Autoflow Maintenance - Sawing Centre

Auteur avatarGareth Green | Dernière modification 8/12/2022 par Gareth Green en cours de rédaction

Introduction

The Machine has many moving parts, all which need regular maintenance. Below outlines what items need particular attention

Étape 1 - Horizontal and Vertical clamps

Daily – remove any debris from clamp pads and rollers

Weekly – Visually check the rollers and clamp pads for damage or excessive wear, oil rollers with supplied oil, visually check cylinder rods for damage



Étape 2 - Stainless Steel Bed

Daily – this needs to be kept clear of swarf by using the supplied blower gun on the machine

Weekly – use a suitable foam cleaner for cleaning off the glue and tape residue left by the profile rolling along the beds



Étape 3 - Saw Blade Area

Daily – Keep area free of swarf and offcuts that can become trapped

Weekly – Check saw blade teeth for wear or damage, check saw blade for warping

...When changing blade – ensure that the correct type and size saw blade is used, using the wrong type / size of blade can cause accuracy issues – Please refer to your Stuga manual for the correct specification of blade or contact Stuga Service for further assistance



Étape 4 - SZ Axis Saw Up Drive

Daily – Ensure that the area is clear of swarf and offcuts as this can cause the vertical and revolving drives to become jammed

Weekly – check that the drive belt is free from wear or any cuts / nicks along the circumference of the belt, ensure that the drive belt has sufficient tension via the tension roller, check the leadscrew for any wear or damage



Étape 5 - Saw Tilt Rollers

...Only used if compound VS cut machine option

Daily – Ensure area is free from swarf, particularly the end stops

Monthly – Check rollers and runner surface for damage or wear, Lightly oil rollers and runner surface


Étape 6 - SR Axis Slewing Ring and Pinion

Daily – clean area of swarf or debris

Weekly – visually check pinion wheel and slewing ring for any damage, chips or cracks, remove any debris that may have become caught up in the teeth



Étape 7 - SY Axis Linear Rails

Daily – clean away any debris

Weekly – lightly oil rail surface with supplied oil, ensure reference sensor is not damaged

...There are 4 rails in total, 2 at front and 2 at rear


Étape 8 - Extraction Separator

Daily – ensure that the Hose and Chute are not blocked by large offcuts

...Side open the Extraction separator base to empty offcuts


Weekly – Check Hose for damage / cuts – replace if necessary



Commentaires

Draft