Recherche par propriété

Cette page fournit une simple interface de navigation pour trouver des entités décrites par une propriété et une valeur nommée. D’autres interfaces de recherche disponibles comprennent la page recherche de propriété, et le constructeur de requêtes ask.

Recherche par propriété

Une liste de toutes les pages qui ont la propriété « Step Content » avec la valeur « '''<u>PICTURES REQUIRED OF THESE STEPS PLEASE</u>''' Height position between tables now needs to be checked and set if required 1 Use 1 meter straight edge across both tables as shown, use feeler gauges to identify height difference between tables 2 Add full face shim to table identified as low, ensuring original shims are kept in place 3 Recheck levels once shim is added 4 Use straight edge and feeler gauges to check flatness . Eject table may be adjusted slightly (-+ 1 level spanision) to aid alignment 5 Check transition between tables is smooth, using the engineers level to gauge ». Puisqu’il n’y a que quelques résultats, les valeurs proches sont également affichées.

Affichage de 58 résultats à partir du n°1.

Voir (200 précédentes | 200 suivantes) (20 | 50 | 100 | 250 | 500).


    

Liste de résultats

    • R0000571 Fit and Level Cut Tables , Finalise Eject  + ('''<u>PICTURES REQUIRED OF THESE STE'''PICTURES REQUIRED OF THESE STEPS PLEASE''' Height position between tables now needs to be checked and set if required 1 Use 1 meter straight edge across both tables as shown, use feeler gauges to identify height difference between tables 2 Add full face shim to table identified as low, ensuring original shims are kept in place 3 Recheck levels once shim is added 4 Use straight edge and feeler gauges to check flatness . Eject table may be adjusted slightly (-+ 1 level division) to aid alignment 5 Check transition between tables is smooth, using the engineers level to gaugen tables is smooth, using the engineers level to gauge)
    • ZX5 Installation Procedure  + (No hard pipe under the Saw.)
    • ZX5 Alignment Check  + ( * Check backfence roller alignment to infeed * Check roller heights to infeed and outfeed )
    • Autoflow Maintenance - Outfeed Table  + ( * Clean Stainless Steel Bed of swarf and * Clean Stainless Steel Bed of swarf and remove any tape that may have transferred onto the bed during normal operation * Lightly oil shaft on underside of bed, lightly oil cylinder rods * Lghtly oil Hepco rail, 1 -2 pumps of grease into Linear Bearings * Use a suitable foam cleaner for cleaning off the glue and tape residue left by the profile rolling along the beds * Check Hepco rail, Linear Bearings, Shafts and cylinders for damage or wear gs, Shafts and cylinders for damage or wear )
    • Autoflow Maintenance - Machining Centre  + (Check level of grease in Auto lube Part replacement order code is M0001047)
    • Ecoline Site Installation Guide  + (This is what the taper on the roller approach is for - to raise the profile onto the rollers)
    • R0015329 Fit Head Spindle Posts  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015330 Fit 1st stage Ejector and Level Base  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015334 Fit Centralise Front Table  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015100 Fit Guarding  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015064 Bench Assemble Clamp Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015259 Mount roller beds to mainframe  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0000571 Fit and Level Cut Tables , Finalise Eject  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015029D Hepco Beam Alignment  + (Always Use Loctite 243 on all fasteners Always use Loctite 570 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
    • ZX5 Production R0000548E Module G to R0015040 Module F alignment  + ( # X axis of module is levelled from the t # X axis of module is levelled from the two indicated points . Use a 2 meter straight edge between these points and an engineers level on top # y axis is levelled from these two indicated points . an engineers level rested on this face is sufficient for levelling ed on this face is sufficient for levelling )
    • ZX5 Production R0015139 Module B to R0015000B Module C alignment  + (Before installing module B, module C rolleBefore installing module B, module C roller tables should be double checked for correct positioning 1 To do this inspect tables 1, 2,3 and 4 for level as shown. 2 Also inspect alignment with 2 meter straight edge. All rollers should be on the same height and no bump up should be present when moving the straight edge over the table. 3 Ensure fixed table is at same height as rollers Report any discrepancies to supervisor for correct remedial action to supervisor for correct remedial action)
    • ZX5 Installation Procedure 2023 Part 2  + (Check X axis alignment of horiczontal and Check X axis alignment of horiczontal and vertical rollers using 2 meter straight edge and feeler gauges Any discrepancy must be reported and rectified if present Tolerance 0.002" / 0.05mm [https://stugaltd.monday.com/boards/3628350043/pulses/4665028475][[R0015311 Install and Align Datum rollers]]
      [[R0015311 Install and Align Datum rollers]] <br/>)
    • R0015327 Level Frame and quality Check  + (Clean all threads in frame using standard taps)
    • ZX5 Production R0015040 Module F to R0015001B Module E alignment  + (Position module F at end of Module E infeed frame Approximately Align Saw roller back fences to Saw infeed back fences Approximately align X axis position by setting the to frames spaced at the distance shown of 20mm)
    • PLC Source Control - Working with GIT and TcXaeShell  + ( #Select '''Push''' #Message appears showing the successful push to the '''Origin''' which is in the remote cloud Repo )
    • R0015284 Frame ancillaries  + (Fit 5 off basket support bracket to pre drilled holes at indicated points . Secure using M8 x 20 socket caps and Large M8 washers)
    • R0015244 Frame ancillaries Fitting  + (Fit 5 off basket support bracket to pre drilled holes at indicated points . Secure using M8 x 20 socket caps and Large M8 washers)
    • Saw machining centre alignment and level check points  + (Ensure all faces being checked are clean and free from dust and swarf . Accuracy of level reading is vital in this operation)
    • R0000164 Spindle Build  + (Ensure all parts supplied are visually cheEnsure all parts supplied are visually checked for damage such as burs or surface contamination Report any issues to supervisor D0006016 may be issued with surface rust . This should be cleaned with green scotchbrite pads as shown in photos to remove contaminationas shown in photos to remove contamination)
    • ZX5 Transfer Table Setup  + (The rollers on top are mounted on eccentriThe rollers on top are mounted on eccentric bushes. We only need these just tight enough to not allow any slop or vertical play. Slacken the cams off completelely, you will need an 8mm spanner with the faces ground down to fit in the space. Slide the plate onto the rail and tighten the eccentric bushes until any vertical play is removed. Lightly try to move the assembly on the X axis, if there is any slop then it needs to be a little tighter but probably no more than an 1/8th of a turn. Once set you should still be able to spin the rollers by hand, but still feel a fair bit of resistance. Once set slide the assembly over the full length of the V rails to check fo any tight spots. If there are then you need to check that the two halves of the fail are fully mated!!! two halves of the fail are fully mated!!!)
    • ZX5 Installation Procedure 2023  + (Identify if either saw infeed or multi head outfeed is the logical frame to place first . Consider access to machine when installing 1st frame Consider handing of machine)
    • Flowline 6 to 6o5m Extension  + (Clean and remove any dirt/grease/imperfections on the box section ready the the new rails. If any of the tapped holes are compromised, re-tap 6mm.)
    • Stuertz VSM 30.20-P Welder Installation  + (Lift uprights into positions and fix with 3 x bolts each side on each upright. Fit 2 x cap heads on each rail each side)
    • ZX5 - ZX3 Hepco alignment Module E Saw Infeed  + (Locations of jigs required mounting method)
    • ZX5 Production R0015122 Module A to R0015139 Module B alignment  + (Position module A in front of module B Use Infeed back fence to Multi head datum rollers as initial alignment guide for Y axis Set gap of 23mm -+ 2mm between module A roller frame and module B roller block)
    • R0015243 ZX5 module A-C-E Frame levelling  + (Tap all holes to remove debris from coatinTap all holes to remove debris from coating process Ensure all holes cleaned after tapping with compressed air
      ...Ensure eye protection is worn when using compressed air

      ext">...Ensure eye protection is worn when using compressed air</div> </div><br/>)
    • R0015338 Bench Assemble Serial Plate  + (The Correct Stamping and information is vital on the machine serial plate. Please double check with supervisor to confirm data before applied to serial plate !)
    • Saje uPVC Unloading Process  + (Including the chop saw table Leaving a clear route for the 2.4m x 7.5m table to roll in)
    • TB0445 ZX5 Setup - Infeed Measure Sensor Calibration  + (The laser should be aligned to ensure the The laser should be aligned to ensure the beam is level up / down and parallel to the backfence. The path should follow the Yellow edge of the lift rollers on the infeed table. Length feedback from the measurement system is visible all the time on the service form.
      # Measure and mark the infeed table at fixed positions from the loading fence at MH end – (3m, 4m, 5m, 6m) # Use a short offcut of profile with a label on the end to act a a fixed reflector at the marked positions – check against the feedback on the screen. # Adjust the lengthMeasureOffset parameter to get the screen measurements to match reality (+/-10mm)
      e screen measurements to match reality (+/-10mm))
    • R0015278 Mount Completed Assemblies  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
    • Fitting R0019199 Upgrade: Autoflow Slewing Ring Guard Kit  + (This procedure must be done in conjunction with moving the SR Axis Datum to a position higher and ant the front of the machine to [[Move SR Datum Sensor to Higher Level R0019217]] <br/>)
    • Units of Measure modification CIM50  + (To make the item status of a product inactTo make the item status of a product inactive it needs to comply with all of the following conditions : Item has 0 in stock Item has 0 in quarantine Item does not exist on any live sales orders Item does not exist on any live purchase orders Item does not exist on any live works orders Item does not exist on a bill of material
      Please make a note of changes that are made stock levels allocations P.Os Works orders or BOM lists are amended to make an item inactive as these will have to all be re-entered after the unit of measure has been amended and saved.

      e re-entered after the unit of measure has been amended and saved.</div> </div><br/>)
    • R0015352 Mount Buffer Beams  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015028D ZX5 Hepco Beam Alignment Module C  + (Ensure additional spacer is removed from jigs when using for alignment on module C)
    • R0015028D ZX5 Hepco Beam Alignment Module C part 2  + (Use Loctite 243 on all fasteners Use Loctite 570 on all threaded pneumatic connections Pen mark all bolts once finalised)
    • R0015314 Fit Z Axis Drive components  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015242 Level and Adjust Roller beds module C and E  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015291 Install Transfer Beams To Module C and E  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • J0001000H Autoflow Mk4 Mechanical installation-Alignment  + (Use footprint drawing to determine machine location for installation)
    • R0015310 Install V Notch Subframe  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015312 Finalise V Notch Subframe  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015245 Module C support arm alignment  + (1 Move channel 2 section up or down to co1 Move channel 2 section up or down to copy height of adjacent channel 3. Use the tabs as the reference points 2 Use 2 meter straight edge and level between points indicated Move channel 2 at the end indicated, to give a level reading 3 Tighten bolts to hold in place
      3 Tighten bolts to hold in place <br/>)
    • R0015316 V notch Final Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015273 Module E support arm alignment  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015311 Install and Align Datum rollers  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015313 Material Clamp Alignment  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015079 Infeed extension assembly  + (1 Fit levelling jig to frame extension section as shown 2 Use engineers level to adjust the level with the floor jacking bolts to set the jig level)
    • R0015269 Fit Frame ancillaries  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
    • R0015078B Module A infeed arm alignment  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
    • R0015255 Mount Assemblies to Main Frame  + (Using the first point used to set the bracUsing the first point used to set the brackets , measure the gap indicated and replicate this measurement on the other 4 points . This is adjusted by moving the indicated bracket up or down .
      ...If enough adjustment isnt available on remaining positions, first position can be moved up and new measurement taken
      sitions, first position can be moved up and new measurement taken</div> </div>)
    • R0002913E Install and Align Rotary head Subframe  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
    • Omron E5CVS PV Shift  + (H0 = No offset. Temp at Plate =230 degrees - Display on E5CSV = 240 Degrees L10 = - 10 degree. Temp at plate = 230 degrees - Display E5CSV = 230 Degrees H10 = +10 degree . Temp at plate = 230 degrees - Display E5CSV = 250 Degrees)
    • Convert TC2 Project to TC3  + ( #Open Visual Studio #Create a new TC3 pro #Open Visual Studio #Create a new TC3 project called [BuildNo] in c:\TwinCAT\Stuga\ #Make sure "Create Directory..." is Unticked #Right Click on the project name and select ‘Load Project from TwinCAT 2.11 Version…’ #Click Cancel on the two windows asking to convert the PLC project #Ignore or cancel any warnings about libraries (this part will be replaced later)
      ...Once created, you will have a copy of all the devices and boxes in the project with the correct naming.

      f all the devices and boxes in the project with the correct naming.</div> </div><br/> )