Introduction

Tools require


Pipe cutters

Number identification

Flush cutters


Parts required


P0000010 Elbow Adaptor 6mm - 1/8 BSPT (Taper thread)

P0000160 Fitting: Flow Controller In Line 6mm

P0000551 6mm inline Quick Exhaust Fitting

P0001008 Regulator: ARG20 0 - 8.5 Bar c/w Gauge

P0001022 Regulator Bracket: to suit P0001008


Étape 1 - Unless otherwise stated

All bolts to have Loctite 243 adhesive applied unless otherwise stated

All Threaded Pneumatic connections to have Loctite 570 applied

All bolts to be pen marked once adhesive applied and correct tension added



Étape 2 - Y239 Material blower

Material blower should be identified as 2399


P0000160 flow reg required to control flow onto sensors


Connect to active port ln valve bank (4)



Étape 3 - Y231, Y230 and Y299 Pop up feeds

Feed pipes from valve bank should be run to transfer arm location 4


Identifications will be


2319

2309

2299


Connect to active port on valve bank (4)

Fit A000343 energy chain @44? links

A0000344 energy chain brackets as shown

Mount to D0015577 fixed bracket and attach to support arm as shown

Must have a P0000551 qev fitted to each line


Étape 4 - Y221 channel

Has regulation on active position


Identification


2211 feeds from valve bank (2) to cylinder home port (nose)


2212 feeds from base of cylinder to reg out port


2219 feeds from reg in port to active port on valve bank (4)


P0000551 2 off must be fitted to 2211 and 2212 close to cylinder



Étape 5 - Y220 channel lock

Identification 2209


Connected to active port of valve bank (4)



Étape 6 - Y147 pop up E

Identification 1479


Connects to active port on valve bank (4)


Ensure enough loom to allow full range of movement



Étape 7 - Y146 Roller Bed

Identification


1461 and 1469


Roller bed is lifted at home position


1461 to home port on valve bank (2)

1469 to active port on valve bank (4)



Étape 8 - Y241 Rack blower

Identification 2419


Must have flow regulation P0000160


Connect to active port (4) on valve bank



Étape 9 - Y131 Grip Height

Gripper height is lifted for home position


identification


1311 Home port of valve bank (2) to nose of cylinder

1312 base of cylinder to out port on regulator

1319 In port of regulator to active port on valve bank (4)

Étape 10 - Connect ring main

Connect 12mm blue airpipe from valve banks to end of frame for machine connections