Étape 1 - Lift uprights into position

Lift uprights into positions and fix with 3 x bolts each side on each upright. Fit 2 x cap heads on each rail each side


Étape 2 - Run in belts and chain

Run belts and chains through onto pulleys, tensioner may need to be slackened off to fit the brackets through.

Lift the top head to be able to lower the chain and belt brackets at the rear of the uprights.

Fix brackets to upright.

Always fix chain bracket first. then belt bracket.

Always use fully threaded bolts without a shoulder

Étape 3 - Tension chain and belts

Tension using the threaded bars nuts at the top of the uprights. Ensure pulley are level.



Étape 4 - Fit light curtain arms

Fix in place with 2 x cap head bolts. Cabinet side connect cable to light curtain and clip to arm. Adjust the feet to level the arms.

Étape 5 - Fit guarding

Étape 6 - Connect console

Connect console and network cable.

Also fit keyboard tray and adjust using the fixing bolts each side.


Étape 7 - Connect power and air

Étape 8 - Align safety light curtain

Étape 9 - Fit Beacon

Use M5 bolts and nuts to fit the beacon to the top of the cabinet



Étape 10 - Lift bottom heads and remove transportation stop bolts

Once the machine is powered on and ready to move use the referencing process to move the bottom heads away from the stop bolts in the rear of the uprights and then remove them (1 on each upright)