Catégories Maintenance

Procedures for Set up and maintenance of Stuga Machines

DiscussionsPoser une question


0 Réponse(s)
4 x G clamps are Required It is for 2 x People - 3 days
Gareth Green
Jan 30 at 10:44 am

1 Réponse(s)
Z055 - ZX4 has been fitted using existing Software setup so Ou_InvDP not used (24v linked to S3 and S4.X308 - Inverter Zero fitted but not used. Uses Drive Run Fwd not using SMOT.
Gareth Green
May 2 at 7:01 pm

0 Réponse(s)
STO alarm Please see https://stuga.dokit.app/wiki/Yaskawa_Inverter_-_Fault_and_Alarm_Output_Functionality Once wiring changes have been made, change parameter H2-03 to 110. This can be done online via DriveWizard or directly through the inverter touchpad.
Gareth Green
Mar 13 at 5:30 pm

0 Réponse(s)
Gareth Green
Nov 21 at 5:01 pm

0 Réponse(s)
Newer Versions have battery in a different place (Z073) - Photos added to Step 2 and also its Soldered in with a connector These are on the H370M- ITX Gen3 x4 Motherboards
Gareth Green
Aug 14 at 3:28 pm

0 Réponse(s)
Datum Spindle is a Spindle with a 10mm Tool fitted .
Gareth Green
Jul 9 at 11:00 am

0 Réponse(s)
Z071 -- also needs the -30 (3mm) left position offset - Uses FDS Zeb files originally set to 101mm
Gareth Green
Jul 29 at 3:49 pm

0 Réponse(s)
Also Done to F031 - Who use ZEB FDS label Width set to 832 Left margin offset -30 (3mm)
Gareth Green
Jan 30 at 5:19 pm