Stuertz VSM 30.20-P Welder Installation : Différence entre versions

[version en cours de rédaction][version en cours de rédaction]
Ligne 37 : Ligne 37 :
 
|Step_Title=<translate>Lift bottom heads and remove stop bolts</translate>
 
|Step_Title=<translate>Lift bottom heads and remove stop bolts</translate>
 
|Step_Content=<translate></translate>
 
|Step_Content=<translate></translate>
 +
}}
 +
{{Tuto Step
 +
|Step_Title=<translate>Connect console</translate>
 +
|Step_Content=<translate>connect console and network cable.
 +
 +
Also fit keyboard tray.</translate>
 
}}
 
}}
 
{{Notes}}
 
{{Notes}}

Version du 16 mai 2022 à 15:51

Auteur avatarStuga Engineer | Dernière modification 5/07/2022 par Gareth Green en cours de rédaction

Étape 1 - Lift uprights into position

Lift uprights into positions and fix with 3 x bolts each side on each upright. Fit 2 x cap heads on each rail each side

Étape 2 - Run in belts and chain

Run belts and chains through onto pulleys, fix bracket to upright. Fix chain bracket first. Note: always use fully threaded bolts without a shoulder

Étape 3 - Tension chain and belts

Tension using the threaded bars nuts at the top of the uprights.

Étape 4 - Fit light curtain arms

Étape 5 - Fit guarding

Étape 6 - Connect power and air

Étape 7 - Lift bottom heads and remove stop bolts

Étape 8 - Connect console

connect console and network cable.

Also fit keyboard tray.

Commentaires

Draft