hikvision plugin will be needed. Follow the process to install it)
  • Correcting Linearity with Rack Offset File  + (Write the error +\- next to each notch, meWrite the error +\- next to each notch, measuring from machining centre end (photo shown is RtoL feed machine). Repeat for each notch on each of the 3 bars Again, check for consistency. If there is any doubt that the results have not repeated consistently 3 times, then do not proceed consistently 3 times, then do not proceed)
  • Disabling a Tool Home or Tool Out Sensor  + (A change has to be made to one of the setup files, so you need to exit to the desktop)
  • Guide to Fitting Eject Push Sensors on ZX Machines  + (A retrofit kit will be sent with all the pA retrofit kit will be sent with all the parts needed to carry out this task. The assembly number for the kit is R0019218. If you have any feedback regarding this kit, please use this assembly number. It is important to check the parts you have received against the assembly list to ensure you have nothing missing before starting the job.e nothing missing before starting the job.)
  • Commissioning - Off-Cut Laser Sensor  + (Adjust the "'''Light Dark'''" balance on tAdjust the "'''Light Dark'''" balance on the sensor. To do this, using a small flat head screwdriver, turn the light dark dial '''clockwise''' until the orange light goes off. Then slowly turn '''anti-clockwise''' until the orange light turns on again, when this happens re-turn a '''little clockwise''' to turn off the orange light.clockwise''' to turn off the orange light.)
  • ZX4 Infeed Roller Reinforcement  + (Align the infeed roller block so that it is square (check the roller with a straight edge against the other rollers). Fit the bracket using the 2 off M8 x 25 Bolts. Mark through the clearance holes on the bracket onto the roller block.)
  • R0000712E Rotary Trunking  + (All bolts must have Loctite 243 adhesive applied unless otherwise stated. All bolts must be marked with pen once completed to indicate adhesive and correct tension has been applied)
  • R0015064 Bench Assemble Clamp Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015335 Mount Electrical Cabinet  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015330 Fit 1st stage Ejector and Level Base  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015100 Fit Guarding  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015267 Assemble Backfences, Fit and Align  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R000559 Bench assemble machined parts  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015146 Pneumatic pipe Installation  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000574 Fit Motor and Swarf Chute  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015037 Bench Assemble SY Assembly Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015034B ZX5 Module B Wiring Loom installation Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015064 Bench Assemble Clamp Assembly Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015326 Bench Assemble Roller Backfences  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015066 Bench Assemble Saw Motor Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015146 Pneumatic pipe Installation Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R000569E Bench Assemble Head Spindle Posts  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R000562 Bench Assemble Centralise Top Table  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015259 Mount roller beds to mainframe  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015337 Bench Assemble Guarding Components  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015037 Bench Assemble SY Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015328 Install Base and Turntable  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015246 Fit Hepco Drive Beam Cylinder  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000558E Bench Assemble Base and Turntable  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015329 Fit Head Spindle Posts  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015081 Bench Assemble Single Roller Table  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015341 Bench Assemble Electrical Cabinet with Pneumatics and controls  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015333 Fit Clamp Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000570B Bench Assemble 1st stage Ejector  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015041 Bench Assemble Top Hood Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • ZX5 Installation Procedure 2023 Pneumatic connections  + (All control pneumatic connections will be All control pneumatic connections will be identified with identification numbers All permanently fed supply lines will be identified by the use of Red pneumatic pipe All Emergency stop switched air feeds will be identified by the use of Blue pneumatic pipeentified by the use of Blue pneumatic pipe)
  • R0015300 Rotary Ring pneumatic test  + (When air is connect to rotary ring, attention should be paid to any audible air leaks. If any are present, identify source and rectify)
  • R0015029D Hepco Beam Alignment Part 2  + (Always Use Loctite 243 on all fasteners Always use Loctite 570 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
  • R0000299 Stroke assembly rebuild Part 2  + (Always use Loctite 243 on all fasteners fitted unless stated different All bearings should be an acceptable fit, with Loctite 641 and FE10 solvent used if required All fasteners should be marked once finalised)
  • Maintenance - Tensioning for R Axis on ZX3  + (Measure the deflection of the belt to be 5mm from its relaxed position)
  • R0015295 Finalise wiring loom for Rotary head  + (Cables must be adjusted between each spindCables must be adjusted between each spindle to ensure the cable lengths are correct . 1 Start at cable point between 6 and 5 . Start with the light green ethercat cable with the right angle plug. Adjust so that 200mm is past the end of the spindle plate . See picture for detail. 2 Move to the next spindle connection between 5 and 4 and adjust the new right angled ethercat cable to match the length of the previous adjusted cable 3 Repeat this process working your way around the spindles to set all ethercat cablesnd the spindles to set all ethercat cables)
  • Upgrading Project File on TwinCAT2 System  + (Check the [https://stugaltd.monday.com/boards/304269981 Control Systems Log] board to look up the machine and the control system used This procedure only applies to TwinCAT2 For TwinCAT3 upgrades use [[Full Version Upgrade TwinCAT3 WinMulti]])
  • Removing or changing a Beckhoff AX8000 series servo drive  + (Circuit breaker will be labelled 'Servo Drives')
  • Autoflow PC Cleanup  + (Click the checkbox)
  • TB0409 Setting Up Windows 10 PC 2018  + (Connect monitor, network cable, keyboard, mouse/touchpad, and switch on PC.)
  • TB0428 Connecting To Yaskawa with Silex USB  + (Connect the Silex to mains, onto the network via RJ45 and via USB to the Yaskawa)
  • PLC Source Control - Working with GIT and TcXaeShell  + ( #Select '''Push''' #Message appears showing the successful push to the '''Origin''' which is in the remote cloud Repo )
  • R0015284 Frame ancillaries  + (Fit 5 off basket support bracket to pre drilled holes at indicated points . Secure using M8 x 20 socket caps and Large M8 washers)
  • R0015244 Frame ancillaries Fitting  + (Fit 5 off basket support bracket to pre drilled holes at indicated points . Secure using M8 x 20 socket caps and Large M8 washers)
  • Repairing R axis datum pin  + (Drill a 2.5mm hole in the datum pin shoulder. Refit to datum plate and use the drilled hole as a guide to drill the aluminium spindle plate. Remove datum pin and tap the hole in the plate using the M3 tap.)
  • R0015099 Guard panel drilling  + (Drill hinge panel as detailed 1 Clamp pDrill hinge panel as detailed 1 Clamp panel in position equalising edges to frame 2 Drill vertical face holes onto frame M6 tapped 3 Mark 4 off holes with M6 pointed grubscrew 4 Drill 4 off to 7.5 mm 5 Check correct drilling by fixing panel with M6 socket capslling by fixing panel with M6 socket caps)
  • Saw machining centre alignment and level check points  + (Ensure all faces being checked are clean and free from dust and swarf . Accuracy of level reading is vital in this operation)
  • R0015268 Pneumatic module Test  + (Ensure area is clear and free from personnel)
  • CX5120 Replacement  + (Ensure replacement CX5120 is setup using   [[TB0451 CX5120 Beckhoff PC Setup|https://stuga.dokit.app/wiki/TB0451_CX5120_Beckhoff_PC_Setup]] before sending to site)
  • AX8000 Drives - ES Contactor Wiring  + (Find a spare section of DIN rail that the contactor can be placed in. The contactor clips onto the din rail without the need for fixings.)
  • Recovery of Bar Queue following winMulti Crash  + (First you need to check out the bar queue First you need to check out the bar queue to see if it is the same as the actual bars on the transfer table #Restart winMulti #Count the total number of bars on the saw infeed and transfer table #Compare with the number of bars on the saw queue
    ...If you have some offcuts on the screen, this can help identify the queue position by looking at the length of the offcut
    If there is '''one more bar''' actually on the table than on the bar queue screen, follow the process below to add the missing bar to the queue.
    han on the bar queue screen, follow the process below to add the missing bar to the queue.)
  • VSM 20-30-P VertiQuad Heater Plate Setting  + (First, make sure the heater plates are cooFirst, make sure the heater plates are cool enough to work on. If not then gloves will be required to protect your hands from the heat Put the machine into input/output mode. This will then allow us to move the heater plates into a position to be worked on. Ensure the items highlighted in GREEN are on.ure the items highlighted in GREEN are on.)
  • Alignment guide using wire line  + (Firstly, identify the two datums that are required to set the wire line to. A wire line should be pulled tight and then anchored to give a wire line from the first and last component)
  • ZX5 Transfer Table Crank set up  + (Follow the instructions in [[Programming Eaton DE Drive|this]]Follow the instructions in [[Programming Eaton DE Drive|this]] tutorial.
    ...It is vital that the Eaton drives are programmed correctly as the distance the cranks travel and the time they take to stop depend on the acceleration and deceleration of the drive.
    ...Programming the drives after the mechanical set up may lead to crashes. Ensure this is done first.

    xt">...Programming the drives after the mechanical set up may lead to crashes. Ensure this is done first.</div> </div><br/>)
  • TB0425 Lenovo Tablet Setup  + (Go to the PlayStore  and download the e-Drawings  app. This will cost (currently £1.25) therefore ask appropriate member for a company card.)
  • Troubleshoot - Permanent IP Address - Windows 8  + (Go to '''Control Panel > Network and ShGo to '''Control Panel > Network and Sharing Centre'''.
    Alternatively you can access the Network and Sharing Centre by right clicking the network icon in the bottom right toolbar on the windows desktop (see picture).

    the bottom right toolbar on the windows desktop (see picture).</div> </div><br/>)
  • Troubleshoot - Permanent IP Address - Windows 10  + (Go to '''Control Panel > Network and ShGo to '''Control Panel > Network and Sharing Centre'''.
    Alternatively you can access the Network and Sharing Centre by right clicking the network icon in the bottom right toolbar on the windows desktop.

    the network icon in the bottom right toolbar on the windows desktop.</div> </div><br/>)
  • ZX5 Installation Procedure 2023 Part 3 Guarding Conformity checks  + (Supplied fencing kit is fitted to module A under loader arms)
  • Autoflow Hepco Slewing Ring - Journal Adjustment  + (Identify the blank spindles - these are the ones with no machining stations on them.)
  • Updating winStugaSaw Software to v4  + (If the PC is Windows XP, it has to be replaced. All XP machines are over 5 years old now, so well beyond their expected lifespan and should be replaced anyway. <br/>)
  • Setting Motor Overload Relays  + (In order to read the motor plate we need tIn order to read the motor plate we need to know 3 pieces of information *Whether the motor is wired in star or delta *The frequency at which the motor is running *The voltage at which the motor is running Whether the motor is wired in star or delta depends on the application. Refer to the electrical diagrams to find out which it is. For example, the saw blade motor is wired in star, whereas most extractor motors are wired in delta. The UK standard for a three phase electrical supply is 415v at 50Hz. Unless the supply to a motor runs through an inverter (i.e the spindles) this is also the standard for our machines. Using the picture on the right as an example, we know the motor will be running at 50Hz (1) so we can disregard the information on the right of the plate as this provides figures for a 60Hz supply. Looking at the box numbered (2) we can work out that this motor would be wired in delta if it were running on a single phase 230v supply. However, we know that this is a three phase supply and will be wired in star. So when we move on to the box numbered (3) we will be looking at the number on the right hand side of the slash. Therefore, this particular motor would need an Overload Relay set to 3.00A.would need an Overload Relay set to 3.00A.)
  • R0015257 Module C Pneumatic Tests  + (In this process pneumatic outputs will be In this process pneumatic outputs will be tested in a non emergency stop environment Ensure safe working practice is followed
    * Ensure Machine test area is clear from personnel and all staff are aware of testing procedure commencing * Ensure all Air connection lines are connected * Ensure all walkways are not impeded by trailing pipes/leads * Ensure all mechanical assemblies are at a sufficient stage for testing
    assemblies are at a sufficient stage for testing)
  • R0015280 Module E Pneumatic Tests  + (In this process pneumatic outputs will be In this process pneumatic outputs will be tested in a non emergency stop environment Ensure safe working practice is followed * Ensure Machine test area is clear from personnel and all staff are aware of testing procedure commencing * Ensure all Air connection lines are connected * Ensure all walkways are not impeded by trailing pipes/leads * Ensure all mechanical assemblies are at a sufficient stage for testinglies are at a sufficient stage for testing)
  • Fitting M8 Plug for EtherCAT Boxes  + (Inside the packet of the plug will be 5 coInside the packet of the plug will be 5 components: 1- Metal outer shell 2- Numbered insert 3- m8 IDC connector 4- Individual 'white' grommet 5- Additional 3 grommets
    ...The 'white' grommet and numbered insert may be stuck in the metal shell. Please check!
    Make sure you check that you have all of these parts before disposing of the packaging.
    gt;Make sure you check that you have all of these parts before disposing of the packaging.)
  • PC Bios Power settings  + (Keep pressing the “DELETE “button on the kKeep pressing the “DELETE “button on the keyboard until the PC goes into the BIOS mode and you see a screen similar to the ones shown below. If the BIOS screen does not show wait for the PC to LOGIN into windows and then shut-down or restart the PC again and retry using the delete button as described above. The Menu Will look something similar to thise Menu Will look something similar to this)