Ecoline Site Installation Guide

Auteur avatarGareth Green | Dernière modification 12/08/2022 par Gareth Green en cours de rédaction

Introduction

Installation of an Ecoline is quite straight-forward as all of the main levelling and alignment is taken care of inside the main module housing.

Installation involves 3 steps

  1. Levelling main module
  2. Attaching and Levelling Infeed Frame
  3. Refitting Infeed cover

Video d'introduction

Étape 1 - Ensure services are in place

Étape 2 - Plastic Feet

Étape 3 - Level Main Frame


Étape 4 - Pull infeed into place

Ensure the pegs do not interfere with slots



Étape 5 - Level Infeed


Étape 6 - Ensure Roller Height clears Plastic

This is what the taper on the roller approach is for - to raise the profile onto the rollers



Commentaires

Draft