Recherche par propriété

Cette page fournit une simple interface de navigation pour trouver des entités décrites par une propriété et une valeur nommée. D’autres interfaces de recherche disponibles comprennent la page recherche de propriété, et le constructeur de requêtes ask.

Recherche par propriété

Une liste de toutes les pages qui ont la propriété « Step Content » avec la valeur « <span class="icon-instructions info-icon"> <span class="icon-instructions-icon"><i class="fa fa-info-circle"></i></span> <span class="icon-instructions-text">...This now applies to all installations. The "CNC" standard PCs used for the front end on Flowlines and ZXs have Visual Studio already installed but the TwinCAt version needs to be upgraded from 4022 to 4024</span> </span> #Uninstall all references to Visual Studio 2013 and Beckhoff Twincat3. If this is needed, restart the PC #Copy the install file from g:\Design\TwinCAT3\TC31-Full-Setup.3.1.4024.32.exe to the desktop of the Beckhoff PC #Run the install as Administrator #Delete the setup zip file and unzipped directory to save hard drive space <br/><span class="icon-instructions info-icon"> <span class="icon-instructions-icon"><i class="fa fa-info-circle"></i></span> <span class="icon-instructions-text">..."Specified account already exists" error will happen if the Visual Studio 2013 or Beckhoff TwinCAT is not fully uninstalled and PC restarted. Use Revo uninstaller to completely remove it</span> </span><br/> <span class="icon-instructions idea-icon"> <span class="icon-instructions-icon"><i class="fa fa-lightbulb-o"></i></span> <span class="icon-instructions-text">...From version 3.1.4024 onwards, is is not called visual studio, it is called "TwinCAT XAE Shell"</span> </span> ». Puisqu’il n’y a que quelques résultats, les valeurs proches sont également affichées.

Affichage de 76 résultats à partir du n°1.

Voir (200 précédentes | 200 suivantes) (20 | 50 | 100 | 250 | 500).


    

Liste de résultats

    • Create a TwinCAT Project from Scratch  + (<div class="icon-instructions info-icon
      ...This now applies to all installations. The "CNC" standard PCs used for the front end on Flowlines and ZXs have Visual Studio already installed but the TwinCAt version needs to be upgraded from 4022 to 4024
      #Uninstall all references to Visual Studio 2013 and Beckhoff Twincat3. If this is needed, restart the PC #Copy the install file from g:\Design\TwinCAT3\TC31-Full-Setup.3.1.4024.32.exe to the desktop of the Beckhoff PC #Run the install as Administrator #Delete the setup zip file and unzipped directory to save hard drive space
      ..."Specified account already exists" error will happen if the Visual Studio 2013 or Beckhoff TwinCAT is not fully uninstalled and PC restarted. Use Revo uninstaller to completely remove it

      ...From version 3.1.4024 onwards, is is not called visual studio, it is called "TwinCAT XAE Shell"
      ulb-o"></i></div> <div class="icon-instructions-text">...From version 3.1.4024 onwards, is is not called visual studio, it is called "TwinCAT XAE Shell"</div> </div>)
    • Monday - Putting Customer Machines On Stop  + ( # Open the Machines board # In the “Searc # Open the Machines board # In the “Search / Filter Board” oval box at the top left, Filter by the customer name (just a few letters are needed) # Click on the “Service Contract” column # Type “General” and then select  “General On Stop” or “General On Hold” Repeat for each machine this applies to (some machines may be under warranty) es to (some machines may be under warranty) )
    • PLC Source Control - Git Credential Manager for Windows Install  + ( # Keep the destination folder as the default # Select Components , keep as defaults # Start Menu Folder keep as default # Chose the default editor ,keep as default # Select Use Git from the windows Command Prompt # Use the Window secure Channel Library )
    • PC Recovery Process  + (- Turn off the PC - Plug in recovery USB. - Turn the PC back on - Keep pressing F12 until the boot selection screen shows. <br/>)
    • R0000574 Fit Motor and Swarf Chute  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015146 Pneumatic pipe Installation  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0000558E Bench Assemble Base and Turntable Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015064 Bench Assemble Clamp Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015064 Bench Assemble Clamp Assembly Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015330 Fit 1st stage Ejector and Level Base  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015337 Bench Assemble Guarding Components  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R000560 Bench Assemble Spindle  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015341 Bench Assemble Electrical Cabinet with Pneumatics and controls  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015326 Bench Assemble Roller Backfences  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015334 Fit Centralise Front Table  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0000299 Stroke assembly rebuild Part 2  + (Always use Loctite 243 on all fasteners fitted unless stated different All bearings should be an acceptable fit, with Loctite 641 and FE10 solvent used if required All fasteners should be marked once finalised)
    • Updating Zebra Firmware on ZD620 model  + (Both the zip files for the install of the Zdownloader and the ZPL version file can be located in G:\Builds\Install Files\Zebra Firmware. there is a manual for using the Zdonloader in with the zip file containing the ZPL version file .)
    • R0015327 Level Frame and quality Check  + (Clean all threads in frame using standard taps)
    • Autoflow PC Cleanup  + (Click the checkbox)
    • ZX5 Production R0015040 Module F to R0015001B Module E alignment  + (Position module F at end of Module E infeed frame Approximately Align Saw roller back fences to Saw infeed back fences Approximately align X axis position by setting the to frames spaced at the distance shown of 20mm)
    • Batch Printing Part Drawings  + (Double click on the P.O the drawings are required to be batch printed for.)
    • AX8000 Drives - ES Contactor Wiring  + (Find a spare section of DIN rail that the contactor can be placed in. The contactor clips onto the din rail without the need for fixings.)
    • Stuertz Welder - Setting Barcode Reader  + (If this is a Zebra scanner, the Zebra CDC scanner program will be installed already. For other manufacturers, this may need to be downloaded from the internet <br/>)
    • Setting Motor Overload Relays  + (In order to read the motor plate we need tIn order to read the motor plate we need to know 3 pieces of information *Whether the motor is wired in star or delta *The frequency at which the motor is running *The voltage at which the motor is running Whether the motor is wired in star or delta depends on the application. Refer to the electrical diagrams to find out which it is. For example, the saw blade motor is wired in star, whereas most extractor motors are wired in delta. The UK standard for a three phase electrical supply is 415v at 50Hz. Unless the supply to a motor runs through an inverter (i.e the spindles) this is also the standard for our machines. Using the picture on the right as an example, we know the motor will be running at 50Hz (1) so we can disregard the information on the right of the plate as this provides figures for a 60Hz supply. Looking at the box numbered (2) we can work out that this motor would be wired in delta if it were running on a single phase 230v supply. However, we know that this is a three phase supply and will be wired in star. So when we move on to the box numbered (3) we will be looking at the number on the right hand side of the slash. Therefore, this particular motor would need an Overload Relay set to 3.00A.would need an Overload Relay set to 3.00A.)
    • R0015257 Module C Pneumatic Tests  + (In this process pneumatic outputs will be In this process pneumatic outputs will be tested in a non emergency stop environment Ensure safe working practice is followed
      * Ensure Machine test area is clear from personnel and all staff are aware of testing procedure commencing * Ensure all Air connection lines are connected * Ensure all walkways are not impeded by trailing pipes/leads * Ensure all mechanical assemblies are at a sufficient stage for testing
      assemblies are at a sufficient stage for testing)
    • R0015280 Module E Pneumatic Tests  + (In this process pneumatic outputs will be In this process pneumatic outputs will be tested in a non emergency stop environment Ensure safe working practice is followed * Ensure Machine test area is clear from personnel and all staff are aware of testing procedure commencing * Ensure all Air connection lines are connected * Ensure all walkways are not impeded by trailing pipes/leads * Ensure all mechanical assemblies are at a sufficient stage for testinglies are at a sufficient stage for testing)
    • PC Bios Power settings  + (Keep pressing the “DELETE “button on the kKeep pressing the “DELETE “button on the keyboard until the PC goes into the BIOS mode and you see a screen similar to the ones shown below. If the BIOS screen does not show wait for the PC to LOGIN into windows and then shut-down or restart the PC again and retry using the delete button as described above. The Menu Will look something similar to thise Menu Will look something similar to this)
    • Updating Baldor ESB Firmware 2022  + (Located in the dropbox folder D:\Dropbox (Stuga Machinery Ltd)\service\3rd Party Manuals\Servos\Baldor)
    • Install markings and measurements ZX5  + (Measure and mark up the distance between tMeasure and mark up the distance between two points (one on each) of the two modules. Mark up the points in a place where it is easy to read the markings and simply practical to get the two modules in a similar position (gap between the two) on installation - preferably on the front and the back of the modules. This makes it easier and closer to adjusting the loadpos and datum on the x-axis once setting up accuracy.um on the x-axis once setting up accuracy.)
    • Setting up TwinCAT Drive Manager for AX8000 Drives  + (Measurement-> TwinCAT Drive Manager 2 Project)
    • Stuertz Infeed - Align and dowel GX rack  + (Using the T0001090 alignment tool, check each 1m section of the rack is aligned to its neighbour <br/>)
    • Booking in  + (Once this is entered press the 'Tab' on the keyboard)
    • R0015336 Pneumatic Output Testing  + (Output testing will require valve operatioOutput testing will require valve operation with no e/s circuit Ensure the following Work area is clear from all components not required for testing All colleagues are aware of the procedure being undertaken No additional colleagues are working on the module PCL coupling is accessible to release pressure in case of emergency Testing procedure is fully adhered toy Testing procedure is fully adhered to)
    • ACEpc Installing netedit with NetSetGo disk  + (Switching on with the floppy disk in will boot from the floppy drive instead of the hard drive)
    • TB0436 Creating a Backup Through WinMulti  + (Press on the “Backup” button on WinMulti)
    • Programming Eaton DE Drive  + (Set these references P-20 to P-23 to 50Hz so it will not matter what input 3 or 4 is set to - it will always be 50Hz)
    • Upgrade - Gripper Slider Mechanism  + (Remove all existing parts, including the profile lever, slideway and bearings, and the spring. Install new stronger slideway)
    • R0010309 Ecoline Ultrasonic Material Loaded Upgrade  + (Remove old material load assembly from macRemove old material load assembly from machine. Held on by 2 off M6 socket caps indicated 2 Disconnect switch/sensor. Depending on variant fitted either Unscrew M8 plug connection to disconnect for sensor style Or Disconnect 2 off fork connections onto rear on switch 3 Disconnect bloweronto rear on switch 3 Disconnect blower)
    • TB0301 Autoflow Saw Head Reinforcement - Additional Enhancements  + (The 2 carriage assemblies are as shown. FiThe 2 carriage assemblies are as shown. First, the rails need to be loosely installed onto the horizontal Maytec extrusion, allowing for lateral adjustment. Parts D0010710, D00010711 and B0000046 are to be assembled, as shown. Two of these sub-assemblies are required. Two of these sub-assemblies are required.)
    • R0015338 Bench Assemble Serial Plate  + (The Correct Stamping and information is vital on the machine serial plate. Please double check with supervisor to confirm data before applied to serial plate !)
    • TB0445 ZX5 Setup - Infeed Measure Sensor Calibration  + (The laser should be aligned to ensure the The laser should be aligned to ensure the beam is level up / down and parallel to the backfence. The path should follow the Yellow edge of the lift rollers on the infeed table. Length feedback from the measurement system is visible all the time on the service form.
      # Measure and mark the infeed table at fixed positions from the loading fence at MH end – (3m, 4m, 5m, 6m) # Use a short offcut of profile with a label on the end to act a a fixed reflector at the marked positions – check against the feedback on the screen. # Adjust the lengthMeasureOffset parameter to get the screen measurements to match reality (+/-10mm)
      e screen measurements to match reality (+/-10mm))
    • ZX3 Counterweight Installation  + (Fit all 3 weight plates, and secure with the provided bolts and washers)
    • Hotswap Beckhoff PLC with Licence Slice Installed  + (There are a row of retaining clips on bot the top and bottom of the PC that hold it to the Din rail. Pop them open with a flathead screwdriver)
    • WinDelay for Twincat Startup  + (This can be downloaded from Dropbox (Stuga Machinery Ltd)\Service\WinStartDelay\winstartdelay.zip)
    • Fitting R0019199 Upgrade: Autoflow Slewing Ring Guard Kit  + (This procedure must be done in conjunction with moving the SR Axis Datum to a position higher and ant the front of the machine to [[Move SR Datum Sensor to Higher Level R0019217]] <br/>)
    • Accessing Machine Location from a job  + (This will depend on what is installed on your phone You should be able to open it into any map application and use satvav facilities)
    • Setting up NAS Server - MyCloud EX2  + (Use IPScan to find the address)
    • R0015285 Bench Assemble Pneumatic Rail  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
    • R0000738 Pneumatic Installation Part 2  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015093 Bench Assemble Transfer Beam  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts when finalised)
    • R0015119 Mount Assemblies  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts when finalised)
    • R0015314 Fit Z Axis Drive components  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015114 Bench Assemble Valve Banks and Regulators  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015352 Mount Buffer Beams  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0002916 Install Machine Trunking  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015277 Set Drive pinions in position  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
    • R0015348 Fit Flexible Ducting  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015294 Fitment of wire basket and feed pipes  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015253 Fit Slider units  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
    • R0015346 Conveyor blower system  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015091 Mount Outfeed Beam Sensor  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015071 Bench Assemble Pneumatics Rail  + (Use Loctite 243 on all fasteners Use Loctite 572 on all pneumatic threaded connections Pen mark all fasteners to show finalised)
    • R0015101 Bench Assemble Take Up Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015311 Install and Align Datum rollers  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015319 Fit Guards and Doors  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015312 Finalise V Notch Subframe  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015316 V notch Final Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015317 Install Rotary Ring  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015263 Mount drive motor for load shaft  + (Apply adhesive and lock off all grubscrews in spherical bearings in all positions (9 off bearings ))
    • R0015357 Fit Guards  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
    • R0015266B mount completed assemblies  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
    • R0015030B Bench assemble loader wheel  + (Attach cylinder mount block D0010238 to assembly with 4 off M6 x 20 socket caps)
    • R0015271 Mount buffer bars  + (Check D0015464B Infeed Rear Endfence has been drilled for m6 countersinks If not rework and note rework time)
    • ACEpc Network Software - IP  + (Volume label [enter] This will format the hard drive and then copy all necessary network software as a ZIP file to the hard drive and then inflate it.)
    • VM Upgrade Hardware  + (With the machine turned off , find the FE PC and remove it as much as you need to gain access to the top cover. If you are upgrading the memory try and remove the PC to a flat surface.)
    • TB0431 Samsung Drive Parameter Setup  + (Using a stripped plug and making sure therUsing a stripped plug and making sure there is no power going through the plug during installation: # '''Live wire''' (Brown) in the top port # '''Neutral wire''' (Blue) in the second port # '''Ground wire''' (Green + Yellow) in the bottom port # The '''Joggers''' Serial port # Plug in and '''turn on''' plugial port # Plug in and '''turn on''' plug)