Stuertz VSM 30.20-P Welder Installation

Auteur avatarStuga Engineer | Dernière modification 5/07/2022 par Gareth Green en cours de rédaction

Étape 1 - Lift uprights into position

Lift uprights into positions and fix with 3 x bolts each side on each upright. Fit 2 x cap heads on each rail each side


Étape 2 - Run in belts and chain

Run belts and chains through onto pulleys, tensioner may need to be slackened off to fit the brackets through.

Lift the top head to be able to lower the chain and belt brackets at the rear of the uprights.

Fix brackets to upright.

Always fix chain bracket first. then belt bracket.

Always use fully threaded bolts without a shoulder

Étape 3 - Tension chain and belts

Tension using the threaded bars nuts at the top of the uprights. Ensure pulley are level.



Étape 4 - Fit light curtain arms

Fix in place with 2 x cap head bolts. Cabinet side connect cable to light curtain and clip to arm.

Étape 5 - Fit guarding

Étape 6 - Connect console

Connect console and network cable.

Also fit keyboard tray.


Étape 7 - Connect power and air

Étape 8 - Align safety light curtain

Étape 9 - Lift bottom heads and remove stop bolts

Using the referencing process, move the bottom heads away from the stop bolts in the rear of the uprights and then remove them.


Commentaires

Draft