[version en cours de rédaction] | [version en cours de rédaction] |
Ligne 244 : | Ligne 244 : | ||
*End stops should be set so the rack can never run off the pinion - always a full tooth engaged | *End stops should be set so the rack can never run off the pinion - always a full tooth engaged | ||
*Each crank motion stops when the input is seen, and then decelerates. Therefore, set the crank input position to allow for this deceleration before hitting end stop. Normally about 30mm | *Each crank motion stops when the input is seen, and then decelerates. Therefore, set the crank input position to allow for this deceleration before hitting end stop. Normally about 30mm | ||
− | *The crank clutches should be set to slip</translate> | + | *The crank clutches should be set to slip before damage is done to the crank end stops in the event that the sensors do not work</translate> |
}} | }} | ||
{{Notes}} | {{Notes}} |
Fitting the crank upgrade to Z065, Z066, Z067
Auteur Gareth Green | Dernière modification 18/11/2024 par Stuga Engineer en cours de rédaction ⧼frevu-button-review-label⧽
Fitting the crank upgrade to Z065, Z066, Z067
ZX5, Crank Fitting_Zx5_Crank_Upgrade_DSC_0261.JPG
This upgrade replaces the crank arm assemblies on Z065, Z066 and Z067 with a direct drive system to improve reliability
This procedure involves mechanical fitting, electrical wiring and help from a TwinCAT3 competent engineer at HQ for software changes
Running frequency
Control mode
Accel time
Decel time
Sensor cables run to rear Module C cabinet - EtherCAT fieldbus boxes
This one has an extension that may or not be required. See Module D Crank Out Sensor for more info.
Sensor cables run to rear Module C cabinet - EtherCAT fieldbus boxes
Sensor cables run to rear Module C cabinet - EtherCAT fieldbus boxes
This one has an extension
Sensor cables run to rear Module C cabinet - EtherCAT fieldbus boxes
Sensor cables run to rear Module E cabinet - EtherCAT fieldbus boxes
This one has an extension
Sensor cables run to rear Module E cabinet - EtherCAT fieldbus boxes
Tidy wires away for the spare 2 phases
May need to move trunking or mount directly to side of enclosure.
Module C and D cranks to back of Module C cabinet
Module E crank to back of Module E cabinet
And restart in run mode when prompted
Ask HQ to download a relevant IODef.mul file
OuC_CrankFWD,273,2,0,0,False,False,3,8,-,False,0
OuC_CrankREV,274,2,0,0,False,False,3,9,-,False,0
OuD_CrankFWD,275,2,0,0,False,False,3,10,-,False,0
OuD_CrankREV,276,2,0,0,False,False,3,11,-,False,0
OuE_CrankFWD,277,2,0,0,False,True,64,0,-,False,0
OuE_CrankREV,278,2,0,0,False,True,64,1,-,False,0
And these removed
Key Pointers
en none 0 Draft
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #