This maintenance log is designed to be used in conjunction with the Stuga Daily, Weekly and Monthly maintenance procedures. These maintenance procedures are essential to the function of the machine and must be carried out. +
Markings and measurements required by the Install team, after a machine commission. This helps towards a smoother install process, getting the machine module positions and fencing to be in the same place (or close to) as they were during the commission at stuga base. +