Recherche par propriété

Cette page fournit une simple interface de navigation pour trouver des entités décrites par une propriété et une valeur nommée. D’autres interfaces de recherche disponibles comprennent la page recherche de propriété, et le constructeur de requêtes ask.

Recherche par propriété

Une liste de toutes les pages qui ont la propriété « Step Content » avec la valeur « 1 insert shaft into bore following previous step information 2 Insert 0.125mm/0.005" shim between roller and backfence at indicated point 3 Apply very light hand pressure to area shown to position shaft correctly 4 Fit and finalise M6 x 10 kcp grubscrew to secure shaft 5 Remove shim, as only very light hand pressure has been used, this will mean the shim can be extracted without the need to release pressure on the M5 socket cap holding the roller in position Repeat for all 6 rollers ». Puisqu’il n’y a que quelques résultats, les valeurs proches sont également affichées.

Affichage de 101 résultats à partir du n°1.

Voir (200 précédentes | 200 suivantes) (20 | 50 | 100 | 250 | 500).


    

Liste de résultats

  • Beckhoff AX8000 Flowline Upgrade  + (The first step does not involve being on sThe first step does not involve being on site or carrying out any physical tasks. However, trying to gain some familiarisation before carrying out the upgrade can save time and confusion down the line. Please read through this tutorial before upgrading the machine. The attached files and steps will walk you through the upgrade that somebody else has already experienced. This will give you a free look at any issues or learnings that have already been made. or learnings that have already been made.)
  • R0015278 Mount Completed Assemblies  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
  • Air Pressure Switch Setup  + (This is usually called 'AIR'. From this point you will either need to have somebody watch the input on the screen or have means (eg dialled in on a laptop) to be able to watch the output while carrying out he next step.)
  • ZX5 V Notch Blade Mechanical Setup  + (Using a straight edge placed BETWEEN the tUsing a straight edge placed BETWEEN the teeth of the blade (W/I) you can see we have a gap around 2-3mm. On the opposite blade (W/O) we need to turn the setting bolt anti clockwise until the tips of the teeth just touch the straight edge, as seen in the second picture. If the tips of the teeth were overlapping we would need to increase separation by turning the adjusting bolt clockwise. Transfer the straight edge to the opposite blade (W/O) and adjust W/I as above.
    lade (W/O) and adjust W/I as above. <br/>)
  • Units of Measure modification CIM50  + (To make the item status of a product inactTo make the item status of a product inactive it needs to comply with all of the following conditions : Item has 0 in stock Item has 0 in quarantine Item does not exist on any live sales orders Item does not exist on any live purchase orders Item does not exist on any live works orders Item does not exist on a bill of material
    Please make a note of changes that are made stock levels allocations P.Os Works orders or BOM lists are amended to make an item inactive as these will have to all be re-entered after the unit of measure has been amended and saved.

    e re-entered after the unit of measure has been amended and saved.</div> </div><br/>)
  • DM - Updating Resources  + (To open the document go to the Stuga dropbox (ask admin for permissions): Service > Documentation > Device Magic Resources > DeviceMagic Data v1.xlsx https://www.dropbox.com/s/v7vhxpve9ocm6as/DeviceMagic%20Data%20v1.xlsx?dl=0)
  • R0000088E Stage 1 Spindle assemble  + (Linear rail B0000045 needs fitting to eachLinear rail B0000045 needs fitting to each spindle base
    ..Linear rails have a datum face indication. Attention must be paid for correct orientation
    1 Orientation of Datum face is as shown Ensure all linear rails and machined grooves in spindle plates are free from debris. Use compressed air. 2 Insert linear rail into each spindle base and drop in m6 x 20 socket caps with adhesive applied into all rail counterbores, do not screw in
    nd drop in m6 x 20 socket caps with adhesive applied into all rail counterbores, do not screw in)
  • R0015275 Fit shafts and pinions  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015028D ZX5 Hepco Beam Alignment Module C part 2  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts once finalised)
  • R0015096 (e) Bench Assemble Transfer Drive Assembly  + (Use Loctite 243 on all fasteners Use Loctite 572 on all pneumatic threaded connections Pen mark all bolts to show finalised)
  • R0015288 Bench Assemble Transfer slider units and Cylinder Rails  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts when finalised)
  • R0015004 Bench Assemble Gripper  + (1 Fit bushes B0001106 (20 off) to 8 off D0015095 link bars 2 off D0015096 link bars 2 Fit bearings B0000034 x 2 into D00015086 grip slide body. Use grease to lubricate bearing before assembly)
  • R0015289 Bench Assemble Pipe Connection Rail  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015028D ZX5 Hepco Beam Alignment Module C  + (Ensure additional spacer is removed from jigs when using for alignment on module C)
  • R0015277 Set Drive pinions in position  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
  • R0000738 Pneumatic Installation Part 3  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015093 Bench Assemble Transfer Beam  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts when finalised)
  • R0015272 1st Stage fitting Saw Outfeed  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts when finalised)
  • R0015315 Fit Y Axis Drive components  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised <br/>)
  • R0015035 Bench Assemble V Notch Components  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015358 Conveyor chassis  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015342 Bench Assemble Outfeed Parts  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts when finalised)
  • R0015296 Bench Assemble Bearing Assemblies  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0002916 Install Machine Trunking  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015096 (c) Bench Assemble Transfer Drive Assembly  + (Use Loctite 243 on all fasteners Use Loctite 572 on all pneumatic threaded connections Pen mark all bolts to show finalised)
  • R0015060 Bench Assemble Flapper Beam  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts when finalised)
  • R0015314 Fit Z Axis Drive components  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0000738 Pneumatic Installation  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015094 Fit shafts and Pinions  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015071 Bench Assemble Pneumatics Rail  + (Use Loctite 243 on all fasteners Use Loctite 572 on all pneumatic threaded connections Pen mark all fasteners to show finalised)
  • R0015352 Mount Buffer Beams  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015292 Install Cylinder Rails and Align  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015279 Align Backfences  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015011 Bench assemble Gripper  + (check shafts fit correctly into bores of D0015082 gripper bottom bar and D0015083 gripper upper bar)
  • J0001000H Autoflow Mk4 Mechanical installation-Alignment  + (Use footprint drawing to determine machine location for installation)
  • R0015316 V notch Final Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015090 Bench Assemble Roller Tables  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0000706 Bench assemble Infeed Datum rollers  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015038 Bench Assemble V notch Datum Rollers  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015332 Mount Backfences and Align  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0000572 Bench Assemble Centralise Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015321 Bench Assemble Guards and Doors  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015245 Module C support arm alignment  + (1 Move channel 2 section up or down to co1 Move channel 2 section up or down to copy height of adjacent channel 3. Use the tabs as the reference points 2 Use 2 meter straight edge and level between points indicated Move channel 2 at the end indicated, to give a level reading 3 Tighten bolts to hold in place
    3 Tighten bolts to hold in place <br/>)
  • R0015007 Bench Assemble Roller Tables Machining Outfeed  + (13 off Check part D00150001 has been supplied to new specification Check indicated hole, should measure 8.2mm. If not open up with hand drill Drawing change requested 06/06/23 to amend from 8mm to 8.2mm <br/>)
  • R0015273 Module E support arm alignment  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015063 Bench Assemble Roller Tables  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015312 Finalise V Notch Subframe  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0000963E Bench Assemble Z axis Components  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015046 Bench Assemble Infeed Clamps  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015298 Bench Assemble V notch Clamps  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015101 Bench Assemble Take Up Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015331 Mount Centralise Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015310 Install V Notch Subframe  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0000962E Bench assemble Y axis Components  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015311 Install and Align Datum rollers  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015324 Install pipe and cable looms  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0002913E Install and Align Rotary head Subframe  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015262 Drive shaft fitting  + (Attach 9 off B0001150 to load arms as shoAttach 9 off B0001150 to load arms as shown . ensure correct position is used for mounting of bearings . Use 2 off M8 x 30 socket countersink fasteners per bearing to align and fix to arms Ensure greasing point of bearing is facing towards the front of the machine as shown towards the front of the machine as shown)
  • R0015255 Mount Assemblies to Main Frame  + (Using the first point used to set the bracUsing the first point used to set the brackets , measure the gap indicated and replicate this measurement on the other 4 points . This is adjusted by moving the indicated bracket up or down .
    ...If enough adjustment isnt available on remaining positions, first position can be moved up and new measurement taken
    sitions, first position can be moved up and new measurement taken</div> </div>)
  • R0015247 Fit X axis gearbox and Motor  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
  • R0015274 Fit X Axis Gearbox and Motor  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
  • R0015030B Bench assemble loader wheel  + (Attach cylinder mount block D0010238 to assembly with 4 off M6 x 20 socket caps)
  • R0015290 Bench Assemble Top guard  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015270 Bench assemble Shafts, bearings and sprockets  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015266B mount completed assemblies  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015121 Bench assemble Infeed arms  + (Use loctite 243 on all fasteners Pen mark all fasteners once finalised)
  • R0015356 Assemble Pneumatics on to electrical cabinet  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015264 Fit Loader chains to arms  + (It is vital to tension the securing grubscIt is vital to tension the securing grubscrew for the drive sprockets correctly Use a straight ended 4mm hex key and extension bar to apply as much tension as possible to the m8 grubscrew Then add 2 drops of self wicking thread locker to complete the tension processead locker to complete the tension process)
  • R0015078B Module A infeed arm alignment  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0002913E Install and Align Rotary head Subframe PART 2  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015079 Infeed extension assembly  + (1 Fit levelling jig to frame extension section as shown 2 Use engineers level to adjust the level with the floor jacking bolts to set the jig level)
  • R0015263 Mount drive motor for load shaft  + (Apply adhesive and lock off all grubscrews in spherical bearings in all positions (9 off bearings ))
  • Omron E5CVS PV Shift  + (H0 = No offset. Temp at Plate =230 degrees - Display on E5CSV = 240 Degrees L10 = - 10 degree. Temp at plate = 230 degrees - Display E5CSV = 230 Degrees H10 = +10 degree . Temp at plate = 230 degrees - Display E5CSV = 250 Degrees)
  • TB0431 Samsung Drive Parameter Setup  + (Using a stripped plug and making sure therUsing a stripped plug and making sure there is no power going through the plug during installation: # '''Live wire''' (Brown) in the top port # '''Neutral wire''' (Blue) in the second port # '''Ground wire''' (Green + Yellow) in the bottom port # The '''Joggers''' Serial port # Plug in and '''turn on''' plugial port # Plug in and '''turn on''' plug)
  • Convert TC2 Project to TC3  + ( #Open Visual Studio #Create a new TC3 pro #Open Visual Studio #Create a new TC3 project called [BuildNo] in c:\TwinCAT\Stuga\ #Make sure "Create Directory..." is Unticked #Right Click on the project name and select ‘Load Project from TwinCAT 2.11 Version…’ #Click Cancel on the two windows asking to convert the PLC project #Ignore or cancel any warnings about libraries (this part will be replaced later)
    ...Once created, you will have a copy of all the devices and boxes in the project with the correct naming.

    f all the devices and boxes in the project with the correct naming.</div> </div><br/> )
  • Filling Out An Online Daily Timesheet Form  + (You will receive a link via email that wilYou will receive a link via email that will open up your timesheet. Copy the link from the email and paste it into a new shortcut on the desktop of the device you are using. The shortcut should be labelled 'Timesheet' for clarity. To create the shortcut, right-click on a spare area on your desktop and hover over 'New'. This will open a selection panel. Select 'Shortcut'. A text box will appear and this is where you need to paste the link from the email. Once you have pasted the link, select 'Next'. A prompt will will then ask you to name the shortcut. I would suggest that it is named 'Timesheet'. After naming the shortcut, click 'Finish' and the shortcut will appear on your desktop. Double-click on the shortcut to open up your timesheet form.e shortcut to open up your timesheet form.)
  • Changing Version Control to Visual Studio  + (Delete the versionControl folder completelDelete the versionControl folder completely
    ...This prevents confusion in the future of where the project exists

    prevents confusion in the future of where the project exists</div> </div><br/>)
  • R0015278 Mount Completed Assemblies Section two  + (these steps follow on from dokit [[R0015278 Mount Completed Assemblies]])
  • R0015037 Bench Assemble SY Assembly  + (1 insert shaft into bore following previou1 insert shaft into bore following previous step information 2 Insert 0.125mm/0.005" shim between roller and backfence at indicated point 3 Apply very light hand pressure to area shown to position shaft correctly 4 Fit and finalise M6 x 10 kcp grubscrew to secure shaft 5 Remove shim, as only very light hand pressure has been used, this will mean the shim can be extracted without the need to release pressure on the M5 socket cap holding the roller in position Repeat for all 6 rollersler in position Repeat for all 6 rollers)
  • TB0314 Updating Mint File in Workbench  + ( # Contact Stuga service to download latest version to the machine via teamviewer # On the g:\ drive G:\Builds\Latest Software Versions. # From Dropbox service\Machine Software\ )
  • R0000164 Spindle Disassemble for Required parts  + ( #Remove 2 off M6 grubscrew from pulley #R #Remove 2 off M6 grubscrew from pulley #Remove pulley from shaft
    ...If pulley is tight to remove, use lever bars to prise pulley off

    pulley is tight to remove, use lever bars to prise pulley off</div> </div><br/> )
  • Hikvision Camera Setup  + (<div class="annotatedImageDiv" typeof="
    SADP Tool Icon
    On the machine open the “SADPTool” . This is our camera finder and IP address modifier for the cameras
    )
  • Upgrade ZX Machine to Beckhoff Drives and Control  + (Before the upgrade is despatched to site, Before the upgrade is despatched to site, the servo system needs to be assembled and pre-wired in its enclosure.
    *Drill off Fan detail in right hand side of cabinet. A 114mm hole saw and arbor has been purchased for this. *Drill and fit 4 adjustable feet in the bottom of the cabinet. 4 extra nuts will be in the kit. The height of the feet does not need to be set at this stage. *Drill off all servo drives. For ZX3 machines, the rack will be as follows: AX8640-AX8118-AX8206-AX8206 and for a ZX4 the will be: AX8640-AX8118-AX8206-AX8206-AX8206 (the extra drive is for the V and W axes). *Pre-wire the rack (inc STO links) and the cabinet fan with the cable provided in the kit. leave the spare coil of cable in the cabinet ready for running on-site. *Plug in the 2x15m green etherCAT cables. *The enclosure bottom plate is left off to allow the cable entry on site. '''''*for detailed wiring information, please use drawing packs from Monday.com board.*'''''
    e use drawing packs from Monday.com board.*''''')
  • ZX5 Alignment Check  + ( * Check backfence roller alignment to infeed * Check roller heights to infeed and outfeed )
  • Autoflow Maintenance - Outfeed Table  + ( * Clean Stainless Steel Bed of swarf and * Clean Stainless Steel Bed of swarf and remove any tape that may have transferred onto the bed during normal operation * Lightly oil shaft on underside of bed, lightly oil cylinder rods * Lghtly oil Hepco rail, 1 -2 pumps of grease into Linear Bearings * Use a suitable foam cleaner for cleaning off the glue and tape residue left by the profile rolling along the beds * Check Hepco rail, Linear Bearings, Shafts and cylinders for damage or wear gs, Shafts and cylinders for damage or wear )
  • Setting Up C0000422-KIT - Full Hardware 2023  + (Remove the PC from the Dell box with power adapter and power cable. Keyboard and mouse (if supplied) can be returned to stores (not needed here))
  • Upgrade Autoflow to Windows 10  + ( *Ensure regional settings correct - corre *Ensure regional settings correct - correct date format *Rename the Ethernet Adaptors to Ethernet and EtherCAT *Ensure the [https://stuga.dokit.app/wiki/TwinCAT_Issue_-_EtherCAT_Network_Protocol_Missing TwinCAT Protocol is installed] on the EtherCAT adaptor *Teamviewer setup *Administrator password set to "Stuga001" *Add Stuga desktop image *Latest winMulti in c:\multi desktop image *Latest winMulti in c:\multi )
  • R0000204 Notching gear boxes assembly  + (It is vital for correct function that all It is vital for correct function that all the shown components are thoroughly degreased before assembly . To do this, wash all parts with FE10 solvent spray and dry with airline.
    ...Ensure your work area is very clean and free from Dust/swarf. Use a clean cloth or paper towel to lay on your bench to ensure parts remain clean once washed

    o lay on your bench to ensure parts remain clean once washed</div> </div><br/>)
  • R0019207 Upgrade SR Axis Spigot  + (Refit bearing housing assembly to main plate)
  • Zx5-Zx 4-Zx3-FL-S65 Saw Blade Removal and Refitting  + (1 Open front door via control screen 2 Ensure emergency stop system is also activated for safe working 3 Remove swarf from saw)
  • Ecoline - Setting V Notches on winMulti Software  + (<div class="icon-instructions caution-i
    ...Ensure that the ecoline is producing consistent and reliable datum test results
    e ecoline is producing consistent and reliable datum test results</div> </div>)
  • Ecoline - Disabling V axis To Swap Faulty Drive  + ([[Archiving a TwinCAT Project]])
  • WinMulti Shutdown procedure  + (Once you have a black screen with a small blue text box in the middle you are safe to press the physical red 'POWER OFF' button on the console.)
  • Create a TwinCAT Project from Scratch  + (<div class="icon-instructions info-icon"> <div class="icon-instructions-icon"><i class="fa fa-info-circle"></i></div> <div class="icon-instructions-text">...From Z071 there is no twinSAFE project as the Estop circuit is hard wired</div> </div>)
  • Viewing Camera Footage from Hikvision Cameras  + (If this is the first time that this has been attempted on your PC, a Hikvision plugin will be needed. Follow the process to install it)
  • Correcting Linearity with Rack Offset File  + (Write the error +\- next to each notch, meWrite the error +\- next to each notch, measuring from machining centre end (photo shown is RtoL feed machine). Repeat for each notch on each of the 3 bars Again, check for consistency. If there is any doubt that the results have not repeated consistently 3 times, then do not proceed consistently 3 times, then do not proceed)
  • Importing Picking List from Sage To Monday  + (A pick run is a chunk or set of Job Cards that will be picked in a controlled amount. This is normally 10-20 job cards. it is managed in this way to keep the amount of time between the allocation on Sage and the physical pick as short as possible.)
  • R0000713E Bench Assemble R Axis Limit Assembly  + (All bolts must have Loctite 243 adhesive applied unless otherwise stated. All bolts must be marked with pen once completed to indicate adhesive and correct tension has been applied)
  • R0000558E Bench Assemble Base and Turntable Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015326 Bench Assemble Roller Backfences  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015146 Pneumatic pipe Installation Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015329 Fit Head Spindle Posts  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015034B ZX5 Module B Wiring Loom installation Part 3  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015246 Fit Hepco Drive Beam Cylinder  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R000562 Bench Assemble Centralise Top Table  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015337 Bench Assemble Guarding Components  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015037 Bench Assemble SY Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015146 Pneumatic pipe Installation Part 3  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015100 Fit Guarding  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000558E Bench Assemble Base and Turntable  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000571 Fit and Level Cut Tables , Finalise Eject  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000574 Fit Motor and Swarf Chute  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015334 Fit Centralise Front Table  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015064 Bench Assemble Clamp Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000570B Bench Assemble 1st stage Ejector  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015081 Bench Assemble Single Roller Table  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015305 Install Wiring loom for Rotary loom  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015066 Bench Assemble Saw Motor Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015328 Install Base and Turntable  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R000560 Bench Assemble Spindle  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015259 Mount roller beds to mainframe  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015064 Bench Assemble Clamp Assembly Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015034B ZX5 Module B Wiring Loom installation  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015330 Fit 1st stage Ejector and Level Base  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015029D Hepco Beam Alignment  + (Always Use Loctite 243 on all fasteners Always use Loctite 570 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
  • R0000299 Stroke assembly rebuild Part 2  + (Always use Loctite 243 on all fasteners fitted unless stated different All bearings should be an acceptable fit, with Loctite 641 and FE10 solvent used if required All fasteners should be marked once finalised)
  • ZX5 Production R0000548E Module G to R0015040 Module F alignment  + ( # X axis of module is levelled from the t # X axis of module is levelled from the two indicated points . Use a 2 meter straight edge between these points and an engineers level on top # y axis is levelled from these two indicated points . an engineers level rested on this face is sufficient for levelling ed on this face is sufficient for levelling )
  • ZX5 Production R0015139 Module B to R0015000B Module C alignment  + (Before installing module B, module C rolleBefore installing module B, module C roller tables should be double checked for correct positioning 1 To do this inspect tables 1, 2,3 and 4 for level as shown. 2 Also inspect alignment with 2 meter straight edge. All rollers should be on the same height and no bump up should be present when moving the straight edge over the table. 3 Ensure fixed table is at same height as rollers Report any discrepancies to supervisor for correct remedial action to supervisor for correct remedial action)
  • Changing saw pusher bearings - Standalone Saw  + (Bring the Saw pusher to the end where the chain tensioner and sprocket are. Remove the pusher arm by taking out 2 bolts below the arm. Remove the face plate by taking out the 4 bolts in the fron of the plate Take off the top roller bearings.)
  • R0015295 Finalise wiring loom for Rotary head  + (Cables must be adjusted between each spindCables must be adjusted between each spindle to ensure the cable lengths are correct . 1 Start at cable point between 6 and 5 . Start with the light green ethercat cable with the right angle plug. Adjust so that 200mm is past the end of the spindle plate . See picture for detail. 2 Move to the next spindle connection between 5 and 4 and adjust the new right angled ethercat cable to match the length of the previous adjusted cable 3 Repeat this process working your way around the spindles to set all ethercat cablesnd the spindles to set all ethercat cables)
  • ZX5 Installation Procedure 2023 Part 2  + (Check X axis alignment of horiczontal and Check X axis alignment of horiczontal and vertical rollers using 2 meter straight edge and feeler gauges Any discrepancy must be reported and rectified if present Tolerance 0.002" / 0.05mm [https://stugaltd.monday.com/boards/3628350043/pulses/4665028475][[R0015311 Install and Align Datum rollers]]
    [[R0015311 Install and Align Datum rollers]] <br/>)
  • Upgrading Project File on TwinCAT2 System  + (Check the [https://stugaltd.monday.com/boards/304269981 Control Systems Log] board to look up the machine and the control system used This procedure only applies to TwinCAT2 For TwinCAT3 upgrades use [[Full Version Upgrade TwinCAT3 WinMulti]])
  • TB0409 Setting Up Windows 10 PC 2018  + (Connect monitor, network cable, keyboard, mouse/touchpad, and switch on PC.)
  • ZX5 Production R0015040 Module F to R0015001B Module E alignment  + (Position module F at end of Module E infeed frame Approximately Align Saw roller back fences to Saw infeed back fences Approximately align X axis position by setting the to frames spaced at the distance shown of 20mm)
  • PLC Source Control - Working with GIT and TcXaeShell  + ( #Select '''Push''' #Message appears showing the successful push to the '''Origin''' which is in the remote cloud Repo )
  • R0015244 Frame ancillaries Fitting  + (Fit 5 off basket support bracket to pre drilled holes at indicated points . Secure using M8 x 20 socket caps and Large M8 washers)
  • R0015284 Frame ancillaries  + (Fit 5 off basket support bracket to pre drilled holes at indicated points . Secure using M8 x 20 socket caps and Large M8 washers)
  • Ecoline - Datum and MitreOffset Tests  + (Cut 3 lengths of outerframe around 1000mm Cut 3 lengths of outerframe around 1000mm long
    ...Make sure the gripper end of the profile has a clean edge - ie no swarf and profile tape is not "flapping" over the end

    ie no swarf and profile tape is not "flapping" over the end</div> </div><br/>)
  • R0015099 Guard panel drilling  + (Drill hinge panel as detailed 1 Clamp pDrill hinge panel as detailed 1 Clamp panel in position equalising edges to frame 2 Drill vertical face holes onto frame M6 tapped 3 Mark 4 off holes with M6 pointed grubscrew 4 Drill 4 off to 7.5 mm 5 Check correct drilling by fixing panel with M6 socket capslling by fixing panel with M6 socket caps)
  • R0000164 Spindle Build  + (Ensure all parts supplied are visually cheEnsure all parts supplied are visually checked for damage such as burs or surface contamination Report any issues to supervisor D0006016 may be issued with surface rust . This should be cleaned with green scotchbrite pads as shown in photos to remove contaminationas shown in photos to remove contamination)
  • R0015254 Bench Assemble shafts, Bearings and Pinions  + (Ensure shafts D0015556 2 off and D0015555Ensure shafts D0015556 2 off and D0015555 2 off are clean before trial fitting . 1 check for any burrs or damage to shafts . Remove with File/emery tape 180 grit if present 2 Use compressed air to clean debris from all keyways on shafts . 3 Use Fe10 solvent to remove contaminants on shaftssolvent to remove contaminants on shafts)
  • GY GZ axis setup with Jetter Motors  + (Ensure that the profile support arm is held out of the way to avoid marking the blue infeed arm.)
  • Autocut Startup Procedure  + (Ensure the main isolator on the console is in the on position (pointing up).)
  • ZX5 Transfer Table Setup  + (The rollers on top are mounted on eccentriThe rollers on top are mounted on eccentric bushes. We only need these just tight enough to not allow any slop or vertical play. Slacken the cams off completelely, you will need an 8mm spanner with the faces ground down to fit in the space. Slide the plate onto the rail and tighten the eccentric bushes until any vertical play is removed. Lightly try to move the assembly on the X axis, if there is any slop then it needs to be a little tighter but probably no more than an 1/8th of a turn. Once set you should still be able to spin the rollers by hand, but still feel a fair bit of resistance. Once set slide the assembly over the full length of the V rails to check fo any tight spots. If there are then you need to check that the two halves of the fail are fully mated!!! two halves of the fail are fully mated!!!)
  • AX8000 Drives - ES Contactor Wiring  + (Find a spare section of DIN rail that the contactor can be placed in. The contactor clips onto the din rail without the need for fixings.)
  • TB0422 Commissioning ZX5 Software 2018  + (Follow [https://stuga.dokit.app/wiki/TB0409_Setting_Up_Windows_10_PC_2018 technical bulletin 409] to setup PC with correct naming conventions and TeamViewer.)
  • TwinCat Connection Faults  + (From here we can see there are no comms, and more importantly the devices name. This name can be cross referenced from the wiring diagrams to find where it is located.)
  • TestGG  + (Here is some process #Mini step 1 #mini step 2 <br/><div class="icon-instructions caution-icon"> <div class="icon-instructions-icon"><i class="fa fa-exclamation-triangle"></i></div> <div class="icon-instructions-text">...Do not do this</div> </div><br/>)
  • ZX5 Installation Procedure 2023  + (Identify if either saw infeed or multi head outfeed is the logical frame to place first . Consider access to machine when installing 1st frame Consider handing of machine)
  • Setting Motor Overload Relays  + (In order to read the motor plate we need tIn order to read the motor plate we need to know 3 pieces of information *Whether the motor is wired in star or delta *The frequency at which the motor is running *The voltage at which the motor is running Whether the motor is wired in star or delta depends on the application. Refer to the electrical diagrams to find out which it is. For example, the saw blade motor is wired in star, whereas most extractor motors are wired in delta. The UK standard for a three phase electrical supply is 415v at 50Hz. Unless the supply to a motor runs through an inverter (i.e the spindles) this is also the standard for our machines. Using the picture on the right as an example, we know the motor will be running at 50Hz (1) so we can disregard the information on the right of the plate as this provides figures for a 60Hz supply. Looking at the box numbered (2) we can work out that this motor would be wired in delta if it were running on a single phase 230v supply. However, we know that this is a three phase supply and will be wired in star. So when we move on to the box numbered (3) we will be looking at the number on the right hand side of the slash. Therefore, this particular motor would need an Overload Relay set to 3.00A.would need an Overload Relay set to 3.00A.)
  • Fitting M8 Plug for EtherCAT Boxes  + (Inside the packet of the plug will be 5 coInside the packet of the plug will be 5 components: 1- Metal outer shell 2- Numbered insert 3- m8 IDC connector 4- Individual 'white' grommet 5- Additional 3 grommets
    ...The 'white' grommet and numbered insert may be stuck in the metal shell. Please check!
    Make sure you check that you have all of these parts before disposing of the packaging.
    gt;Make sure you check that you have all of these parts before disposing of the packaging.)
  • PC Bios Power settings  + (Keep pressing the “DELETE “button on the kKeep pressing the “DELETE “button on the keyboard until the PC goes into the BIOS mode and you see a screen similar to the ones shown below. If the BIOS screen does not show wait for the PC to LOGIN into windows and then shut-down or restart the PC again and retry using the delete button as described above. The Menu Will look something similar to thise Menu Will look something similar to this)
  • R0015276 Line up slider units and mesh racks  + (Mesh requires setting between slider unit Mesh requires setting between slider unit and drive pinion 1 It is vital that the correct drive meshing is achieved. 2 Once set, there should be 1mm movement in the direction shown, which will indicate the correct tooth meshing has been obtained. 3 This need to be checked at all points of travel as showne checked at all points of travel as shown)
  • R0015248 Line up slider units and mesh racks  + (Mesh requires setting between slider unit Mesh requires setting between slider unit and drive pinion 1 It is vital that the correct drive meshing is achieved. 2 Once set, there should be 1mm movement in the direction shown, which will indicate the correct tooth meshing has been obtained. 3 This need to be checked at all points of travel as showne checked at all points of travel as shown)
  • 500mm Saw Blade Upgrade  + (Remove the two grub screws from the taper Remove the two grub screws from the taper lock pulleys and insert one into the hole that was initially empty. Screw in tight to break seal of taperlock and split the two parts. If siezed the outer part can be tapped back with a hammer. These parts are usually very brittle and can shatter with a heavy hammer blow. It can also be useful to have the belts on at this point to stop the pulley from turning.his point to stop the pulley from turning.)
  • Easily resizable forms for any screen resolution in Visual Studio  + (On the start screen in Visual Studio, click on the "Create a New Project" button.)
  • TB0452 ZD620 Zebra Printer Setup  + (One difference between the GX420d and the One difference between the GX420d and the ZD620d is the lack of a dedicated power switch. The newer ZD620d opts for a power button that must be pressed in order to turn on the printer after power is supplied. As our machines are fully un-powered after a machine is closed down it causes the operator to intervene and manually turn on the printer after power up. Ideally the Zebra ZD620d has an '''Power Recovery Mode''' that acts as a permanent switch in case of power failure. We can use this on the machines to allow the printer to turn on upon power up. 1.      Disconnect from power. 2.      Remove module door and use Ethernet cable to remove (plug in and pull). 3.      Move the switch that is annotated AUTO to the ON position. 4.      Reinstall the module. 5.      Reconnect power, this should now turn on. Reconnect power, this should now turn on.)
  • TB0426 Replacement Zebra Printer Setup  + (Open box, unwrap printer, plug in power and plug Ethernet connected to network to the printer. As the printer boots up there will be a red light displayed on the front. After around 30 seconds this will turn green as the printer completes boot up.)
  • Setting Up New Printer - GX420d  + (Plug in the power cable and ethernet cable to the back of printer, then turn the printer on with the switch at the back.)
  • Allocations + issuing received parts  + (Populate the allocate column for each partPopulate the allocate column for each part in accordance to the pick bins that are available. The general rule is to prioritize allocation to the range of Bins of the Build numnber which is next to in line to be Built according to the production schedule. If there is no bin physically available for the Job car number shown it must be zero'd in the allocation quantity column and put into stock normally.antity column and put into stock normally.)
  • ZX5 Production R0015122 Module A to R0015139 Module B alignment  + (Position module A in front of module B Use Infeed back fence to Multi head datum rollers as initial alignment guide for Y axis Set gap of 23mm -+ 2mm between module A roller frame and module B roller block)
  • TB0415 Method to Prevent Loosening of Saw Blade  + (Position on shaft not important.)
  • ACEpc Installing netedit with NetSetGo disk  + (Switching on with the floppy disk in will boot from the floppy drive instead of the hard drive)
  • Runing MRP  + (Press the Planning Tab > Read demand > ok The demand will then read with a load screen. Once this has finished move on to the next step)
  • R0000728 R0000729 Stroke Assembly Dismantling  + (The stroke assembly must be dismantled in the exact manner stated as many sections can only be removed once mating parts have been extracted Please use the following steps accurately)
  • R0000299 Stroke assembly rebuild  + (R0000728 and R0000729 are mirror images to each other Please inspect pictures to clarify and confirm correct hand to be built (Supplied unit to be refurbished will always be rebuilt as the same hand ))
  • Upgrade - R0000173 Conveyor Motor  + (Remove the existing motor-g/box, shaft and spider coupling)
  • R0000711 Rotary Base Assembly REV2  + (Rotary drive ring needs checking before fRotary drive ring needs checking before fitment.
    #Check teeth for burrs, damage and debris. Use compressed air to clean all areas #V edge should be checked for damage. Check entire circumference with fingers to identify any damage, lumps or high low spots #Check drive ring has been countersunk in the shown area
    rive ring has been countersunk in the shown area)
  • Fitting Zx5 Crank Upgrade  + (B0001166)
  • PLC Source Control - Adding a Repository  + (Select View From the Drop-down menu select Team Explorer)
  • Troubleshoot - Permanent IP Address - Windows 7 Embedded - Beckhoff  + (Sometimes there is no possible way of connSometimes there is no possible way of connecting to a Beckhoff PC due to an IP address conflict. In this case there are two options: # The '''customer''' must find a monitor with DVI port, DVI cable, USB keyboard, USB mouse and complete the next steps. # Connect to the PLC via '''Remote Desktop''' from the front end PC using the PLC name (i.e F050B)ront end PC using the PLC name (i.e F050B))
  • Autocut Cutting Tall Profiles  + (Take 'AUTOLOAD' off before coming onto either of these profiles so the saw stops it automatic loading cycle)
  • Replacing Beckhoff PC  + (Take care to ensure all cables are replaced in the same relative positions Power on)
  • R0015287 Bench Assemble Shafts, Bearings and Pinions  + (Ensure shafts D0015556 and D0015555 are Ensure shafts D0015556 and D0015555 are clean before trial fitting . 1 check for any burrs or damage to shafts . Remove with File/emery tape 180 grit if present 2 Use compressed air to clean debris from all keyways on shafts . 3 Use Fe10 solvent to remove contaminants on shafts solvent to remove contaminants on shafts)
  • R0015338 Bench Assemble Serial Plate  + (The Correct Stamping and information is vital on the machine serial plate. Please double check with supervisor to confirm data before applied to serial plate !)
  • Saje uPVC Unloading Process  + (Including the chop saw table Leaving a clear route for the 2.4m x 7.5m table to roll in)
  • Setting Infeed Loading Wheel  + (Use the heaviest profile you can find - a Use the heaviest profile you can find - a full bar of door T or transom Place it under the wheel so it can be fed into the machine
    ...Ensure the infeed flights are out of the way

    ons-text">...Ensure the infeed flights are out of the way</div> </div><br/>)
  • Dokit - Creating A Work Instruction  + (To create a new Dokit, you need to login as a editor The Username is Gareth Green Password is available from the IT department <br/>)
  • Dokit - Editing Work Instructions  + (The dokit references for work instructionsThe dokit references for work instructions are tracked and stored on the monday board [https://stugaltd.monday.com/boards/3628350043 Work Instruction Dokit Tracker] Check to see if the instruction is already there using the search, there should be a link for it in the link column which will take you straight to the page. If it does not exist, it needs to be created first with this tutorial [[Dokit - Creating A Work Instruction]][[Dokit - Creating A Work Instruction]])