PC network configuration of the Flowline following a Nextmove PC upgrade to Nextmove E100. This was a popular upgrade to overcome Nextmove PC obsolescence +
PC network configuration of the Flowline following a "full windows upgrade". This replaces both the MH side PC, as in Flowline B plus the saw side PC. +
PC network configuration of the ZX3/4 following a Nextmove PC upgrade to Nextmove E100. This was a popular upgrade to overcome Nextmove PC obsolescence +
PC network configuration of the ZX3 or ZX4 following a "full windows upgrade". This replaces both the MH side PC, as in Flowline B plus the saw side PC. +
PC network configuration of the ZX3 / 4 following using a Windows Front End Pc and Beckhoff TwinCAT2 system running the back end on machining centre side. Windows PC with Nextmove ESB on Saw side +
PC network configuration of the ZX3 / 4 following using a Windows Front End Pc and Beckhoff TwinCAT3 system running the back end for the whole machine. +