R0015029D Hepco Beam Alignment

Auteur avatarGareth Green | Dernière modification 3/04/2024 par Gareth Green en cours de rédaction

Introduction

Tools Required


Engineers level


Parts Required

B0000184 Journal Cap Seal 34 x 4

B0000185 Double Row Long Stud Journal Eccentric x 2

B0000186 Double Row Long Stud Journal Concentric x2

B0001102 Double Edge Spacer Slide and Beam 7600mm x 1

D0015072 Carriage Plate x 1

D0015492 Vertical Beam Adjustment Plate x5

D0015493 Lateral Beam Adjustment Plate x 5

P0000200 Elbow Adaptor 6mm - M5 x 1

F0000529 T-Nut M6 (slot 10) x 3

F0000530 T-nut M8 (slot 10) x1

Étape 1 - Unless otherwise stated

Always Use Loctite 243 on all fasteners

Always use Loctite 570 on all threaded pneumatic connections

Pen mark all fasteners to show finalised



Étape 2 - Additional spacer

Ensure additional spacer is fitted to jigs when using for alignment on module E

Étape 3 - Attach Setting jigs

Mount setting jigs to channel section in positions shown using M8 cap head bolts and heavy washers


Position one shown will require fixing points drilling to channel section . Drill M8 and position to measurement shown of 430mm


Étape 4 - Level Setting Jigs

...The correct setting of these jigs is vital to correct installation of the hepco drive system. Accurate positioning of these will enable quality checks to be performed on the supplied hepco rail

Use an engineers level to individually adjust each jig to be level on both axis


...Always ensure when levelling that the jig remains in contact with the blue support bar on at least one point . The distance between the top face and the blue mounting section is vital to the correct set up


Étape 5 - Level x axis between jigs

Using a 2 meter straight edge , the jigs should be levelled to each other as shown.


Identify which Jig is the lowest point by using the straight edge and level . Adjust the lower height jigs to match the highest point one. This is to ensure that the height is maintained as much as possible between blue mounting bar and jig top face


When a jig is adjusted for height, i will need rechecking to see if the other previous levelled plains have moved. If so, re adjust to bring jig level in all axis

Étape 6 - Wire line for setting straightness

A wire line should be used for setting the straightness of the jigs along the x axis


Use dokit Alignment guide using wire line for correct process to set up


Étape 7 - Quality Check

Qc Double check required at this point from Supervisor that all alignment is correct.



Étape 8 - Position Hepc double edge slide

B0001102 can now be assembled on jigs .


These beams are paired so check you have been issued a set correctly


Pairs can be identified as follows


1 and 1

2 and 2

A and A

B and B

Étape 9 -

Étape 10 -

Étape 11 -

Étape 12 -

Commentaires

Draft