Any number of multiple batches can now be loaded one after the other, including remake batches and pos tests.

Upgrading to winMulti v6 – Main Points for Machine Operators

User interface

·        Any number of multiple batches can now be loaded one after the other, including remake batches and pos tests. Each batch joins the end of the Work Queue.

TB0384 Software Upgrade to v6 Operator Note Image.png



·        The Clear button will clear a batch from the work queue

·        A new Reoptimise button will Reoptimise the sub-batch of the profile / colour combination. This will give you some reoptimisation controls to modify how the software utilises the bar

o  Standard length can be changed if there is a batch of undersized bars

o  Increasing the optTol will make the optimisation “less fussy” on the first few bars which may reduce the number of offcuts overall

o  A second optimiser version can be used which deals with standard sized windows more effectively

Resetting after a problem

·        The reset machine button only resets one side of the machine (MH or saw)

·        On an Alarm, a Hard Reset will reset and redatum both the saw and Machining Centre Side

·        A soft reset resets and redatums just the one side of the machine

·        A full “Cold” PLC reset completely reboots the controller system. There is a button for this on the main service screen

·        The software “remembers” how far along the bar it has been machined or cut, so on a restart after a problem, it will start from where it left off. There is the option to cut from scratch again, to do this, make sure the bar is removed from the loading area 0 it will tell you on the screen when to do this.



Commentaires