Stuertz VSM 30.20-P Welder Installation

Auteur avatarStuga Engineer | Dernière modification 5/07/2022 par Gareth Green en cours de rédaction

Étape 1 - Lift uprights into position

Lift uprights into positions and fix with 3 x bolts each side on each upright. Fit 2 x cap heads on each rail each side

Étape 2 - Run in belts and chain

Run belts and chains through onto pulleys, fix bracket to upright.

Fix chain bracket first. then belt bracket.

Always use fully threaded bolts without a shoulder

Étape 3 - Tension chain and belts

Tension using the threaded bars nuts at the top of the uprights. Ensure pulley are level.

Étape 4 - Fit light curtain arms

Fix in place with 2 x cap head bolts. Cabinet side connect cable to light curtain and clip to arm.

Étape 5 - Fit guarding

Étape 6 - Connect console

Connect console and network cable.

Also fit keyboard tray.

Étape 7 - Connect power and air

Étape 8 - Align safety light curtain

Étape 9 - Lift bottom heads and remove stop bolts

Using the referencing process, once clear remove the bolts from behind the heads.

Commentaires

Draft