Ecoline Site Installation Guide : Différence entre versions

[version en cours de rédaction][version en cours de rédaction]
Ligne 22 : Ligne 22 :
 
{{Materials}}
 
{{Materials}}
 
{{EPI}}
 
{{EPI}}
 +
{{Tuto Step
 +
|Step_Title=<translate>Ensure services are in place</translate>
 +
|Step_Content=<translate><br />
 +
{| class="wikitable"
 +
|+
 +
|Air Supply
 +
|6 bar 10cfm
 +
|-
 +
|Electrical
 +
|16A 3ph + N (32A plug supplied)
 +
|-
 +
|Network
 +
|Cat 5e with internet access
 +
|}</translate>
 +
}}
 
{{Tuto Step
 
{{Tuto Step
 
|Step_Title=<translate>Plastic Feet</translate>
 
|Step_Title=<translate>Plastic Feet</translate>

Version du 12 août 2022 à 09:39

Auteur avatarGareth Green | Dernière modification 12/08/2022 par Gareth Green en cours de rédaction

Introduction

Installation of an Ecoline is quite straight-forward as all of the main levelling and alignment is taken care of inside the main module housing.

Installation involves 3 steps

  1. Levelling main module
  2. Attaching and Levelling Infeed Frame
  3. Refitting Infeed cover

Video d'introduction

Étape 1 - Ensure services are in place


Air Supply 6 bar 10cfm
Electrical 16A 3ph + N (32A plug supplied)
Network Cat 5e with internet access

Étape 2 - Plastic Feet

Étape 3 - Level Main Frame


Étape 4 - Pull infeed into place

Ensure the pegs do not interfere with slots



Étape 5 - Level Infeed


Étape 6 - Ensure Roller Height clears Plastic

This is what the taper on the roller approach is for - to raise the profile onto the rollers



Commentaires

Draft