Stuertz VSM 30.20-P Welder Installation

Auteur avatarStuga Engineer | Dernière modification 5/07/2022 par Gareth Green en cours de rédaction

Pas encore d'image

Étape 1 - Lift uprights into position

Lift uprights into positions and fix with 3 x bolts each side on each upright. Fit 2 x cap heads on each rail each side

Étape 2 - Run in belts and chain

Run belts and chains through onto pulleys, fix bracket to upright. Fix chain bracket first. Note: always use fully threaded bolts without a shoulder

Étape 3 - Tension chain and belts

Tension using the threaded bars nuts at the top of the uprights.

Étape 4 - Fit light curtain arms

Étape 5 - Fit guarding

Étape 6 - Connect power and air

Étape 7 - Lift bottom heads and remove stop bolts

Commentaires

Draft