Une liste de toutes les pages qui ont la propriété « Step Content » avec la valeur « 1 Fit 2 off P0001198 Fitting: Speed controller 1/8" x 6mm Elbow to P0001045 Guide cylinder 25 x 150 using indicated ports 2 Attach Side clamp bar as shown using 4 off M6 x 25 socket caps 3 Attach cylinder to D0015241 Outfeed Side Clamp Mounting Block using 2 off M5 x 50 socket caps <br/><span class="icon-instructions caution-icon"> <span class="icon-instructions-icon"><i class="fa fa-exclamation-triangle"></i></span> <span class="icon-instructions-text">...Check for Rework . Ecr raised to increase depth of M5 tapped holes indicated.Should be 20mm deep. Rework if not to sufficient depth for listed fixings</span> </span><br/> ». Puisqu’il n’y a que quelques résultats, les valeurs proches sont également affichées.

Affichage de 48 résultats à partir du n°1.

Voir (200 précédentes | 200 suivantes) (20 | 50 | 100 | 250 | 500).


    

Liste de résultats

    • R0015298 Bench Assemble V notch Clamps  + (1 Fit 2 off P0001198 Fitting: Speed contro1 Fit 2 off P0001198 Fitting: Speed controller 1/8" x 6mm Elbow to P0001045 Guide cylinder 25 x 150 using indicated ports 2 Attach Side clamp bar as shown using 4 off M6 x 25 socket caps 3 Attach cylinder to D0015241 Outfeed Side Clamp Mounting Block using 2 off M5 x 50 socket caps
      ...Check for Rework . Ecr raised to increase depth of M5 tapped holes indicated.Should be 20mm deep. Rework if not to sufficient depth for listed fixings

      e 20mm deep. Rework if not to sufficient depth for listed fixings</div> </div><br/>)
    • Setting Up Email Production Reports  + (Navigate to Settings->Parameters)
    • Installing VNC Server and Viewer  + (<nowiki>From the piggy back PC, connFrom the piggy back PC, connect to
      \\Bnnn\
      or
      \\Bnnn\saw
      [Where Bnnn is the build number - eg M012, F002 etc]
      on the older PC.

      If using the build number does not work, you may need to use IP addresses
      \\192.168.1.54\saw
      (Look up the IP address using ipconfig from the command prompt, or network settings)

      sing ipconfig from the command prompt, or network settings)</pre></div><br/></nowiki>)
    • R0000558E Bench Assemble Base and Turntable  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015066 Bench Assemble Saw Motor Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015146 Pneumatic pipe Installation Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015064 Bench Assemble Clamp Assembly  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015328 Install Base and Turntable  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015146 Pneumatic pipe Installation Part 3  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R000560 Bench Assemble Spindle  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0000558E Bench Assemble Base and Turntable Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0000571 Fit and Level Cut Tables , Finalise Eject  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015335 Mount Electrical Cabinet  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015326 Bench Assemble Roller Backfences  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015064 Bench Assemble Clamp Assembly Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015330 Fit 1st stage Ejector and Level Base  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • R0015037 Bench Assemble SY Assembly Part 2  + (All bolts to have Loctite 243 adhesive applied unless otherwise stated All Threaded Pneumatic connections to have Loctite 570 applied All bolts to be pen marked once adhesive applied and correct tension added)
    • ZX5 Installation Procedure 2023 Pneumatic connections  + (All control pneumatic connections will be All control pneumatic connections will be identified with identification numbers All permanently fed supply lines will be identified by the use of Red pneumatic pipe All Emergency stop switched air feeds will be identified by the use of Blue pneumatic pipeentified by the use of Blue pneumatic pipe)
    • ZX5 Production R0000548E Module G to R0015040 Module F alignment  + ( # X axis of module is levelled from the t # X axis of module is levelled from the two indicated points . Use a 2 meter straight edge between these points and an engineers level on top # y axis is levelled from these two indicated points . an engineers level rested on this face is sufficient for levelling ed on this face is sufficient for levelling )
    • R0015295 Finalise wiring loom for Rotary head  + (Cables must be adjusted between each spindCables must be adjusted between each spindle to ensure the cable lengths are correct . 1 Start at cable point between 6 and 5 . Start with the light green ethercat cable with the right angle plug. Adjust so that 200mm is past the end of the spindle plate . See picture for detail. 2 Move to the next spindle connection between 5 and 4 and adjust the new right angled ethercat cable to match the length of the previous adjusted cable 3 Repeat this process working your way around the spindles to set all ethercat cablesnd the spindles to set all ethercat cables)
    • R0015284 Frame ancillaries  + (Fit 5 off basket support bracket to pre drilled holes at indicated points . Secure using M8 x 20 socket caps and Large M8 washers)
    • TB0390 Fitting SR Datum Sensor  + (Fit U Bolt and Sensor Bar to Table Post on infeed side of saw. See Image for height)
    • ZX5 MH Infeed Basic IO Test and Setup  + (Make sure the reset of the Estop circuit wMake sure the reset of the Estop circuit works. Be aware when resetting this will reset the air to home all pneumatics. Test each emergency stop button individually (Button box, infeed rear middle and end) making sure this breaks the circuit when pressed and the air is dumped. The Infeed beam sensor should be tested, when broken should also break the circuit and dump the air. Check on Service menu - IO tab that each input works correctly for each Estop unit.input works correctly for each Estop unit.)
    • C0001005MM Micromech Stepper Motor Assembly  + (Mark the motor face as the picture to giveMark the motor face as the picture to give the correct mounting position A 3mm hole must be drilled in this position at a depth of 5mm . Caution, damage can be caused to motor if this depth is not adhered to. Increase drill sizes incrementally when drilling, to ensure a good sized 3mm hole Use masking tape to stop swarf entering the stepper motor housing Use a drop of Loctite 270 to ensure dowel remains in place when fitted ensure dowel remains in place when fitted)
    • R0015256 Pneumatic Connections  + (6mm black air pipe Pipe identified as 126mm black air pipe Pipe identified as 1259 9 off pop up C cylinders to be connected (1) Ensure enough slack is left on pipe between basket and cylinder to allow full range of movement
      *(1) 6mm tee feeds cylinder above and to the left *(2) 6mm tee feeds cylinder above and ring main left and right *(3) 6mm tee feeds cylinder above and ring main left and right *(4) 6mm tee feeds cylinder above and ring main left and right *(5) 6mm tee feeds valve below and ring main left and right *(6) 6mm tee feeds cylinder above and ring main left and right *(7) 6mm tee feeds cylinder above and ring main left and right *(8) 6mm tee feeds cylinder above and cylinder to the right
      e feeds cylinder above and cylinder to the right)
    • R0015320 Pneumatic Output Test  + (Output testing will be carried out under a no-emergency stop situation ensure pcl coupling is used for ability for quick disconnection Ensure all colleagues are aware of testing and ensure good working practise is followed)
    • R0015336 Pneumatic Output Testing Part 2  + (Output testing will require valve operatioOutput testing will require valve operation with no e/s circuit Ensure the following Work area is clear from all components not required for testing All colleagues are aware of the procedure being undertaken No additional colleagues are working on the module PCL coupling is accessible to release pressure in case of emergency Testing procedure is fully adhered tocy Testing procedure is fully adhered to)
    • Flowline Turret Upgrade - Somatec  + (Remove all parts from the existing turret, to leave just the mounting plate and the cylinder and fittings etc, as shown)
    • R0010309 Ecoline Ultrasonic Material Loaded Upgrade  + (Remove old material load assembly from macRemove old material load assembly from machine. Held on by 2 off M6 socket caps indicated 2 Disconnect switch/sensor. Depending on variant fitted either Unscrew M8 plug connection to disconnect for sensor style Or Disconnect 2 off fork connections onto rear on switch 3 Disconnect bloweronto rear on switch 3 Disconnect blower)
    • Laser Setup on Flowline/ZX3 for Laser Holes  + (The laser sender needs to have a clear patThe laser sender needs to have a clear path to the laser receiver, its really important that this is parallel and the beam does not bounce off the inside of any of the aluminium mounting block. Slacken off the Nuts above and below Laser to move up/down and side/side.below Laser to move up/down and side/side.)
    • GE Control Components Changeover  + (The supplier that we use for the supply ofThe supplier that we use for the supply of our control components advised us of the need to changeover. The components that have been made unavailable are all of the GE components. This includes, all MCB's, all contactors (24Vdc, 24Vac, 230Vac), all motor overloads and any auxiliary components to go with these devices. See pictures for reference.these devices. See pictures for reference.)
    • R0015071 Bench Assemble Pneumatics Rail  + (Use Loctite 243 on all fasteners Use Loctite 572 on all pneumatic threaded connections Pen mark all fasteners to show finalised)
    • R0015345 Conveyor Mounting Brackets  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0000738 Pneumatic Installation Part 2  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015250 Bench Assemble Support Arms  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
    • R0015314 Fit Z Axis Drive components  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015095 Bench Assemble Infeed Support Arms  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
    • R0010260 Bench Assemble Tool Break Sensor  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015289 Bench Assemble Pipe Connection Rail  + (Use Loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0000572 Bench Assemble Centralise Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015321 Bench Assemble Guards and Doors  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015316 V notch Final Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015101 Bench Assemble Take Up Assembly  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)
    • R0015274 Fit X Axis Gearbox and Motor  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
    • R0015247 Fit X axis gearbox and Motor  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all fasteners to show finalised)
    • R0015030B Bench assemble loader wheel  + (Attach cylinder mount block D0010238 to assembly with 4 off M6 x 20 socket caps)
    • R0015265 Mount Infeed arm covers and End guards  + (Use loctite 243 on all fasteners Use Loctite 572 on all threaded pneumatic connections Pen mark all bolts to show finalised)
    • Omron E5CVS PV Shift  + (H0 = No offset. Temp at Plate =230 degrees - Display on E5CSV = 240 Degrees L10 = - 10 degree. Temp at plate = 230 degrees - Display E5CSV = 230 Degrees H10 = +10 degree . Temp at plate = 230 degrees - Display E5CSV = 250 Degrees)