It is important that the parallelism of the GY axis to the backfence is set and maintained along the length of the rack. This tutorial describes how to check this parallelism without the need for measuring equipment
'''General Procedure'''
#Find range of adjustment required
#Zero GY axis to ensure range adjustment can be met
#Move to straight edge resting points, Adjust rollers at these points
#Use straight edge between resting points to adjust the other rollers to a fixed datum
'''Potential Symptoms of a problem'''
*Gripper cannot pick up offcuts
*Gripper /profile end forced away from backfence
*Accuracy problems
*Gripper wobbles after it has released profile
Use the laptop to enable you to control the Service screen whilst inside the infeed table
<div class="icon-instructions caution-icon">
<div class="icon-instructions-icon"><i class="fa fa-exclamation-triangle"></i></div>
<div class="icon-instructions-text">...You will be inside the danger area of the machine - ensure operators are aware of your situation</div>
</div>
The gripper setting jig is used to give an accurate and reliable zero to locate the gripper jaw to. Any piece of aluminium reinforcing box section will also work
<br/> +
'''Applies to: A2026-A2030 Autoflow Mk4 with Jetta Locking motors'''
In certain circumstances, the forward clamp roller arm has stuck itself under the gripper arm. Freeing from this situation requires a set process because the GZ axis motor is braked and probably in an overload condition
<br/><div class="icon-instructions caution-icon">
<div class="icon-instructions-icon"><i class="fa fa-exclamation-triangle"></i></div>
<div class="icon-instructions-text">...You need to be confident in using TwinCAT on the VM machine to navigate to settings</div>
</div><br/> +
See [[StuertzCloud - Setup Overview]] for an overview of the setup.
This tutorial covers the setup of the Local SQL Express database instance and creating a "ProOpt" database structure on it.
<br/>
*This database installed on the 'Location' local network.
*The 'Machines' write their production data to it
*The 'Gateway' software uploads this data to the StuertzCloud server
See Also
[https://stuga.dokit.app/wiki/StuertzCloud_-_Installing_Gateway StuertzCloud - Installing Gateway]
[https://stuga.dokit.app/wiki/StuertzCloud_-_Setting_up_Stuga_Machine_to_Write_Production_Data StuertzCloud - Setting up Stuga Machine to Write Production Data]
[https://stuga.dokit.app/wiki/StuertzCloud_-_Creating_a_Customer_Location StuertzCloud - Creating a Customer Location]
<br/><div class="icon-instructions info-icon">
<div class="icon-instructions-icon"><i class="fa fa-info-circle"></i></div>
<div class="icon-instructions-text">...You must have SQL Server Management Studio (SSMS) installed to manage the databases</div>
</div>
<br/> +
The Stuga website has a parts database, much like a shop front for helping identify Stuga Machine parts.
Keeping the data updated and logging nuggets of useful information is invaluable in helping identify parts on machines +
On Autoflow 2 Sawing Centres following 5 years of use., it has been found that the internal saw centre framework can lose its rigidity. this is probably due to "bruising" or denting of the aluminium joints introducing a slight amount of play. This is exacerbated by the design where it is attached and driven on from the base up
A retrofit kit of parts has previously been created to allow additional reinforcement to be introduced within the structural framework. This kit builds upon the first kit to provide further accuracy enhancements by
#Adding left right stability with additional slide rails at the top of the subframe
#Adding front / back stability by moving the SY axis leadscrew to the same height as the saw table
====Parts required: ====
R0010272 Kit: Saw Frame Rigidity Pt 2
This kit consists of 2 carriage assemblies, specifically designed to provide further rigidity to the top of the Saw Head Assembly. In addition, 2 mounting blocks required to relocate the Saw Y Axis Assembly are also included. This allows the Saw Y Axis Assembly to continue to operate accurately, but improves the life of associated components.
See also [[TB0259 Autoflow Saw Head Reinforcement]] +
* Updating software can be very complicated, so care must be taken and always ensure there is a route to retrace your steps in the event of a failure – with Baldor .mnt files this is easy because each version is a separate file and therefore easy to load the old one back in again
* In general, the Baldor (.mnt) software has been designed to be backwards compatible, but there are a few steps that needed to be taken that made this impossible. In these cases, the front end software (winMulti or winSaw) also needs to be updated – you will get an error to tell you that this is the case
* Version numbers have always followed a numerical order, so the higher the number, the later the version
* Mnt files should always be stored in
** c:\multi on MH side – called Multi X.xxx.mnt
** c:\saw on Saws or Saw side of flowline – called IgSaw X.xx.mnt
+
The following will show how to setup a mint controller i.e. NextMove ESB-2 with an RS Automation Drive and servo motor but to act as a stepper motor and being controlled from the ESB-2 as a stepper. +
== Problem ==
The previous design of screen cover was susceptible to cracking and failing. The new design resolves this by having a metal hinge piece and an additional clear plastic plate, with both being joined by 3M VHB (Very High Bond) tape.
Parts:
D0010965 x1
D0010966 x1
M0001119 x 550mm +
<div class="icon-instructions caution-icon">
<div class="icon-instructions-icon"><i class="fa fa-exclamation-triangle"></i></div>
<div class="icon-instructions-text">...Since 2023, the PCs have been supplied with a preconfiguration tool.</div>
</div>
Please use [[Setting Up Windows PC C0000422-KIT 2023]] +
==Problem==
On Z063 the bolt holding the saw blade onto the spindle has regularly been loosening during use.
==Solution==
The M16 bolt will be replaced with a stud and castle nut that can be locked with a cotter pin.
==Tool List==
Drill with Ø5.0 bit
24mm Spanner
C Spanner
= Parts List =
<table class="wikitable" width="748" border="1" cellpadding="8" cellspacing="0">
<tr>
<td width="76">D0004031B
</td><td width="319">Saw Washer 3mm
</td><td width="302">1
</td></tr><tr valign="TOP">
<td width="76">D0015560
</td><td width="319">Spindle Stud
</td><td width="302">1
</td></tr><tr valign="TOP">
<td width="76">F0000273
</td><td width="319">Spirol Pin Ø6 x 30
</td><td width="302">1
</td></tr><tr valign="TOP">
<td width="76">F0000549
</td><td width="319">Split Pin 4mm x 32
</td><td width="302">1
</td></tr><tr valign="TOP">
<td width="76">F0000550
</td><td width="319">Castle Nut M16x1.5
</td><td width="302">1
</td></tr></table> +
The first step in commissioning a new machine is to get the basic software setup correctly installed. Because the software is designed to be very flexible across many machine types, the simplest way to do this is to copy from a recently built similar machine. +
<div class="icon-instructions caution-icon">
<div class="icon-instructions-icon"><i class="fa fa-exclamation-triangle"></i></div>
<div class="icon-instructions-text">...This printer is now obsolete. The direct replacement is a ZD620 Click below for instructions on setting the replacement up</div>
</div>
[https://stuga.dokit.app/wiki/TB0452_ZD620_Zebra_Printer_Setup ZD620 Instructions] +
A backup zip folder of all necessary files can be created in WinMulti. By pressing the backup button (F11) and navigating to the backup’s folder (C:\multi\backup) a machine backup will be created. +
15/10/2025 Moved to [https://stuga-ltd.atlassian.net/wiki/spaces/~5570585b7bb5d1bc31430e886883cbc774c182/pages/7373002/COM01-06+Specialised+Settings+for+Beckhoff+Drives?atlOrigin=eyJpIjoiM2ZmM2ExNTFiYzBkNDU4MzgxMTliOGNjYjA1ZGFmMmMiLCJwIjoiYyJ9 Confluence]
Click [https://stuga-ltd.atlassian.net/wiki/external/MGFhZTU3Njg1MTEzNDQ0YzkxNzQzNTczZDdlYzJlODI here] +
<u>Problem</u>
These machines use a CX5020 PC with a 2Gb CF card running TwinCAT2 PLC system. The CF card can fail, which is effectively the windows operating system. The CF card has a very small capacity, so needs to be created from an image. This TB outlines the steps in the process to ensure a successful conclusion.
1. Create a new CF card at stuga using the beckhoff imaging tool on a CX5020
2. Boot up with the CX5020
3. Ensure PLC is set to Enable on start-up (default is config mode)
4. Rename the PC
5. Install TeamViewer host v10 or less from a USB stick
6. If you have a copy of the version of winMulti it was running, copy this in to the c:\ multi folder. If not, a “'''''new version install'''''” will be needed so copy in data from the g:\builds\PC Installs\Autoflow\Multi folder
7. Set up and customer specific network parameters to ensure TeamViewer will work when it is plugged in on site
8. Send to customer
Once on site, follow procedure A if the winMulti version is preserved, or B if it is a '''''new version install''''' +