OBSOLETE Upgrade - ZX5 Energy Chain - Both Sides

Cette page contient des modifications qui ne sont pas marquées pour la traduction.

Auteur avatarGareth Green | Dernière modification 11/08/2023 par Gareth Green Validée

Étape 1 - Remove existing energy chain and brackets

Étape 2 - Remove trays

Étape 3 - Remove tray mounting brackets from posts

Étape 4 - Add new tray mounting brackets



Étape 5 - Mount trays

Mount trays as per attached drawings:


R0015028C - MC Outfeed

R0015029C - Saw Infeed


Étape 6 - Mount the Energy Chain Brackets

IMPORTANT

Check brackets visually to ensure they correct


A0001074 Horizontal Mount bracket required to allow pivoting


Étape 7 - Mount energy chain

Ensure you have the correct number of chain links:


MC Outfeed - 177 links

Saw Infeed - 147 links


Openable on outside diameter.


Last xxxx number of links next to the carriage (on both sides of machine) need to be reversed so that the chain can bend backwards (see image)



Étape 8 - Run cables and pipework up the chain

Étape 9 - Test for full functionality

Commentaires

Published