Une liste de toutes les pages qui ont la propriété « Step Content » avec la valeur « 1 Use 1 meter straight edge to check alignment of rollers. Identify which direction movement is required to achieve alignment of all rollers. Tolerance 0.002"/0.05mm 2 Adjust using shim at indicated point on either / both arms <span class="icon-instructions caution-icon"> <span class="icon-instructions-icon"><i class="fa fa-exclamation-triangle"></i></span> <span class="icon-instructions-text">...Each arm should only ever have 1 side with shim This retains datum positions</span> </span> 3 Adjust until all roller are within tolerance to straight edge ». Puisqu’il n’y a que quelques résultats, les valeurs proches sont également affichées.

Affichage de 101 résultats à partir du n°1.

Voir (200 précédentes | 200 suivantes) (20 | 50 | 100 | 250 | 500).


    

Liste de résultats

  • R0015316 V notch Final Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015297 Mount V Notch Datum Rollers  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0000572 Bench Assemble Centralise Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015319 Fit Guards and Doors  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015321 Bench Assemble Guards and Doors  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015331 Mount Centralise Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015325 Mount Infeed Clamp  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015317 Install Rotary Ring  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015101 Bench Assemble Take Up Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015316 V notch Final Assembly Part 2  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015312 Finalise V Notch Subframe  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015263 Mount drive motor for load shaft  + (Apply adhesive and lock off all grubscrews in spherical bearings in all positions (9 off bearings ))
  • R0015271 Mount buffer bars  + (Check D0015464B Infeed Rear Endfence has been drilled for m6 countersinks If not rework and note rework time)
  • R0015030B Bench assemble loader wheel  + (Attach cylinder mount block D0010238 to assembly with 4 off M6 x 20 socket caps)
  • R0015266B mount completed assemblies  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015357 Fit Guards  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015274 Fit X Axis Gearbox and Motor  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
  • R0015324 Install pipe and cable looms  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015247 Fit X axis gearbox and Motor  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
  • Omron E5CVS PV Shift  + (H0 = No offset. Temp at Plate =230 degrees - Display on E5CSV = 240 Degrees L10 = - 10 degree. Temp at plate = 230 degrees - Display E5CSV = 230 Degrees H10 = +10 degree . Temp at plate = 230 degrees - Display E5CSV = 250 Degrees)
  • VM Upgrade Hardware  + (With the machine turned off , find the FE PC and remove it as much as you need to gain access to the top cover. If you are upgrading the memory try and remove the PC to a flat surface.)
  • Z Transom Width Measurement  + (A straight faced piece of profile the same height as the Z section or taller or a piece of steel straight edge or the like; then lastly a Z section profile for measuring.)
  • Autocut Regular Maintenance  + ([[Autocut Open Guard Doors|https://stuga.dokit.app/wiki/Autocut_Open_Guard_Doors]])
  • R0015332 Mount Backfences and Align  + (1 Use 1 meter straight edge to check alig1 Use 1 meter straight edge to check alignment of rollers. Identify which direction movement is required to achieve alignment of all rollers. Tolerance 0.002"/0.05mm 2 Adjust using shim at indicated point on either / both arms
    ...Each arm should only ever have 1 side with shim This retains datum positions
    3 Adjust until all roller are within tolerance to straight edge
    </div> </div> 3 Adjust until all roller are within tolerance to straight edge)
  • Setting Up Email Production Reports  + (Navigate to Settings->Parameters)
  • Installing VNC Server and Viewer  + (<nowiki>From the piggy back PC, connFrom the piggy back PC, connect to
    \\Bnnn\
    or
    \\Bnnn\saw
    [Where Bnnn is the build number - eg M012, F002 etc]
    on the older PC.

    If using the build number does not work, you may need to use IP addresses
    \\192.168.1.54\saw
    (Look up the IP address using ipconfig from the command prompt, or network settings)

    sing ipconfig from the command prompt, or network settings)</pre></div><br/></nowiki>)
  • Autoflow Maintenance - Outfeed Table  + ( * Clean Stainless Steel Bed of swarf and * Clean Stainless Steel Bed of swarf and remove any tape that may have transferred onto the bed during normal operation * Lightly oil shaft on underside of bed, lightly oil cylinder rods * Lghtly oil Hepco rail, 1 -2 pumps of grease into Linear Bearings * Use a suitable foam cleaner for cleaning off the glue and tape residue left by the profile rolling along the beds * Check Hepco rail, Linear Bearings, Shafts and cylinders for damage or wear gs, Shafts and cylinders for damage or wear )
  • Autoflow Maintenance - Machining Centre  + (Check level of grease in Auto lube Part replacement order code is M0001047)
  • ZX4 Infeed Roller Reinforcement  + (Align the infeed roller block so that it is square (check the roller with a straight edge against the other rollers). Fit the bracket using the 2 off M8 x 25 Bolts. Mark through the clearance holes on the bracket onto the roller block.)
  • R0000713E Bench Assemble R Axis Limit Assembly  + (All bolts must have Loctite 243 adhesive applied unless otherwise stated. All bolts must be marked with pen once completed to indicate adhesive and correct tension has been applied)
  • R0015334 Fit Centralise Front Table  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015330 Fit 1st stage Ejector and Level Base  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015087 Pneumatic Connections  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000558E Bench Assemble Base and Turntable Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015267 Assemble Backfences, Fit and Align  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015064 Bench Assemble Clamp Assembly Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015146 Pneumatic pipe Installation  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015326 Bench Assemble Roller Backfences  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000558E Bench Assemble Base and Turntable  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015146 Pneumatic pipe Installation Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015085 Mount SR Datum Sensor and Flag  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015146 Pneumatic pipe Installation Part 3  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000571 Fit and Level Cut Tables , Finalise Eject  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015333 Fit Clamp Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015335 Mount Electrical Cabinet  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015246 Fit Hepco Drive Beam Cylinder  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R000560 Bench Assemble Spindle  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015337 Bench Assemble Guarding Components  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015037 Bench Assemble SY Assembly Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015064 Bench Assemble Clamp Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R000559 Bench assemble machined parts  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0015259 Mount roller beds to mainframe  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000574 Fit Motor and Swarf Chute  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
  • R0000299 Stroke assembly rebuild Part 2  + (Always use Loctite 243 on all fasteners fitted unless stated different All bearings should be an acceptable fit, with Loctite 641 and FE10 solvent used if required All fasteners should be marked once finalised)
  • ZX5 Production R0000548E Module G to R0015040 Module F alignment  + ( # X axis of module is levelled from the t # X axis of module is levelled from the two indicated points . Use a 2 meter straight edge between these points and an engineers level on top # y axis is levelled from these two indicated points . an engineers level rested on this face is sufficient for levelling ed on this face is sufficient for levelling )
  • R0015295 Finalise wiring loom for Rotary head  + (Cables must be adjusted between each spindCables must be adjusted between each spindle to ensure the cable lengths are correct . 1 Start at cable point between 6 and 5 . Start with the light green ethercat cable with the right angle plug. Adjust so that 200mm is past the end of the spindle plate . See picture for detail. 2 Move to the next spindle connection between 5 and 4 and adjust the new right angled ethercat cable to match the length of the previous adjusted cable 3 Repeat this process working your way around the spindles to set all ethercat cablesnd the spindles to set all ethercat cables)
  • R0015327 Level Frame and quality Check  + (Clean all threads in frame using standard taps)
  • ZX5 Production R0015040 Module F to R0015001B Module E alignment  + (Position module F at end of Module E infeed frame Approximately Align Saw roller back fences to Saw infeed back fences Approximately align X axis position by setting the to frames spaced at the distance shown of 20mm)
  • Batch Printing Part Drawings  + (Double click on the P.O the drawings are required to be batch printed for.)
  • Saw machining centre alignment and level check points  + (Ensure all faces being checked are clean and free from dust and swarf . Accuracy of level reading is vital in this operation)
  • R0015268 Pneumatic module Test  + (Ensure area is clear and free from personnel)
  • VSM 20-30-P VertiQuad Heater Plate Setting  + (First, make sure the heater plates are cooFirst, make sure the heater plates are cool enough to work on. If not then gloves will be required to protect your hands from the heat Put the machine into input/output mode. This will then allow us to move the heater plates into a position to be worked on. Ensure the items highlighted in GREEN are on.ure the items highlighted in GREEN are on.)
  • TB0390 Fitting SR Datum Sensor  + (Fit U Bolt and Sensor Bar to Table Post on infeed side of saw. See Image for height)
  • Autoflow Hepco Slewing Ring - Journal Adjustment  + (Identify the blank spindles - these are the ones with no machining stations on them.)
  • Setting Motor Overload Relays  + (In order to read the motor plate we need tIn order to read the motor plate we need to know 3 pieces of information *Whether the motor is wired in star or delta *The frequency at which the motor is running *The voltage at which the motor is running Whether the motor is wired in star or delta depends on the application. Refer to the electrical diagrams to find out which it is. For example, the saw blade motor is wired in star, whereas most extractor motors are wired in delta. The UK standard for a three phase electrical supply is 415v at 50Hz. Unless the supply to a motor runs through an inverter (i.e the spindles) this is also the standard for our machines. Using the picture on the right as an example, we know the motor will be running at 50Hz (1) so we can disregard the information on the right of the plate as this provides figures for a 60Hz supply. Looking at the box numbered (2) we can work out that this motor would be wired in delta if it were running on a single phase 230v supply. However, we know that this is a three phase supply and will be wired in star. So when we move on to the box numbered (3) we will be looking at the number on the right hand side of the slash. Therefore, this particular motor would need an Overload Relay set to 3.00A.would need an Overload Relay set to 3.00A.)
  • R0015280 Module E Pneumatic Tests  + (In this process pneumatic outputs will be In this process pneumatic outputs will be tested in a non emergency stop environment Ensure safe working practice is followed * Ensure Machine test area is clear from personnel and all staff are aware of testing procedure commencing * Ensure all Air connection lines are connected * Ensure all walkways are not impeded by trailing pipes/leads * Ensure all mechanical assemblies are at a sufficient stage for testinglies are at a sufficient stage for testing)
  • R0015257 Module C Pneumatic Tests  + (In this process pneumatic outputs will be In this process pneumatic outputs will be tested in a non emergency stop environment Ensure safe working practice is followed
    * Ensure Machine test area is clear from personnel and all staff are aware of testing procedure commencing * Ensure all Air connection lines are connected * Ensure all walkways are not impeded by trailing pipes/leads * Ensure all mechanical assemblies are at a sufficient stage for testing
    assemblies are at a sufficient stage for testing)
  • Flowline 6 to 6o5m Extension  + (Clean and remove any dirt/grease/imperfections on the box section ready the the new rails. If any of the tapped holes are compromised, re-tap 6mm.)
  • ZX5 MH Infeed Basic IO Test and Setup  + (Make sure the reset of the Estop circuit wMake sure the reset of the Estop circuit works. Be aware when resetting this will reset the air to home all pneumatics. Test each emergency stop button individually (Button box, infeed rear middle and end) making sure this breaks the circuit when pressed and the air is dumped. The Infeed beam sensor should be tested, when broken should also break the circuit and dump the air. Check on Service menu - IO tab that each input works correctly for each Estop unit.input works correctly for each Estop unit.)
  • C0001005MM Micromech Stepper Motor Assembly  + (Mark the motor face as the picture to giveMark the motor face as the picture to give the correct mounting position A 3mm hole must be drilled in this position at a depth of 5mm . Caution, damage can be caused to motor if this depth is not adhered to. Increase drill sizes incrementally when drilling, to ensure a good sized 3mm hole Use masking tape to stop swarf entering the stepper motor housing Use a drop of Loctite 270 to ensure dowel remains in place when fitted ensure dowel remains in place when fitted)
  • Install markings and measurements ZX5  + (Measure and mark up the distance between tMeasure and mark up the distance between two points (one on each) of the two modules. Mark up the points in a place where it is easy to read the markings and simply practical to get the two modules in a similar position (gap between the two) on installation - preferably on the front and the back of the modules. This makes it easier and closer to adjusting the loadpos and datum on the x-axis once setting up accuracy.um on the x-axis once setting up accuracy.)
  • R0015256 Pneumatic Connections  + (6mm black air pipe Pipe identified as 126mm black air pipe Pipe identified as 1259 9 off pop up C cylinders to be connected (1) Ensure enough slack is left on pipe between basket and cylinder to allow full range of movement
    *(1) 6mm tee feeds cylinder above and to the left *(2) 6mm tee feeds cylinder above and ring main left and right *(3) 6mm tee feeds cylinder above and ring main left and right *(4) 6mm tee feeds cylinder above and ring main left and right *(5) 6mm tee feeds valve below and ring main left and right *(6) 6mm tee feeds cylinder above and ring main left and right *(7) 6mm tee feeds cylinder above and ring main left and right *(8) 6mm tee feeds cylinder above and cylinder to the right
    e feeds cylinder above and cylinder to the right)
  • OBSOLETE Upgrade - ZX5 Energy Chain - Both Sides  + (IMPORTANT Check brackets visually to ensure they correct '''A0001074''' Horizontal Mount bracket required to allow pivoting)
  • Stuertz Infeed - Align and dowel GX rack  + (Using the T0001090 alignment tool, check each 1m section of the rack is aligned to its neighbour <br/>)
  • TB0426 Replacement Zebra Printer Setup  + (Open box, unwrap printer, plug in power and plug Ethernet connected to network to the printer. As the printer boots up there will be a red light displayed on the front. After around 30 seconds this will turn green as the printer completes boot up.)
  • TB0398 Assembly of ZX4 Screen Cover  + (Orientate the plastic plate to fit inside the metal hinge piece, noting which way is the length and which is the width.)
  • R0015320 Pneumatic Output Test  + (Output testing will be carried out under a no-emergency stop situation ensure pcl coupling is used for ability for quick disconnection Ensure all colleagues are aware of testing and ensure good working practise is followed)
  • R0015336 Pneumatic Output Testing Part 2  + (Output testing will require valve operatioOutput testing will require valve operation with no e/s circuit Ensure the following Work area is clear from all components not required for testing All colleagues are aware of the procedure being undertaken No additional colleagues are working on the module PCL coupling is accessible to release pressure in case of emergency Testing procedure is fully adhered tocy Testing procedure is fully adhered to)
  • R0015336 Pneumatic Output Testing  + (Output testing will require valve operatioOutput testing will require valve operation with no e/s circuit Ensure the following Work area is clear from all components not required for testing All colleagues are aware of the procedure being undertaken No additional colleagues are working on the module PCL coupling is accessible to release pressure in case of emergency Testing procedure is fully adhered toy Testing procedure is fully adhered to)
  • Allocations + issuing received parts  + (Populate the allocate column for each partPopulate the allocate column for each part in accordance to the pick bins that are available. The general rule is to prioritize allocation to the range of Bins of the Build numnber which is next to in line to be Built according to the production schedule. If there is no bin physically available for the Job car number shown it must be zero'd in the allocation quantity column and put into stock normally.antity column and put into stock normally.)
  • Runing MRP  + (Press the Planning Tab > Read demand > ok The demand will then read with a load screen. Once this has finished move on to the next step)
  • Upgrade - Gripper Slider Mechanism  + (Remove all existing parts, including the profile lever, slideway and bearings, and the spring. Install new stronger slideway)
  • Flowline Turret Upgrade - Somatec  + (Remove all parts from the existing turret, to leave just the mounting plate and the cylinder and fittings etc, as shown)
  • R0010309 Ecoline Ultrasonic Material Loaded Upgrade  + (Remove old material load assembly from macRemove old material load assembly from machine. Held on by 2 off M6 socket caps indicated 2 Disconnect switch/sensor. Depending on variant fitted either Unscrew M8 plug connection to disconnect for sensor style Or Disconnect 2 off fork connections onto rear on switch 3 Disconnect bloweronto rear on switch 3 Disconnect blower)
  • Laser Setup on Flowline/ZX3 for Laser Holes  + (The laser sender needs to have a clear patThe laser sender needs to have a clear path to the laser receiver, its really important that this is parallel and the beam does not bounce off the inside of any of the aluminium mounting block. Slacken off the Nuts above and below Laser to move up/down and side/side.below Laser to move up/down and side/side.)
  • TB0301 Autoflow Saw Head Reinforcement - Additional Enhancements  + (The 2 carriage assemblies are as shown. FiThe 2 carriage assemblies are as shown. First, the rails need to be loosely installed onto the horizontal Maytec extrusion, allowing for lateral adjustment. Parts D0010710, D00010711 and B0000046 are to be assembled, as shown. Two of these sub-assemblies are required. Two of these sub-assemblies are required.)
  • R0015338 Bench Assemble Serial Plate  + (The Correct Stamping and information is vital on the machine serial plate. Please double check with supervisor to confirm data before applied to serial plate !)
  • TB0445 ZX5 Setup - Infeed Measure Sensor Calibration  + (The laser should be aligned to ensure the The laser should be aligned to ensure the beam is level up / down and parallel to the backfence. The path should follow the Yellow edge of the lift rollers on the infeed table. Length feedback from the measurement system is visible all the time on the service form.
    # Measure and mark the infeed table at fixed positions from the loading fence at MH end – (3m, 4m, 5m, 6m) # Use a short offcut of profile with a label on the end to act a a fixed reflector at the marked positions – check against the feedback on the screen. # Adjust the lengthMeasureOffset parameter to get the screen measurements to match reality (+/-10mm)
    e screen measurements to match reality (+/-10mm))
  • GE Control Components Changeover  + (The supplier that we use for the supply ofThe supplier that we use for the supply of our control components advised us of the need to changeover. The components that have been made unavailable are all of the GE components. This includes, all MCB's, all contactors (24Vdc, 24Vac, 230Vac), all motor overloads and any auxiliary components to go with these devices. See pictures for reference.these devices. See pictures for reference.)
  • Fitting R0019199 Upgrade: Autoflow Slewing Ring Guard Kit  + (This procedure must be done in conjunction with moving the SR Axis Datum to a position higher and ant the front of the machine to [[Move SR Datum Sensor to Higher Level R0019217]] <br/>)
  • Diagnosing EtherCAT Issues - Advanced  + ( #Choose the device network to interrogate #Choose the device network to interrogate and press the Advanced button #Expand to the Diagnostics-Online View and select the CRC checks 0300-0304 and Link Lost 0310-0312. Click ok to exit #On the online view, the system now records more detail about the CRC errors or link lost problems. In the case in the pictures, FB015B has recorded 69 errors on issue 0310 , which is "Link Lost A/B". There are CRC errors on the output of FB016B and the input of FB015B. This tells me that the link between FB016B and FB015B is not reliable. Could be a loose connection on the etherCAT and / or power cable ection on the etherCAT and / or power cable )
  • R0015251B Bench Assemble X Axis Energy chain  + (1 Assemble 111 links together , ensure all links are orientated the same way . 2 Identify the female end of the assembled links 3 Fit 2 more links of A0001113, but fit in a reversed orientation)
  • R0015286B Bench Assemble X axis Energy Chain  + (Total links of for A0001113 Energy Chain is 95 Double check correct quantity)
  • Setting up NAS Server - MyCloud EX2  + (Use IPScan to find the address)
  • R0015315 Fit Y Axis Drive components  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised <br/>)
  • R0015242 Level and Adjust Roller beds module C and E  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015277 Set Drive pinions in position  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
  • R0015028D ZX5 Hepco Beam Alignment Module C part 2  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts once finalised)
  • R0015352 Mount Buffer Beams  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015071 Bench Assemble Pneumatics Rail  + (Use Loctite 243 on all fasteners Use Loctite 572 on all pneumatic threaded connections Pen mark all fasteners to show finalised)
  • R0015027 Install Pneumatic Connection rail and Air Feeds  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015251 Bench Assemble X Axis components and Energy chain  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015294 Fitment of wire basket and feed pipes  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015119 Mount Assemblies  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts when finalised)
  • R0000738 Pneumatic Installation Part 3  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015344 Bench Assemble Conveyor Parts  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015285 Bench Assemble Pneumatic Rail  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015286 Bench Assemble X axis Components and Energy Chain  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015093 Bench Assemble Transfer Beam  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts when finalised)
  • R0015340 Drill, Assemble and Mount Electrical Cabinet  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015253 Fit Slider units  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
  • R0015346 Conveyor blower system  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015323 Mount Electrical Cabinet  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015091 Mount Outfeed Beam Sensor  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0010260 Bench Assemble Tool Break Sensor  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015345 Conveyor Mounting Brackets  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015314 Fit Z Axis Drive components  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0002916 Install Machine Trunking  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0000738 Pneumatic Installation Part 2  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015114 Bench Assemble Valve Banks and Regulators  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • Autoflow Maintenance - Infeed  + (Use a suitable foam cleaner for cleaning off the glue and tape residue left by the profile rolling along the beds)
  • R0015312 Finalise V Notch Subframe  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015316 V notch Final Assembly Part 2  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
  • R0015101 Bench Assemble Take Up Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)