Une liste de toutes les pages qui ont la propriété « Step Content » avec la valeur « Any fixings/fasteners - such as bolts, nylocs, grubscrews, t-nuts etc - that are removed on stripdown should be put back where they were removed from and tightened into place. This helps on installation with the correct bolts being there and ready to use. Also, place in a bag and send out identical fixings and fasteners that are removed so there is spares on installation should any be vacant or lost during transit. Some examples of these are; - Transfer Beam - Button heads (M8 x 16) - E-Stop - Cap Heads (M4 x 12) - Fence Panels - Cap Heads (M6 x 35) - Saw Outfeed Tray - Cap Heads (M6 x 16) - Maytec Chamber Fixings - Cap Heads (m8 x 16 & 20 w/ penny / thick washers), M4, M5, M6 & M8 T-Nuts, ». Puisqu’il n’y a que quelques résultats, les valeurs proches sont également affichées.

Affichage de 101 résultats à partir du n°1.

Voir (200 précédentes | 200 suivantes) (20 | 50 | 100 | 250 | 500).


    

Liste de résultats

  • R0015094 Fit shafts and Pinions  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015349 Install Waste collection boxes  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015315 Fit Y Axis Drive components  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised <br/>)
  • R0000738 Pneumatic Installation Part 3  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015252 Bench Assemble Slider units  + (Attach P0000010 elbow fitting to cylinder P0001111 as shown)
  • R0015348 Fit Flexible Ducting  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0000738 Pneumatic Installation  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015281 Bench Assemble Transfer Sliders  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts when finalised)
  • J0001000H Autoflow Mk4 Mechanical installation-Alignment  + (Use footprint drawing to determine machine location for installation)
  • R0015312 Finalise V Notch Subframe  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015317 Install Rotary Ring  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015038 Bench Assemble V notch Datum Rollers  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0002794E Mount Width sensor  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015310 Install V Notch Subframe  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0000706 Bench assemble Infeed Datum rollers  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015319 Fit Guards and Doors  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015311 Install and Align Datum rollers  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015086 Pneumatic connections  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015297 Mount V Notch Datum Rollers  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015262 Drive shaft fitting  + (Attach 9 off B0001150 to load arms as shoAttach 9 off B0001150 to load arms as shown . ensure correct position is used for mounting of bearings . Use 2 off M8 x 30 socket countersink fasteners per bearing to align and fix to arms Ensure greasing point of bearing is facing towards the front of the machine as shown towards the front of the machine as shown)
  • R0015079 Infeed extension assembly  + (1 Fit levelling jig to frame extension section as shown 2 Use engineers level to adjust the level with the floor jacking bolts to set the jig level)
  • R0015264 Fit Loader chains to arms  + (It is vital to tension the securing grubscIt is vital to tension the securing grubscrew for the drive sprockets correctly Use a straight ended 4mm hex key and extension bar to apply as much tension as possible to the m8 grubscrew Then add 2 drops of self wicking thread locker to complete the tension processead locker to complete the tension process)
  • R0002913E Install and Align Rotary head Subframe PART 2  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015270 Bench assemble Shafts, bearings and sprockets  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015263 Mount drive motor for load shaft  + (Apply adhesive and lock off all grubscrews in spherical bearings in all positions (9 off bearings ))
  • Autoflow Maintenance - Gripper  + (Wipe away any excess oil, dirt or swarf. Apply oil lubricant and wipe of excess # Main X axis slideways # GY Gripper Y axis Slideway # GZ Gripper Z axis slideway)
  • VM Upgrade Hardware  + (With the machine turned off , find the FE PC and remove it as much as you need to gain access to the top cover. If you are upgrading the memory try and remove the PC to a flat surface.)
  • TB0431 Samsung Drive Parameter Setup  + (Using a stripped plug and making sure therUsing a stripped plug and making sure there is no power going through the plug during installation: # '''Live wire''' (Brown) in the top port # '''Neutral wire''' (Blue) in the second port # '''Ground wire''' (Green + Yellow) in the bottom port # The '''Joggers''' Serial port # Plug in and '''turn on''' plugial port # Plug in and '''turn on''' plug)
  • Convert TC2 Project to TC3  + ( #Open Visual Studio #Create a new TC3 pro #Open Visual Studio #Create a new TC3 project called [BuildNo] in c:\TwinCAT\Stuga\ #Make sure "Create Directory..." is Unticked #Right Click on the project name and select ‘Load Project from TwinCAT 2.11 Version…’ #Click Cancel on the two windows asking to convert the PLC project #Ignore or cancel any warnings about libraries (this part will be replaced later)
    ...Once created, you will have a copy of all the devices and boxes in the project with the correct naming.

    f all the devices and boxes in the project with the correct naming.</div> </div><br/> )
  • Changing Version Control to Visual Studio  + (Delete the versionControl folder completelDelete the versionControl folder completely
    ...This prevents confusion in the future of where the project exists

    prevents confusion in the future of where the project exists</div> </div><br/>)
  • Autocut Monthly Maintenance  + ([[Autocut Open Guard Doors|https://stuga.dokit.app/wiki/Autocut_Open_Guard_Doors]])
  • Full Version Upgrade TwinCAT3 WinMulti  + ([[Create a TwinCAT Project from Scratch]] This procedure ensures that the front end PC has the latest TwinCAT version, and that the PLC source control program is correctly integrated, meaning the latest PLC code version will be available)
  • Install markings and measurements ZX5  + (Any fixings/fasteners - such as bolts, nylAny fixings/fasteners - such as bolts, nylocs, grubscrews, t-nuts etc - that are removed on stripdown should be put back where they were removed from and tightened into place. This helps on installation with the correct bolts being there and ready to use. Also, place in a bag and send out identical fixings and fasteners that are removed so there is spares on installation should any be vacant or lost during transit. Some examples of these are; - Transfer Beam - Button heads (M8 x 16) - E-Stop - Cap Heads (M4 x 12) - Fence Panels - Cap Heads (M6 x 35) - Saw Outfeed Tray - Cap Heads (M6 x 16) - Maytec Chamber Fixings - Cap Heads (m8 x 16 & 20 w/ penny / thick washers), M4, M5, M6 & M8 T-Nuts,enny / thick washers), M4, M5, M6 & M8 T-Nuts,)
  • Correct Adjustment of Saw Anaconda Rotation  + ( # Ensure that the conduit is twisted / biased back # Ensure it misses the guard locking device when manually rotated # Lock off the locknuts in this biassed position )
  • Updating Teamviewer Host  + ( # Right click on the teamviewer icon in the taskbar (bottom right of screen) # Select Exit Teamviewer )
  • Stuertz Infeed - Check GY Position Parallelism  + ( #Datum the machine and move GY axis to ze #Datum the machine and move GY axis to zero, GZ to 25 #Place the jig against the backfence and offer it up to the Gripper Jaw #If the GY datum is set correctly, the rear outer face of the jig should be just in contact with the rear serrated jaw #If this is not the case, set GY datum correctly his is not the case, set GY datum correctly )
  • ACE PC Re-Flash  + (ctrl alt del)
  • Hikvision Camera Setup  + (<div class="annotatedImageDiv" typeof="
    SADP Tool Icon
    On the machine open the “SADPTool” . This is our camera finder and IP address modifier for the cameras
    )
  • ACEpc Changing IP address using netedit  + (This is supplied by customer. IT department <small>''If testing in house it needs to be on the 192.168.16.xxx range.''</small> <small>''e.g 192.168.16.101''</small>)
  • Installing VNC Server and Viewer  + (<nowiki>From the piggy back PC, connFrom the piggy back PC, connect to
    \\Bnnn\
    or
    \\Bnnn\saw
    [Where Bnnn is the build number - eg M012, F002 etc]
    on the older PC.

    If using the build number does not work, you may need to use IP addresses
    \\192.168.1.54\saw
    (Look up the IP address using ipconfig from the command prompt, or network settings)

    sing ipconfig from the command prompt, or network settings)</pre></div><br/></nowiki>)
  • Autoflow Maintenance - Sawing Centre  + ( * Remove any debris from clamp pads and rollers * Visually check the rollers and clamp pads for damage or excessive wear, oil rollers with supplied oil, visually check cylinder rods for damage )
  • Upgrade Autoflow to Windows 10  + ( *Ensure regional settings correct - corre *Ensure regional settings correct - correct date format *Rename the Ethernet Adaptors to Ethernet and EtherCAT *Ensure the [https://stuga.dokit.app/wiki/TwinCAT_Issue_-_EtherCAT_Network_Protocol_Missing TwinCAT Protocol is installed] on the EtherCAT adaptor *Teamviewer setup *Administrator password set to "Stuga001" *Add Stuga desktop image *Latest winMulti in c:\multi desktop image *Latest winMulti in c:\multi )
  • PC Recovery Process  + (- Turn off the PC - Plug in recovery USB. - Turn the PC back on - Keep pressing F12 until the boot selection screen shows. <br/>)
  • Ecoline - Disabling V axis To Swap Faulty Drive  + ([[Archiving a TwinCAT Project]])
  • Setting Profile Detection Laser Sensor  + (<div class="icon-instructions caution-i
    ...Incorrect L/D setting will make the sensor read back to front
    # Turn L/D adjustment clockwise so it is on its maximum "L" # Turn anticlockwise until Yellow light comes on # Turn clockwise until Yellow light goes off
    urn anticlockwise until Yellow light comes on # Turn clockwise until Yellow light goes off)
  • Ecoline Site Installation Guide  + (This is what the taper on the roller approach is for - to raise the profile onto the rollers)
  • Ecoline - Setting V Notches on winMulti Software  + (<div class="icon-instructions caution-i
    ...Ensure that the ecoline is producing consistent and reliable datum test results
    e ecoline is producing consistent and reliable datum test results</div> </div>)
  • Create a TwinCAT Project from Scratch  + (<div class="icon-instructions info-icon"> <div class="icon-instructions-icon"><i class="fa fa-info-circle"></i></div> <div class="icon-instructions-text">...From Z071 there is no twinSAFE project as the Estop circuit is hard wired</div> </div>)
  • Correcting Linearity with Rack Offset File  + (Write the error +\- next to each notch, meWrite the error +\- next to each notch, measuring from machining centre end (photo shown is RtoL feed machine). Repeat for each notch on each of the 3 bars Again, check for consistency. If there is any doubt that the results have not repeated consistently 3 times, then do not proceed consistently 3 times, then do not proceed)
  • Disabling a Tool Home or Tool Out Sensor  + (A change has to be made to one of the setup files, so you need to exit to the desktop)
  • Importing Picking List from Sage To Monday  + (A pick run is a chunk or set of Job Cards that will be picked in a controlled amount. This is normally 10-20 job cards. it is managed in this way to keep the amount of time between the allocation on Sage and the physical pick as short as possible.)
  • Guide to Fitting Eject Push Sensors on ZX Machines  + (A retrofit kit will be sent with all the pA retrofit kit will be sent with all the parts needed to carry out this task. The assembly number for the kit is R0019218. If you have any feedback regarding this kit, please use this assembly number. It is important to check the parts you have received against the assembly list to ensure you have nothing missing before starting the job.e nothing missing before starting the job.)
  • Commissioning - Off-Cut Laser Sensor  + (Adjust the "'''Light Dark'''" balance on tAdjust the "'''Light Dark'''" balance on the sensor. To do this, using a small flat head screwdriver, turn the light dark dial '''clockwise''' until the orange light goes off. Then slowly turn '''anti-clockwise''' until the orange light turns on again, when this happens re-turn a '''little clockwise''' to turn off the orange light.clockwise''' to turn off the orange light.)
  • ZX4 Infeed Roller Reinforcement  + (Align the infeed roller block so that it is square (check the roller with a straight edge against the other rollers). Fit the bracket using the 2 off M8 x 25 Bolts. Mark through the clearance holes on the bracket onto the roller block.)
  • R0015329 Fit Head Spindle Posts  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015034B ZX5 Module B Wiring Loom installation  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015146 Pneumatic pipe Installation Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000558E Bench Assemble Base and Turntable  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015034B ZX5 Module B Wiring Loom installation Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015146 Pneumatic pipe Installation Part 3  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000570B Bench Assemble 1st stage Ejector  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015333 Fit Clamp Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015034B ZX5 Module B Wiring Loom installation Part 3  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015328 Install Base and Turntable  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R000560 Bench Assemble Spindle  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015259 Mount roller beds to mainframe  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R000559 Bench assemble machined parts  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • Setting up an Ecoline Barcode Scanner  + (All refurbished Ecolines will now be proviAll refurbished Ecolines will now be provided with USB barcode scanners. This may be a hand held device or an 'Orbital' scanner attached to the infeed table depending on the customer's preference. Use the provided cable to plug the scanner in to the nearest available USB port. There will be 2 USB extension cables coming from the PC inside the cabinet. One will go to the console to control the keyboard and the touchscreen and the other will go to the infeed table junction box to control one or two barcode scanners.ox to control one or two barcode scanners.)
  • Commissioning a Beckhoff Axis  + (Ensure the axis.mul file is set up with the same axis Ids as the TwinCAT project Second number in axes.mul file)
  • Maintenance - Tensioning for R Axis on ZX3  + (Measure the deflection of the belt to be 5mm from its relaxed position)
  • Updating Zebra Firmware on ZD620 model  + (Both the zip files for the install of the Zdownloader and the ZPL version file can be located in G:\Builds\Install Files\Zebra Firmware. there is a manual for using the Zdonloader in with the zip file containing the ZPL version file .)
  • R0015295 Finalise wiring loom for Rotary head  + (Cables must be adjusted between each spindCables must be adjusted between each spindle to ensure the cable lengths are correct . 1 Start at cable point between 6 and 5 . Start with the light green ethercat cable with the right angle plug. Adjust so that 200mm is past the end of the spindle plate . See picture for detail. 2 Move to the next spindle connection between 5 and 4 and adjust the new right angled ethercat cable to match the length of the previous adjusted cable 3 Repeat this process working your way around the spindles to set all ethercat cablesnd the spindles to set all ethercat cables)
  • Upgrading Project File on TwinCAT2 System  + (Check the [https://stugaltd.monday.com/boards/304269981 Control Systems Log] board to look up the machine and the control system used This procedure only applies to TwinCAT2 For TwinCAT3 upgrades use [[Full Version Upgrade TwinCAT3 WinMulti]])
  • Removing or changing a Beckhoff AX8000 series servo drive  + (Circuit breaker will be labelled 'Servo Drives')
  • R0015327 Level Frame and quality Check  + (Clean all threads in frame using standard taps)
  • PLC Source Control - Working with GIT and TcXaeShell  + ( #Select '''Push''' #Message appears showing the successful push to the '''Origin''' which is in the remote cloud Repo )
  • Ecoline - Datum and MitreOffset Tests  + (Cut 3 lengths of outerframe around 1000mm Cut 3 lengths of outerframe around 1000mm long
    ...Make sure the gripper end of the profile has a clean edge - ie no swarf and profile tape is not "flapping" over the end

    ie no swarf and profile tape is not "flapping" over the end</div> </div><br/>)
  • R0015099 Guard panel drilling  + (Drill hinge panel as detailed 1 Clamp pDrill hinge panel as detailed 1 Clamp panel in position equalising edges to frame 2 Drill vertical face holes onto frame M6 tapped 3 Mark 4 off holes with M6 pointed grubscrew 4 Drill 4 off to 7.5 mm 5 Check correct drilling by fixing panel with M6 socket capslling by fixing panel with M6 socket caps)
  • CX5120 Replacement  + (Ensure replacement CX5120 is setup using   [[TB0451 CX5120 Beckhoff PC Setup|https://stuga.dokit.app/wiki/TB0451_CX5120_Beckhoff_PC_Setup]] before sending to site)
  • R0015254 Bench Assemble shafts, Bearings and Pinions  + (Ensure shafts D0015556 2 off and D0015555Ensure shafts D0015556 2 off and D0015555 2 off are clean before trial fitting . 1 check for any burrs or damage to shafts . Remove with File/emery tape 180 grit if present 2 Use compressed air to clean debris from all keyways on shafts . 3 Use Fe10 solvent to remove contaminants on shaftssolvent to remove contaminants on shafts)
  • GY GZ axis setup with Jetter Motors  + (Ensure that the profile support arm is held out of the way to avoid marking the blue infeed arm.)
  • Alignment guide using wire line  + (Firstly, identify the two datums that are required to set the wire line to. A wire line should be pulled tight and then anchored to give a wire line from the first and last component)
  • Autocut Adding New Profile  + (Firstly, we need to make sure that the proFirstly, we need to make sure that the profile will physically go through the machine, open the top gaurd door. Ideally, you will have a 1 metre offcut of the profile - work out the best way for the profile to go through the machine. Push the profile through the machine by hand to ensure no catching areas etc.e by hand to ensure no catching areas etc.)
  • TB0390 Fitting SR Datum Sensor  + (Fit U Bolt and Sensor Bar to Table Post on infeed side of saw. See Image for height)
  • ZX5 Installation Procedure 2023 Part 3 Guarding Conformity checks  + (Supplied fencing kit is fitted to module A under loader arms)
  • ZX5 Adjusting V Notch Depth and Position  + (If the blades do not meet properly, or form a "W" shape, the mechanical setup is not correct. Please follow procedure: [[ZX5 V Notch Blade Mechanical Setup|https://stuga.dokit.app/wiki/ZX5_V_Notch_Blade_Mechanical_Setup]] <br/>)
  • Fitting M8 Plug for EtherCAT Boxes  + (Inside the packet of the plug will be 5 coInside the packet of the plug will be 5 components: 1- Metal outer shell 2- Numbered insert 3- m8 IDC connector 4- Individual 'white' grommet 5- Additional 3 grommets
    ...The 'white' grommet and numbered insert may be stuck in the metal shell. Please check!
    Make sure you check that you have all of these parts before disposing of the packaging.
    gt;Make sure you check that you have all of these parts before disposing of the packaging.)
  • ZX5 - ZX3 Hepco alignment Module E Saw Infeed  + (Locations of jigs required mounting method)
  • Installation Procedure - Autoflow Mk4  + (Machining centre distance to infeed between frames =)
  • OBSOLETE Upgrade - ZX5 Energy Chain - Both Sides  + (IMPORTANT Check brackets visually to ensure they correct '''A0001074''' Horizontal Mount bracket required to allow pivoting)
  • B0000082b Motor replacement For Obsolete part B0000082  + (New motor B0000082b will need modification of drive key to function correctly. 5mm should be removed from key in situ as shown in photo This will enable clutch plate to move to desired position on assembly)
  • Commissioning - Z-Block Calibration  + (On the '''Service > IO''' tab use output '''Y214''' to turn the infeed turret. <br/>)
  • Updating Beckhoff TwinCAT3 Backend Version  + (On the desktop of the Beckhoff PC, right cOn the desktop of the Beckhoff PC, right click the Twincat Icon in the taskbar and select "About Twincat..." TwinCAT version is displayed. 3.4024.xx is needed
    ...The .xx is the build number. Generally, all .xx will be compatible, they release a new build number for bug fixes but will change the main version number when it becomes incompatible

    change the main version number when it becomes incompatible</div> </div><br/>)
  • Upgrading Autoflow TwinCAT2 to Win10 and TwinCAT3  + (infeedZeroToX=605 stopZeroToX=595 measureSensorPos1=1554)
  • Training Laser on Ecoline  + (Sensitivity also needs settings 5 full turns after turning anticlockwise until it goes Sensitivity then turn clockwise until on then the 5 turns.)
  • TB0451 CX5120 Beckhoff PC Setup  + (Go to Control Panel then ‘Region and Language’ and select ’English (United Kingdom)’.)
  • Allocations + issuing received parts  + (Populate the allocate column for each partPopulate the allocate column for each part in accordance to the pick bins that are available. The general rule is to prioritize allocation to the range of Bins of the Build numnber which is next to in line to be Built according to the production schedule. If there is no bin physically available for the Job car number shown it must be zero'd in the allocation quantity column and put into stock normally.antity column and put into stock normally.)
  • Flowline Turret Upgrade - Somatec  + (Remove all parts from the existing turret, to leave just the mounting plate and the cylinder and fittings etc, as shown)
  • R0010309 Ecoline Ultrasonic Material Loaded Upgrade  + (Remove old material load assembly from macRemove old material load assembly from machine. Held on by 2 off M6 socket caps indicated 2 Disconnect switch/sensor. Depending on variant fitted either Unscrew M8 plug connection to disconnect for sensor style Or Disconnect 2 off fork connections onto rear on switch 3 Disconnect bloweronto rear on switch 3 Disconnect blower)
  • Upgrade - R0000173 Conveyor Motor  + (Remove the existing motor-g/box, shaft and spider coupling)
  • Placing a TwinCAT3 Machine Under Source Control  + (See this tutorial for backing up (archiving) a TwinCAT3 project)
  • Fitting Y Axis energy chain strengthening plate  + (Take out the 2 bolts holding the energy chain end bracket to the Aluminium bracket.)
  • R0015243 ZX5 module A-C-E Frame levelling  + (Tap all holes to remove debris from coatinTap all holes to remove debris from coating process Ensure all holes cleaned after tapping with compressed air
    ...Ensure eye protection is worn when using compressed air

    ext">...Ensure eye protection is worn when using compressed air</div> </div><br/>)
  • R0015287 Bench Assemble Shafts, Bearings and Pinions  + (Ensure shafts D0015556 and D0015555 are Ensure shafts D0015556 and D0015555 are clean before trial fitting . 1 check for any burrs or damage to shafts . Remove with File/emery tape 180 grit if present 2 Use compressed air to clean debris from all keyways on shafts . 3 Use Fe10 solvent to remove contaminants on shafts solvent to remove contaminants on shafts)
  • R0015338 Bench Assemble Serial Plate  + (The Correct Stamping and information is vital on the machine serial plate. Please double check with supervisor to confirm data before applied to serial plate !)
  • Saje uPVC Unloading Process  + (Including the chop saw table Leaving a clear route for the 2.4m x 7.5m table to roll in)
  • Create a TwinCAT Project from Existing Project  + (The build needs to be the same machine typThe build needs to be the same machine type and have an identical EtherCAT box and drive setup You can create a backup in three ways # Create an archive of an open project (you need to run Visual Studio on the desktop of the machine in question) # Copy the contents of the c:\TwinCAT\Stuga\[BuildNo] folder from the "donor" to your new machine setup # Use VPN to connect to the back end of the machine and upload the project from the target, then save it locally. this needs a good internet connection and Teamviewer remote VPN installed on the remote Beckhoff PCte VPN installed on the remote Beckhoff PC)
  • ZX3 Counterweight Installation  + (Fit all 3 weight plates, and secure with the provided bolts and washers)
  • Relay Replacement  + (There Are 2 examples shown for this process. There is a clip to be unlatched on each relay shown, once unclipped this releases the relay which can then be pulled out. <br/>)
  • Hotswap Beckhoff PLC with Licence Slice Installed  + (There are a row of retaining clips on bot the top and bottom of the PC that hold it to the Din rail. Pop them open with a flathead screwdriver)
  • Air Pressure Switch Setup  + (This is usually called 'AIR'. From this point you will either need to have somebody watch the input on the screen or have means (eg dialled in on a laptop) to be able to watch the output while carrying out he next step.)
  • Autocut Taking A Backup  + (Through the winSaw software press '[F11] backup')
  • Autoflow Mk1-Mk3 Daily Maintenance  + (To check the machine is ready for productiTo check the machine is ready for production, a couple of simple tests can be run # Datum Test # Pos Test
    ...Do not attempt to make any adjustments to the machine on the basis of one test. If there is an error, run the test again twice more. !! Adjustments are only effective if the error is repeatable !!

    ...The machine tolerance is +/0.5mm, so there is no need to adjust if an inaccuracy is less than this tolerance (1mm back to back)

    olerance is +/0.5mm, so there is no need to adjust if an inaccuracy is less than this tolerance (1mm back to back)</div> </div><br/>)
  • Units of Measure modification CIM50  + (To make the item status of a product inactTo make the item status of a product inactive it needs to comply with all of the following conditions : Item has 0 in stock Item has 0 in quarantine Item does not exist on any live sales orders Item does not exist on any live purchase orders Item does not exist on any live works orders Item does not exist on a bill of material
    Please make a note of changes that are made stock levels allocations P.Os Works orders or BOM lists are amended to make an item inactive as these will have to all be re-entered after the unit of measure has been amended and saved.

    e re-entered after the unit of measure has been amended and saved.</div> </div><br/>)
  • R0015251B Bench Assemble X Axis Energy chain  + (1 Assemble 111 links together , ensure all links are orientated the same way . 2 Identify the female end of the assembled links 3 Fit 2 more links of A0001113, but fit in a reversed orientation)
  • R0015286B Bench Assemble X axis Energy Chain  + (Total links of for A0001113 Energy Chain is 95 Double check correct quantity)
  • R0000088E Stage 1 Spindle assemble  + (Linear rail B0000045 needs fitting to eachLinear rail B0000045 needs fitting to each spindle base
    ..Linear rails have a datum face indication. Attention must be paid for correct orientation
    1 Orientation of Datum face is as shown Ensure all linear rails and machined grooves in spindle plates are free from debris. Use compressed air. 2 Insert linear rail into each spindle base and drop in m6 x 20 socket caps with adhesive applied into all rail counterbores, do not screw in
    nd drop in m6 x 20 socket caps with adhesive applied into all rail counterbores, do not screw in)
  • R0015281 Bench Assemble Transfer Sliders  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts when finalised)
  • R0000738 Pneumatic Installation  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015348 Fit Flexible Ducting  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015252 Bench Assemble Slider units  + (Attach P0000010 elbow fitting to cylinder P0001111 as shown)
  • R0000738 Pneumatic Installation Part 3  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015315 Fit Y Axis Drive components  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised <br/>)
  • R0015349 Install Waste collection boxes  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015094 Fit shafts and Pinions  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015344 Bench Assemble Conveyor Parts  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015251 Bench Assemble X Axis components and Energy chain  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015286 Bench Assemble X axis Components and Energy Chain  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015323 Mount Electrical Cabinet  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015250 Bench Assemble Support Arms  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015275 Fit shafts and pinions  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015346 Conveyor blower system  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015027 Install Pneumatic Connection rail and Air Feeds  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)