R0015099 Guard panel drilling

Cette page contient des modifications qui ne sont pas marquées pour la traduction.

Auteur avatarGareth Green | Dernière modification 18/12/2023 par Gareth Green en cours de rédaction

Introduction

Tools Required


Standard hex key set

Standard Hss drill set

Standard Tap set

Material clamps

Clamping blocks

Drill

Cutting fluid

Marker pen

Hide hammer


Parts Required


D0000330 Rear Chute Panel (500mm) x 1

D0004391E LF Side Sheet Mk5 (5395E) x 1

D0004576E Saw Centre Frame Mk5 (5343E) Standard Hand x 1

D0010967 Saw Mk5 Undertray x 2

D0015238 Saw Top Hood ZX5 x 1

H0004649 Chute Insert Outfeed (5321) x 1

H0004697 Chute Insert Infeed (5322) x 1

H0004751 Ejector Tray Front (5323) x 1

H0004752 Ejector Tray Rear (5324) x 1

H0004846 Right Side Hinged Panel x 1

D0001878 Rear saw door x 1


Étape 1 - Drill hinge panel

Drill hinge panel as detailed


1 Clamp panel in position equalising edges to frame


2 Drill vertical face holes onto frame M6 tapped


3 Mark 4 off holes with M6 pointed grubscrew


4 Drill 4 off to 7.5 mm


5 Check correct drilling by fixing panel with M6 socket caps

Étape 2 - Drill Side sheet

1 Clamp panel in place. Set equal position side ways and flush to top face


2 Drill 8 off M6 tapped holes as shown


3 Drill and tap M5 , then countersink to allow flush fitment of M5 countersunk bolt

Étape 3 - Drill rear chute and inserts

1 Drill infeed and outfeed chute inserts 1 off M6 tapped per insert

Align as shown


Pictures required please

2 Drill and fit main rear chute as detailed

Étape 4 - Drill rear door

1 Position door above rear chute panel


Pictures of below required please

2 Align height so inner door lip is below chute panel lip


3 check to of door is above frame top crossmember


4 Drill 4 off M6 tapped holes for fixing to frame

Étape 5 - Drill rear tray

Set rear tray flush with all edges shown


Mark and drill Panel M6 tapped,

Étape 6 - Drill front tray

Set front tray flush with all edges shown


Mark and drill Panel M6 tapped,


Ecr raised to amend panel 10/11/23

...Front corner shown may catch weld on frame when mounting, this may require rework

Étape 7 - Fit top hood and position

1 Lift hood onto frame


2 Clamp hood into position , ensuring all faces are set flush with frame

Étape 8 - Mark Fixing points

1 Mark 4 off fixing points with 7.5mm drill


2 Mark 3 off rear hood points by using M6 x 10 pointed grubscrews , winding into lower panel and impacting with hammer


3 Set top hood position even to front tray


4 Remove hood from frame

Étape 9 - Drill hood and rear tray

1 Drill 4 off marked holes on hood to M6 tapped , add small countersink to face indicated to aid fitment to frame


2 Drill rear tray to 7.5mm at points indicted by grubscrews


Étape 10 - Drill and add rivnut Front tray

1 Drill marked positions to correct core size (please provide size) for M5 rivnut. Add small countersink to hole to allow flush fitment


2 Use rivnut applicator to insert and fix 2 off M5 rivnuts


Étape 11 - Remove all fitted panels

Remove all panels


Clean all swarf from frame and clean paintwork


Étape 12 - Drill additional tie base

Drill and tap additional M5 at point indicated, drill through


1 position 125mm


2 position 25mm



Étape 13 - Fit stainless undertrays

1 Fit 16 off M8 x 16 socket caps with M8 A form washers at the points indicated. Add loctite 243 as fitting bolts


Leave enough clearance for trays to slot over


2 Position stainless trays as shown


3 Adjust height of trays to fit flush with top of frame and finalise bolts to secure

Commentaires

Draft