[version en cours de rédaction] | [version en cours de rédaction] |
Ligne 36 : | Ligne 36 : | ||
<br /> | <br /> | ||
− | * Drill off Fan detail in right hand side of cabinet. | + | *Drill off Fan detail in right hand side of cabinet. A 114mm hole saw and arbor has been purchased for this. |
− | * Drill and fit 4 adjustable feet in the bottom of the cabinet. 4 extra nuts will be in the kit. The height of the feet does not need to be set at this stage. | + | *Drill and fit 4 adjustable feet in the bottom of the cabinet. 4 extra nuts will be in the kit. The height of the feet does not need to be set at this stage. |
− | * Drill off all servo drives. For ZX3 machines, the rack will be as follows: AX8640-AX8118-AX8206-AX8206 and for a ZX4 the will be: AX8640-AX8118-AX8206-AX8206-AX8206 (the extra drive is for the V and W axes). | + | *Drill off all servo drives. For ZX3 machines, the rack will be as follows: AX8640-AX8118-AX8206-AX8206 and for a ZX4 the will be: AX8640-AX8118-AX8206-AX8206-AX8206 (the extra drive is for the V and W axes). |
− | * Pre-wire the rack (inc STO links) and the cabinet fan with the cable provided in the kit. leave the spare coil of cable in the cabinet ready for running on-site. | + | *Pre-wire the rack (inc STO links) and the cabinet fan with the cable provided in the kit. leave the spare coil of cable in the cabinet ready for running on-site. |
− | * Plug in the 2x15m green etherCAT cables. | + | *Plug in the 2x15m green etherCAT cables. |
− | * The enclosure bottom plate is left off to allow the cable entry on site. | + | *The enclosure bottom plate is left off to allow the cable entry on site. |
'''''*for detailed wiring information, please use drawing packs from Monday.com board.*'''''</translate> | '''''*for detailed wiring information, please use drawing packs from Monday.com board.*'''''</translate> |
This tutorial will provide a step by step guide on how to upgrade a ZX style machine to have Beckhoff drives and control system.
Auteur Stuga Engineer | Dernière modification 16/10/2023 par Stuga Engineer en cours de rédaction ⧼frevu-button-review-label⧽
This tutorial will provide a step by step guide on how to upgrade a ZX style machine to have Beckhoff drives and control system.
Upgrade, Beckhoff, ZX3, ZX4, Control System Upgrade_ZX_Machine_to_Beckhoff_Drives_and_Control_ZX4.JPG
Check through all parts lists and make sure that the parts that have been requested are the parts that are in the box. The picked parts should include all the consumable products that are in the BoMs (bolts, tie wraps, wires etc).
Once parts have been checked, they need to be handed to production for pre-assembly.
Ensure all information and drawing packs are available in the service job and in the relevant technical information boards on Monday.com. Link to Monday board for drawing packs here:
Before the upgrade is despatched to site, the servo system needs to be assembled and pre-wired in its enclosure.
*for detailed wiring information, please use drawing packs from Monday.com board.*
Touchscreens
Cabling
Refer to drawings
en none 0 Draft
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #