Autoflow Maintenance - Infeed

Auteur avatarGareth Green | Dernière modification 6/12/2022 par Gareth Green en cours de rédaction

Introduction

The following preventative maintenance tasks should be carried out regularly on the machine. The frequency depends on the machine use, but as a guide:


2-3 Shifts        Weekly
40 Hrs/Week       Bi-Weekly
20 Hrs/Week       Monthly

Étape 1 - Stainless Steel Bed

Use a suitable foam cleaner for cleaning off the glue and tape residue left by the profile rolling along the beds



Étape 2 - Main display unit (Monitor)

Clean display with soft cloth to avoid dirt, etc. causing malfunction of the touch screen



Étape 3 - Rear Backfence Rollers

Apply oil to top and side of roller units and then slowly spin them for a few revolutions to allow the oil to penetrate the bearings



Étape 4 - Drive shafts

1 pumpsof grease via grease nipple, check for any signs of damage or wear



Étape 5 - Pop-Up function

Using the Service screen, check the pop up rows rise and sink in unison



Étape 6 - Flapper Paddles

Check function and operaton of each paddle - ensure it does not stick in up or down position



Étape 7 - End Stop

Ensure the end stop slides on the linear cylinder. The system acts under a low constant pressure and should slide easily



Commentaires

Draft