Recherche par propriété

Cette page fournit une simple interface de navigation pour trouver des entités décrites par une propriété et une valeur nommée. D’autres interfaces de recherche disponibles comprennent la page recherche de propriété, et le constructeur de requêtes ask.

Recherche par propriété

Une liste de toutes les pages qui ont la propriété « Step Content » avec la valeur « When a bar has been properly registered as "Cut, the tick box will be ticked (as in (1)) The first one that is "Uncut" needs to be queued, so * (2) Click on "Cut" * (3) Click on the Queue Button ». Puisqu’il n’y a que quelques résultats, les valeurs proches sont également affichées.

Affichage de 10 résultats à partir du n°1.

Voir (200 précédentes | 200 suivantes) (20 | 50 | 100 | 250 | 500).


    

Liste de résultats

    • Recovery of Bar Queue following winMulti Crash  + (When a bar has been properly registered as "Cut, the tick box will be ticked (as in (1)) The first one that is "Uncut" needs to be queued, so * (2) Click on "Cut" * (3) Click on the Queue Button)
    • Upgrade ZX Machine to Beckhoff Drives and Control  + (Before the upgrade is despatched to site, Before the upgrade is despatched to site, the servo system needs to be assembled and pre-wired in its enclosure.
      *Drill off Fan detail in right hand side of cabinet. A 114mm hole saw and arbor has been purchased for this. *Drill and fit 4 adjustable feet in the bottom of the cabinet. 4 extra nuts will be in the kit. The height of the feet does not need to be set at this stage. *Drill off all servo drives. For ZX3 machines, the rack will be as follows: AX8640-AX8118-AX8206-AX8206 and for a ZX4 the will be: AX8640-AX8118-AX8206-AX8206-AX8206 (the extra drive is for the V and W axes). *Pre-wire the rack (inc STO links) and the cabinet fan with the cable provided in the kit. leave the spare coil of cable in the cabinet ready for running on-site. *Plug in the 2x15m green etherCAT cables. *The enclosure bottom plate is left off to allow the cable entry on site. '''''*for detailed wiring information, please use drawing packs from Monday.com board.*'''''
      e use drawing packs from Monday.com board.*''''')
    • Setting Up C0000422-KIT - Full Hardware 2023  + (Remove the PC from the Dell box with power adapter and power cable. Keyboard and mouse (if supplied) can be returned to stores (not needed here))
    • Importing Picking List from Sage To Monday  + (A pick run is a chunk or set of Job Cards that will be picked in a controlled amount. This is normally 10-20 job cards. it is managed in this way to keep the amount of time between the allocation on Sage and the physical pick as short as possible.)
    • Recovery of Bar Queue following winMulti Crash  + (First you need to check out the bar queue First you need to check out the bar queue to see if it is the same as the actual bars on the transfer table #Restart winMulti #Count the total number of bars on the saw infeed and transfer table #Compare with the number of bars on the saw queue
      ...If you have some offcuts on the screen, this can help identify the queue position by looking at the length of the offcut
      If there is '''one more bar''' actually on the table than on the bar queue screen, follow the process below to add the missing bar to the queue.
      han on the bar queue screen, follow the process below to add the missing bar to the queue.)
    • ZX5 Adjusting V Notch Depth and Position  + (If the blades do not meet properly, or form a "W" shape, the mechanical setup is not correct. Please follow procedure: [[ZX5 V Notch Blade Mechanical Setup|https://stuga.dokit.app/wiki/ZX5_V_Notch_Blade_Mechanical_Setup]] <br/>)
    • R0015336 Pneumatic Output Testing  + (Output testing will require valve operatioOutput testing will require valve operation with no e/s circuit Ensure the following Work area is clear from all components not required for testing All colleagues are aware of the procedure being undertaken No additional colleagues are working on the module PCL coupling is accessible to release pressure in case of emergency Testing procedure is fully adhered toy Testing procedure is fully adhered to)
    • Upgrade - Gripper Slider Mechanism  + (Remove all existing parts, including the profile lever, slideway and bearings, and the spring. Install new stronger slideway)
    • Toshiba - B-EX4T1 Printer Setup  + (To gain access turn the green knob to FREE. You can then pull the front plate down and lift the printer head up.)
    • R0015038 Bench Assemble V notch Datum Rollers  + (Use locktite 243 on all fasteners Use loctite 572 on all threaded pneumatic connection Pen mark all fasteners to show finalised)