Fitting of new guard for all existing conveyors

Étape 1 - Offer up guard

Offer up the guard over the conveyor walls (the guard sits outside of the walls). The aim is that the smaller radius on the guard is concentric with the top roller.

Étape 2 - Mark off holes to drill into walls

When the guard is in the correct place, mark off 2 holes on both walls (so 4 in total).


Remove the guard

Étape 3 - Drill off holes

Drill the holes into the walls, and deburr

Étape 4 - Install guard

Reposition the guard, and fit using M6 bolts, washers and nuts.