R0015034B ZX5 Module B Wiring Loom installation Part 2

Auteur avatarGareth Green | Dernière modification 21/02/2024 par Gareth Green en cours de rédaction

Introduction

Parts Required


Pre labelled Wiring loom assembly R0015034B from electrical team

Tools required


Flush cutters

Tie wraps small

Tie Wraps Large

Étape 1 - Unless otherwise stated

All bolts to have Loctite 243 adhesive applied unless otherwise stated

All Threaded Pneumatic connections to have Loctite 570 applied

All bolts to be pen marked once adhesive applied and correct tension added



Étape 2 - Connect 20B

Connect cable 20b to in port on Fb01B and route as shown


Étape 3 - Connect 21B

Connect 21b To FB01B out port to FB02B in port , routing as shown


Étape 4 - Connect 22B

Connect 22b To FB02B out port to FB03B in port , routing as shown


Étape 5 - Connect 23B

Connect 23b To FB03B out port to FB04B in port , routing as shown


Étape 6 - Loom 24B

Retrieve 24B cable which exits the rotary head energy chain and loom to box FB04B out port


Étape 7 - Route X53 Z axis Datum

Route X53 cable as shown, to EC04B

Étape 8 - Route X488 and X56

Retrieve X488 and X56 from rotary ring loom and route around trunking to EC04B


Étape 9 - Route X50

Retrieve X50 from energy chain rear and route as shown, exiting at FB04B

Étape 10 - X65 CLISHm

Route reed switch X65 as shown. Finish at FB04B


Ensure maximum length is left for routing to cylinder at a later point


...L-R machines Require extension cable to allow correct routing. See electrical team for additional cable. Cable join/plug must be left in vertical trunking for ease of access

Étape 11 - X63 CLITHm

Route X63 reed switch to the route shown, leaving minimal cable for termination at FB04B end


Étape 12 - X59 X61

Route reed switches X59 and X61 from FB04B to exit at point shown of trunking


Ensure minimal length of cable is left at FB04B termination end

Étape 13 - Route X247

Connect X247 from loom box onto V safe sensor and route as shown to FB01B

Étape 14 - Route X111 and X112

Route X111 and X112 reed switches from loom box and route as shown


Reed switches to exit same side as cylinders for V notch clamps


Ensure minimal cable length is left at FB01B connection end


Coil reed switches onto cylinder for temporary measure

Commentaires

Draft