Recherche par propriété

Cette page fournit une simple interface de navigation pour trouver des entités décrites par une propriété et une valeur nommée. D’autres interfaces de recherche disponibles comprennent la page recherche de propriété, et le constructeur de requêtes ask.

Recherche par propriété

Une liste de toutes les pages qui ont la propriété « Step Content » avec la valeur « # Go to the '''Image''' tab. # Go to the '''OSD Settings''' along the top tab. # Change the '''Camera Name''' to one that represents the cameras position i.e. "Saw Camera" or "Infeed Camera". # To add any additional information such as IP address. Fill in a row under '''Text Overlay''' and check mark the box next to it. Any information put on this will also show on recordings. # '''SAVE!''' <br/><span class="icon-instructions caution-icon"> <span class="icon-instructions-icon"><i class="fa fa-exclamation-triangle"></i></span> <span class="icon-instructions-text">...SAVE!</span> </span><br/> ». Puisqu’il n’y a que quelques résultats, les valeurs proches sont également affichées.

Affichage de 101 résultats à partir du n°1.

Voir (200 précédentes | 200 suivantes) (20 | 50 | 100 | 250 | 500).


    

Liste de résultats

  • Autoflow Maintenance - Infeed  + (Use a suitable foam cleaner for cleaning off the glue and tape residue left by the profile rolling along the beds)
  • R0015312 Finalise V Notch Subframe  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0002794E Mount Width sensor  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015313 Material Clamp Alignment  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0000572 Bench Assemble Centralise Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015311 Install and Align Datum rollers  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015321 Bench Assemble Guards and Doors  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015331 Mount Centralise Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015317 Install Rotary Ring  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015316 V notch Final Assembly Part 2  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015316 V notch Final Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015265 Mount Infeed arm covers and End guards  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015271 Mount buffer bars  + (Check D0015464B Infeed Rear Endfence has been drilled for m6 countersinks If not rework and note rework time)
  • R0015030B Bench assemble loader wheel  + (Attach cylinder mount block D0010238 to assembly with 4 off M6 x 20 socket caps)
  • R0015247 Fit X axis gearbox and Motor  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
  • R0015357 Fit Guards  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015269 Fit Frame ancillaries  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015274 Fit X Axis Gearbox and Motor  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
  • R0015266B mount completed assemblies  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015263 Mount drive motor for load shaft  + (Apply adhesive and lock off all grubscrews in spherical bearings in all positions (9 off bearings ))
  • Troubleshoot - Permanent IP Addresses - UVision Cameras  + (Using any Stuga PC on the same network as the target machines, search for the program '''CameraSetup.exe'''.)
  • Omron E5CVS PV Shift  + (H0 = No offset. Temp at Plate =230 degrees - Display on E5CSV = 240 Degrees L10 = - 10 degree. Temp at plate = 230 degrees - Display E5CSV = 230 Degrees H10 = +10 degree . Temp at plate = 230 degrees - Display E5CSV = 250 Degrees)
  • PLC Source Control - Selecting GIT as the source control Plug-in  + (When the error message : "Git is not the current Source Control plug-in" appears # Select the link to change the Plug-in)
  • TB0431 Samsung Drive Parameter Setup  + (Using a stripped plug and making sure therUsing a stripped plug and making sure there is no power going through the plug during installation: # '''Live wire''' (Brown) in the top port # '''Neutral wire''' (Blue) in the second port # '''Ground wire''' (Green + Yellow) in the bottom port # The '''Joggers''' Serial port # Plug in and '''turn on''' plugial port # Plug in and '''turn on''' plug)
  • Setting Gripper Nose  + (when it is in this position - Fully bottomwhen it is in this position - Fully bottomed make sure the Grip on comes down but doesn't catch the Grip nose. Notice the Dead stop bolt at bottom is hard up then set grip switch bolt so that the dead stop bolt gap is no more than 1mm when grip switch goes off.o more than 1mm when grip switch goes off.)
  • Hikvision Camera Setup  + ( # Go to the '''Image''' tab. # Go to the # Go to the '''Image''' tab. # Go to the '''OSD Settings''' along the top tab. # Change the '''Camera Name''' to one that represents the cameras position i.e. "Saw Camera" or "Infeed Camera". # To add any additional information such as IP address. Fill in a row under '''Text Overlay''' and check mark the box next to it. Any information put on this will also show on recordings. # '''SAVE!'''
    ...SAVE!

    ></div> <div class="icon-instructions-text">...SAVE!</div> </div><br/> )
  • Correct Adjustment of Saw Anaconda Rotation  + ( # Ensure that the conduit is twisted / biased back # Ensure it misses the guard locking device when manually rotated # Lock off the locknuts in this biassed position )
  • Setting Up Email Production Reports  + (Navigate to Settings->Parameters)
  • Installing VNC Server and Viewer  + (<nowiki>From the piggy back PC, connFrom the piggy back PC, connect to
    \\Bnnn\
    or
    \\Bnnn\saw
    [Where Bnnn is the build number - eg M012, F002 etc]
    on the older PC.

    If using the build number does not work, you may need to use IP addresses
    \\192.168.1.54\saw
    (Look up the IP address using ipconfig from the command prompt, or network settings)

    sing ipconfig from the command prompt, or network settings)</pre></div><br/></nowiki>)
  • Autoflow Power On  + ((minimum 6 bar to machine))
  • Autoflow Maintenance - Outfeed Table  + ( * Clean Stainless Steel Bed of swarf and * Clean Stainless Steel Bed of swarf and remove any tape that may have transferred onto the bed during normal operation * Lightly oil shaft on underside of bed, lightly oil cylinder rods * Lghtly oil Hepco rail, 1 -2 pumps of grease into Linear Bearings * Use a suitable foam cleaner for cleaning off the glue and tape residue left by the profile rolling along the beds * Check Hepco rail, Linear Bearings, Shafts and cylinders for damage or wear gs, Shafts and cylinders for damage or wear )
  • PC Recovery Process  + (- Turn off the PC - Plug in recovery USB. - Turn the PC back on - Keep pressing F12 until the boot selection screen shows. <br/>)
  • TEST JAMIE B  + (<big>This means prepping the changing area so everything is in reach.</big> *(6) Nappies *(2) Baby wipes *(3) Nappy Bag *(4) Change of clothes *(5) A toy (Distraction) <br/>)
  • Commissioning - Off-Cut Laser Sensor  + (Adjust the "'''Light Dark'''" balance on tAdjust the "'''Light Dark'''" balance on the sensor. To do this, using a small flat head screwdriver, turn the light dark dial '''clockwise''' until the orange light goes off. Then slowly turn '''anti-clockwise''' until the orange light turns on again, when this happens re-turn a '''little clockwise''' to turn off the orange light.clockwise''' to turn off the orange light.)
  • ZX4 Infeed Roller Reinforcement  + (Align the infeed roller block so that it is square (check the roller with a straight edge against the other rollers). Fit the bracket using the 2 off M8 x 25 Bolts. Mark through the clearance holes on the bracket onto the roller block.)
  • R0015087 Pneumatic Connections  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000571 Fit and Level Cut Tables , Finalise Eject  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015337 Bench Assemble Guarding Components  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000574 Fit Motor and Swarf Chute  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015333 Fit Clamp Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015326 Bench Assemble Roller Backfences  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000558E Bench Assemble Base and Turntable Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015328 Install Base and Turntable  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015064 Bench Assemble Clamp Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015246 Fit Hepco Drive Beam Cylinder  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015334 Fit Centralise Front Table  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015267 Assemble Backfences, Fit and Align  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015341 Bench Assemble Electrical Cabinet with Pneumatics and controls  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015037 Bench Assemble SY Assembly Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015146 Pneumatic pipe Installation  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015085 Mount SR Datum Sensor and Flag  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015259 Mount roller beds to mainframe  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015064 Bench Assemble Clamp Assembly Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015146 Pneumatic pipe Installation Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015330 Fit 1st stage Ejector and Level Base  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R000560 Bench Assemble Spindle  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015335 Mount Electrical Cabinet  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015146 Pneumatic pipe Installation Part 3  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • ZX5 Installation Procedure 2023 Pneumatic connections  + (All control pneumatic connections will be All control pneumatic connections will be identified with identification numbers All permanently fed supply lines will be identified by the use of Red pneumatic pipe All Emergency stop switched air feeds will be identified by the use of Blue pneumatic pipeentified by the use of Blue pneumatic pipe)
  • Setting up an Ecoline Barcode Scanner  + (All refurbished Ecolines will now be proviAll refurbished Ecolines will now be provided with USB barcode scanners. This may be a hand held device or an 'Orbital' scanner attached to the infeed table depending on the customer's preference. Use the provided cable to plug the scanner in to the nearest available USB port. There will be 2 USB extension cables coming from the PC inside the cabinet. One will go to the console to control the keyboard and the touchscreen and the other will go to the infeed table junction box to control one or two barcode scanners.ox to control one or two barcode scanners.)
  • R0000299 Stroke assembly rebuild Part 2  + (Always use Loctite 243 on all fasteners fitted unless stated different All bearings should be an acceptable fit, with Loctite 641 and FE10 solvent used if required All fasteners should be marked once finalised)
  • ZX5 Production R0000548E Module G to R0015040 Module F alignment  + ( # X axis of module is levelled from the t # X axis of module is levelled from the two indicated points . Use a 2 meter straight edge between these points and an engineers level on top # y axis is levelled from these two indicated points . an engineers level rested on this face is sufficient for levelling ed on this face is sufficient for levelling )
  • Maintenance - Tensioning for R Axis on ZX3  + (Measure the deflection of the belt to be 5mm from its relaxed position)
  • R0015295 Finalise wiring loom for Rotary head  + (Cables must be adjusted between each spindCables must be adjusted between each spindle to ensure the cable lengths are correct . 1 Start at cable point between 6 and 5 . Start with the light green ethercat cable with the right angle plug. Adjust so that 200mm is past the end of the spindle plate . See picture for detail. 2 Move to the next spindle connection between 5 and 4 and adjust the new right angled ethercat cable to match the length of the previous adjusted cable 3 Repeat this process working your way around the spindles to set all ethercat cablesnd the spindles to set all ethercat cables)
  • R0015327 Level Frame and quality Check  + (Clean all threads in frame using standard taps)
  • ZX5 Production R0015040 Module F to R0015001B Module E alignment  + (Position module F at end of Module E infeed frame Approximately Align Saw roller back fences to Saw infeed back fences Approximately align X axis position by setting the to frames spaced at the distance shown of 20mm)
  • R0015284 Frame ancillaries  + (Fit 5 off basket support bracket to pre drilled holes at indicated points . Secure using M8 x 20 socket caps and Large M8 washers)
  • R0015244 Frame ancillaries Fitting  + (Fit 5 off basket support bracket to pre drilled holes at indicated points . Secure using M8 x 20 socket caps and Large M8 washers)
  • R0015268 Pneumatic module Test  + (Ensure area is clear and free from personnel)
  • VSM 20-30-P VertiQuad Heater Plate Setting  + (First, make sure the heater plates are cooFirst, make sure the heater plates are cool enough to work on. If not then gloves will be required to protect your hands from the heat Put the machine into input/output mode. This will then allow us to move the heater plates into a position to be worked on. Ensure the items highlighted in GREEN are on.ure the items highlighted in GREEN are on.)
  • TB0390 Fitting SR Datum Sensor  + (Fit U Bolt and Sensor Bar to Table Post on infeed side of saw. See Image for height)
  • Stuertz Welder - Setting Barcode Reader  + (If this is a Zebra scanner, the Zebra CDC scanner program will be installed already. For other manufacturers, this may need to be downloaded from the internet <br/>)
  • R0015280 Module E Pneumatic Tests  + (In this process pneumatic outputs will be In this process pneumatic outputs will be tested in a non emergency stop environment Ensure safe working practice is followed * Ensure Machine test area is clear from personnel and all staff are aware of testing procedure commencing * Ensure all Air connection lines are connected * Ensure all walkways are not impeded by trailing pipes/leads * Ensure all mechanical assemblies are at a sufficient stage for testinglies are at a sufficient stage for testing)
  • R0015257 Module C Pneumatic Tests  + (In this process pneumatic outputs will be In this process pneumatic outputs will be tested in a non emergency stop environment Ensure safe working practice is followed
    * Ensure Machine test area is clear from personnel and all staff are aware of testing procedure commencing * Ensure all Air connection lines are connected * Ensure all walkways are not impeded by trailing pipes/leads * Ensure all mechanical assemblies are at a sufficient stage for testing
    assemblies are at a sufficient stage for testing)
  • Flowline 6 to 6o5m Extension  + (Clean and remove any dirt/grease/imperfections on the box section ready the the new rails. If any of the tapped holes are compromised, re-tap 6mm.)
  • PC Bios Power settings  + (Keep pressing the “DELETE “button on the kKeep pressing the “DELETE “button on the keyboard until the PC goes into the BIOS mode and you see a screen similar to the ones shown below. If the BIOS screen does not show wait for the PC to LOGIN into windows and then shut-down or restart the PC again and retry using the delete button as described above. The Menu Will look something similar to thise Menu Will look something similar to this)
  • ZX5 MH Infeed Basic IO Test and Setup  + (Make sure the reset of the Estop circuit wMake sure the reset of the Estop circuit works. Be aware when resetting this will reset the air to home all pneumatics. Test each emergency stop button individually (Button box, infeed rear middle and end) making sure this breaks the circuit when pressed and the air is dumped. The Infeed beam sensor should be tested, when broken should also break the circuit and dump the air. Check on Service menu - IO tab that each input works correctly for each Estop unit.input works correctly for each Estop unit.)
  • C0001005MM Micromech Stepper Motor Assembly  + (Mark the motor face as the picture to giveMark the motor face as the picture to give the correct mounting position A 3mm hole must be drilled in this position at a depth of 5mm . Caution, damage can be caused to motor if this depth is not adhered to. Increase drill sizes incrementally when drilling, to ensure a good sized 3mm hole Use masking tape to stop swarf entering the stepper motor housing Use a drop of Loctite 270 to ensure dowel remains in place when fitted ensure dowel remains in place when fitted)
  • Install markings and measurements ZX5  + (Measure and mark up the distance between tMeasure and mark up the distance between two points (one on each) of the two modules. Mark up the points in a place where it is easy to read the markings and simply practical to get the two modules in a similar position (gap between the two) on installation - preferably on the front and the back of the modules. This makes it easier and closer to adjusting the loadpos and datum on the x-axis once setting up accuracy.um on the x-axis once setting up accuracy.)
  • R0015256 Pneumatic Connections  + (6mm black air pipe Pipe identified as 126mm black air pipe Pipe identified as 1259 9 off pop up C cylinders to be connected (1) Ensure enough slack is left on pipe between basket and cylinder to allow full range of movement
    *(1) 6mm tee feeds cylinder above and to the left *(2) 6mm tee feeds cylinder above and ring main left and right *(3) 6mm tee feeds cylinder above and ring main left and right *(4) 6mm tee feeds cylinder above and ring main left and right *(5) 6mm tee feeds valve below and ring main left and right *(6) 6mm tee feeds cylinder above and ring main left and right *(7) 6mm tee feeds cylinder above and ring main left and right *(8) 6mm tee feeds cylinder above and cylinder to the right
    e feeds cylinder above and cylinder to the right)
  • OBSOLETE Upgrade - ZX5 Energy Chain - Both Sides  + (IMPORTANT Check brackets visually to ensure they correct '''A0001074''' Horizontal Mount bracket required to allow pivoting)
  • Commissioning - Z-Block Calibration  + (On the '''Service > IO''' tab use output '''Y214''' to turn the infeed turret. <br/>)
  • TB0426 Replacement Zebra Printer Setup  + (Open box, unwrap printer, plug in power and plug Ethernet connected to network to the printer. As the printer boots up there will be a red light displayed on the front. After around 30 seconds this will turn green as the printer completes boot up.)
  • TB0398 Assembly of ZX4 Screen Cover  + (Orientate the plastic plate to fit inside the metal hinge piece, noting which way is the length and which is the width.)
  • R0015320 Pneumatic Output Test  + (Output testing will be carried out under a no-emergency stop situation ensure pcl coupling is used for ability for quick disconnection Ensure all colleagues are aware of testing and ensure good working practise is followed)
  • R0015336 Pneumatic Output Testing Part 2  + (Output testing will require valve operatioOutput testing will require valve operation with no e/s circuit Ensure the following Work area is clear from all components not required for testing All colleagues are aware of the procedure being undertaken No additional colleagues are working on the module PCL coupling is accessible to release pressure in case of emergency Testing procedure is fully adhered tocy Testing procedure is fully adhered to)
  • R0015336 Pneumatic Output Testing  + (Output testing will require valve operatioOutput testing will require valve operation with no e/s circuit Ensure the following Work area is clear from all components not required for testing All colleagues are aware of the procedure being undertaken No additional colleagues are working on the module PCL coupling is accessible to release pressure in case of emergency Testing procedure is fully adhered toy Testing procedure is fully adhered to)
  • Training Laser on Ecoline  + (Sensitivity also needs settings 5 full turns after turning anticlockwise until it goes Sensitivity then turn clockwise until on then the 5 turns.)
  • TB0415 Method to Prevent Loosening of Saw Blade  + (Position on shaft not important.)
  • Runing MRP  + (Press the Planning Tab > Read demand > ok The demand will then read with a load screen. Once this has finished move on to the next step)
  • Programming Eaton DE Drive  + (Set these references P-20 to P-23 to 50Hz so it will not matter what input 3 or 4 is set to - it will always be 50Hz)
  • Upgrade - Gripper Slider Mechanism  + (Remove all existing parts, including the profile lever, slideway and bearings, and the spring. Install new stronger slideway)
  • Flowline Turret Upgrade - Somatec  + (Remove all parts from the existing turret, to leave just the mounting plate and the cylinder and fittings etc, as shown)
  • R0010309 Ecoline Ultrasonic Material Loaded Upgrade  + (Remove old material load assembly from macRemove old material load assembly from machine. Held on by 2 off M6 socket caps indicated 2 Disconnect switch/sensor. Depending on variant fitted either Unscrew M8 plug connection to disconnect for sensor style Or Disconnect 2 off fork connections onto rear on switch 3 Disconnect bloweronto rear on switch 3 Disconnect blower)
  • Move SR Datum Sensor to Higher Level R0019217  + (Replace the upper brace plate with D0016338. This has the detection plate for the SR axis added on the top)
  • Replacing Beckhoff PC  + (Take care to ensure all cables are replaced in the same relative positions Power on)
  • Laser Setup on Flowline/ZX3 for Laser Holes  + (The laser sender needs to have a clear patThe laser sender needs to have a clear path to the laser receiver, its really important that this is parallel and the beam does not bounce off the inside of any of the aluminium mounting block. Slacken off the Nuts above and below Laser to move up/down and side/side.below Laser to move up/down and side/side.)
  • TB0301 Autoflow Saw Head Reinforcement - Additional Enhancements  + (The 2 carriage assemblies are as shown. FiThe 2 carriage assemblies are as shown. First, the rails need to be loosely installed onto the horizontal Maytec extrusion, allowing for lateral adjustment. Parts D0010710, D00010711 and B0000046 are to be assembled, as shown. Two of these sub-assemblies are required. Two of these sub-assemblies are required.)
  • TB0445 ZX5 Setup - Infeed Measure Sensor Calibration  + (The laser should be aligned to ensure the The laser should be aligned to ensure the beam is level up / down and parallel to the backfence. The path should follow the Yellow edge of the lift rollers on the infeed table. Length feedback from the measurement system is visible all the time on the service form.
    # Measure and mark the infeed table at fixed positions from the loading fence at MH end – (3m, 4m, 5m, 6m) # Use a short offcut of profile with a label on the end to act a a fixed reflector at the marked positions – check against the feedback on the screen. # Adjust the lengthMeasureOffset parameter to get the screen measurements to match reality (+/-10mm)
    e screen measurements to match reality (+/-10mm))
  • Setting Ultrasonic Sensor - Horizontal  + (The sensor will not work unless there is 30mm clearance to minimum position)
  • GE Control Components Changeover  + (The supplier that we use for the supply ofThe supplier that we use for the supply of our control components advised us of the need to changeover. The components that have been made unavailable are all of the GE components. This includes, all MCB's, all contactors (24Vdc, 24Vac, 230Vac), all motor overloads and any auxiliary components to go with these devices. See pictures for reference.these devices. See pictures for reference.)
  • WinDelay for Twincat Startup  + (This can be downloaded from Dropbox (Stuga Machinery Ltd)\Service\WinStartDelay\winstartdelay.zip)
  • Air Pressure Switch Setup  + (This is usually called 'AIR'. From this point you will either need to have somebody watch the input on the screen or have means (eg dialled in on a laptop) to be able to watch the output while carrying out he next step.)
  • Fitting R0019199 Upgrade: Autoflow Slewing Ring Guard Kit  + (This procedure must be done in conjunction with moving the SR Axis Datum to a position higher and ant the front of the machine to [[Move SR Datum Sensor to Higher Level R0019217]] <br/>)
  • Setting up NAS Server - MyCloud EX2  + (Use IPScan to find the address)
  • R0015285 Bench Assemble Pneumatic Rail  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015084 Bench assemble and Drill Off Swarf chutes  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015119 Mount Assemblies  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts when finalised)
  • R0015095 Bench Assemble Infeed Support Arms  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015315 Fit Y Axis Drive components  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised <br/>)
  • R0015314 Fit Z Axis Drive components  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015093 Bench Assemble Transfer Beam  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts when finalised)
  • R0015242 Level and Adjust Roller beds module C and E  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015027 Install Pneumatic Connection rail and Air Feeds  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015114 Bench Assemble Valve Banks and Regulators  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015352 Mount Buffer Beams  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0002916 Install Machine Trunking  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0000738 Pneumatic Installation Part 2  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015340 Drill, Assemble and Mount Electrical Cabinet  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015346 Conveyor blower system  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015028D ZX5 Hepco Beam Alignment Module C part 2  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts once finalised)
  • R0015347 Bench Assemble Duplex extraction unit  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015323 Mount Electrical Cabinet  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015091 Mount Outfeed Beam Sensor  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015277 Set Drive pinions in position  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
  • R0015345 Conveyor Mounting Brackets  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)