Step by step guide of how to carry out the 400mm to 500mm saw blade upgrade including long reach clamps.
Time to complete is very dependant on condition of the machine, ie rusted or rounded off bolts which may need to be drilled out and holes re-tapped.
Replace all screws with Loctite except grub screws on taper lock pulleys, grub screws for shafts on clamp pads and slit strip retaining screws or where a locking nut is used on cylinder rods. +
The ACEpcs use two different systems for connecting a network
#NETBeui - this was used on earlier machines but reliability depends on the customer network setup. Reconfiguration after initial setup is difficult
#IP addressing - A setup system was written using IP addresses to connect. This is a little harder to set up, but is easier to change later. A special program called netedit was written which updates all the correct files in the background +
This procedure will completely overwrite any data on the hard drive of the ACEpc.
This is not a problem on a flowline where the data resides on the main MH hard drive in a shared directory c:\saw.
If this process is to be carried out on a standalone saw or router, make sure the data is backed up first.
<br/> +
The winMulti software stores the production data in a SQLite database. This tutorial describes how this data can be accessed for further analysis with tools such as Excel and Access +
This dokit is to help with the use of a wire line to set alignment correctly on mechanical build up. Using a wire line correctly will ensure a very accurate straight line is achieved . Accuracy of + - 1 mm over any distance can be achieved using the following method. Using one incorrectly can also easily be done.!
The steps shown can be applied to all types of alignment , when you have a vertical face on components that require aligning. +
This involves splitting down received orders into the JC/Pick bins the parts have been allocated to by Sage.
If there are parts to be allocated, after filling in the 'this delivery' column and pressing save, if there are parts to be allocated a list will appear.
this list is in order of part number and in the sub-screen after highlighting each part number the specific Job card numbers will show quantities required for each bin and also the quantity to be allocated from the order received. +
There a many terminal and irretrievable problems that can occur when modifying a TwinCAT project on Visual Studio.
However, there is no issue that cannot be resolved, if the Visual Studio solution is '''<u>archived</u>'''.
This archive contains all data relevant to a project so you can start from scratch
<br/> +
Mk11 Gripper was designed to give a variable stop height position for the Mk10 gripper assembly. This is needed on systems with multiple chambers, where there is no "sweet spot" for the open grip position to suit all chambers. A Somatec turret stop is used to provide different stop heights
The design details are here [https://stugaltd.monday.com/boards/315478853/pulses/640717084 Design Notes]
<br/> +
Let's say a small piece has become wedged between the eject table and the outfeed table frame.
<div class="icon-instructions caution-icon">
<div class="icon-instructions-icon"><i class="fa fa-exclamation-triangle"></i></div>
<div class="icon-instructions-text">...Do not try to reach into the machine until it is safe to do so - Press ESTOP</div>
</div><br/> +
This checklist needs to be carried out at regular intervals, in conjunction with the daily maintenance.
<table class=""wikitable"Maintenance">
<tr>
<th>Use Profile
</th><th>Regularity
</th></tr><tr>
<td>2-3 Shifts per day
</td><td>Weekly
</td></tr><tr>
<td>Single Shift Full Time
</td><td>Bi-Weekly
</td></tr><tr>
<td>Up to 50% utilisation
</td><td>Monthly
</td></tr></table> +
<nowiki>The following preventative maintenance tasks should be carried out regularly on the machine. The frequency depends on the machine use, but as a guide:<br /><br/><div class="mw-highlight mw-content-ltr" dir="ltr"><pre>2-3 Shifts Weekly<br />40 Hrs/Week Bi-Weekly<br />20 Hrs/Week Monthly</pre></div></nowiki> +
<nowiki>The following preventative maintenance tasks should be carried out regularly on the machine. The frequency depends on the machine use, but as a guide:<br /><br/><div class="mw-highlight mw-content-ltr" dir="ltr"><pre>2-3 Shifts Weekly<br />40 Hrs/Week Bi-Weekly<br />20 Hrs/Week Monthly</pre></div><br/></nowiki> +