Instructions to align slider units and mesh racks
Auteur Gareth Green | Dernière modification 5/09/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Instructions to align slider units and mesh racks
R0015276_Line_up_slider_units_and_mesh_racks_Screenshot_2023-07-06_132834.png
Tools Required
Standard hex key set
Stubby hex key set
Wire line
Quick clamps
P0000501 non return valve x 3
Standard HSS drill set
Standard tap set
Tape measure
300mm rule
Parts Required
D0015625 x 1
D0015625-OH x 1
E0000336L x 2Mesh requires setting between slider unit and drive pinion
1 It is vital that the correct drive meshing is achieved.
2 Once set, there should be 1mm movement in the direction shown, which will indicate the correct tooth meshing has been obtained.
3 This need to be checked at all points of travel as shown
1 Slide drive pinion into position 1 under drive rack
2 Use M4 adjuster screws to adjust height of rack and M6 to secure
3 Slide out drive pinion and move rack to position 2. Refit drive pinion
4 Use M4 adjuster screws to adjust height of rack and M6 to secure
5 Repeat steps until correct meshing is present at all points indicated to check
Do Not glue any of the M4 /M6 socket caps used for adjustment as this will be done at a later stage
Alignment of cylinder pins is vital, and the following should be maintained
1 Alignment should be parallel to main hepco beam
2 Alignment should be Straight
To achieve this the following steps are required
1 Set First and last slider into the position shown to align indicated hole with fixing point on support arm. Slide pinion into position once slider has been moved to correct point.
2 Fine adjustment can be gained by Removing tension off M6 bolt on drive rail , and using slot to change position of drive rail mounting . Use Socket cap bolt to lock position onto support arm
3 Check measurement between pin and hepco beam on both sliders to ensure they are the same.
Use dokit Alignment guide using wire line to ensure alignment is completed correctly
1 Attach P0000501 non return valve with 6mm pipe to first and last cylinder and purge with air to maintain active position of cylinder.
2 Set wire line between these two active cylinders
Remaining slide units now need adjusting to align to the wire line .
Adjust one at a time, and use a P0000501 non return valve and 6mm pipe to purge each cylinder as you work on it. Once a cylinder is set, remove non return valve and place on next cylinder being set
1 Assemble one off D015625 and 1 off D0015625 -OH as shown using a M6 x 25 hex set bolt and 2 M6 nuts.
2 Rotate drive shaft to position rack as show
3 Position rack stop as shown and mark, drill and tap to M6 . Ensure M6 hex set bolt is set as shown for maximum adjustment
Use M6 x 16 socket caps and A form washers to fix
More info required for fitting off extension for rack stop Dimensions and photos
en none 0 Draft
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #