[version en cours de rédaction] | [version en cours de rédaction] |
Ligne 12 : | Ligne 12 : | ||
*The chain should be "Openable Outside" to enable a drag-style application on the inner faces | *The chain should be "Openable Outside" to enable a drag-style application on the inner faces | ||
*Cable separators should be added every 10 links to help keep the cables separate and the Beckhoff cable as central as possible | *Cable separators should be added every 10 links to help keep the cables separate and the Beckhoff cable as central as possible | ||
− | *Cable tie points on the brackets are 100% essential. These "combs" are a clip on addition | + | *Cable tie points on the brackets are 100% essential. These "combs" are a clip on addition |
*A rigid chain, coupled with a smaller bend radius removes the need for the "anti-rise" trays and the vertical members holding this assembly in the air | *A rigid chain, coupled with a smaller bend radius removes the need for the "anti-rise" trays and the vertical members holding this assembly in the air | ||
*The Beckhoff cable should be untwisted before feeding into the energy chain<br /> | *The Beckhoff cable should be untwisted before feeding into the energy chain<br /> | ||
Ligne 55 : | Ligne 55 : | ||
=Installation Flowline - Machining Centre Side= | =Installation Flowline - Machining Centre Side= | ||
− | |||
{| class="wikitable" | {| class="wikitable" | ||
− | |||
|Upgrade PartNo | |Upgrade PartNo | ||
− | | | + | |R0019175B |
|- | |- | ||
|Links | |Links | ||
− | | | + | |6.0m - 87 |
+ | |||
+ | 6.5m - 92 | ||
|- | |- | ||
|Disposal | |Disposal | ||
Ligne 75 : | Ligne 75 : | ||
=Installation Flowline - Saw Side= | =Installation Flowline - Saw Side= | ||
+ | {| class="wikitable" | ||
+ | |Upgrade PartNo | ||
+ | |R0019176B | ||
+ | |- | ||
+ | |Links | ||
+ | |6.0m - 87 | ||
+ | |||
+ | 6.5m - 92 | ||
+ | |- | ||
+ | |Disposal | ||
+ | |Remove the upper "Anti-rise" trays if fitted | ||
+ | |- | ||
+ | |Special Notes | ||
+ | | | ||
+ | |- | ||
+ | |Photos | ||
+ | | | ||
+ | |} | ||
=Installation Microline= | =Installation Microline= |
Installation of the Igus 2500 Energy chain on Stuga machines
Auteur Gareth Green | Dernière modification 19/02/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Installation of the Igus 2500 Energy chain on Stuga machines
Energy_Chain_Installation_-_2500_Series_Mk3_Igus_1.jpg
There have been reliability problems with the use of the energy chain type "B15" (15.050.048..), prompting the sourcing of a more rigid structural type. The following design points have been taken into account
Part No | Igus Code | Photo | Description | Notes |
---|---|---|---|---|
A0001113 | 2500.03.055.0 | Energy Chain: Series 2500.03 55mm Bend Radius | Supplied in metre units | |
A0001114 | 2030.34PZB | Energy Chain Bracket Set Pivotable With Cable Tie connection | Supplied as a Pair
Must be the Pivotable type ...Do not use the mounting holes in the clip on cable tie addition. This is not strong enough to hold the energy chain
...The 2500 series has a different mounting hole pattern, so the plate that the energy chain is mounted on will need to be redrilled
| |
A0001112 | 25.1.1 | Energy Chain Separator for 2500 Chain | Two separators required every 10 links |
Upgrade PartNo | R0019175B |
Links | 6.0m - 87
6.5m - 92 |
Disposal | Remove the upper "Anti-rise" trays if fitted |
Special Notes | |
Photos |
Upgrade PartNo | R0019176B |
Links | 6.0m - 87
6.5m - 92 |
Disposal | Remove the upper "Anti-rise" trays if fitted |
Special Notes | |
Photos |
en
none
0
Draft
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #