− | <translate>=Electrical Connections: = | + | <translate><br />{{Info|...This guide is intended to be used after the mechanical installation of the machine has been completed.}} |
+ | |||
+ | =Electrical Connections: = | ||
==<u>Module A (Machining Centre Infeed Table)</u>== | ==<u>Module A (Machining Centre Infeed Table)</u>== | ||
Ligne 33 : | Ligne 35 : | ||
==<u>Module B (Machining Centre)</u>== | ==<u>Module B (Machining Centre)</u>== | ||
+ | |||
+ | |||
+ | <nowiki>*</nowiki>The electrical cabinet attached to Module B is hinged and will need to be opened up. This should already have been done to be able to mechanically install the machine. | ||
===Main Network Supply: === | ===Main Network Supply: === | ||
Ligne 53 : | Ligne 58 : | ||
*CB02E - Crank motor power cable for Module E crank. Runs from behind Module B electrical cabinet, across the Transfer basket and plugs into CB02E1 at the end of Module E frame work. | *CB02E - Crank motor power cable for Module E crank. Runs from behind Module B electrical cabinet, across the Transfer basket and plugs into CB02E1 at the end of Module E frame work. | ||
+ | === Earth Bonding: === | ||
+ | 2 earth bonds will be coming out of the Module B electrical cabinet, 1 of them needs to be attached to the frame work on Module C and the other runs from behind the back of the Module B electrical cabinet, across the Transfer bracket and connect to the Module E frame work. All fixing points will be marked with an 'Earth' sticker. | ||
<br /> | <br /> | ||
− | ==<u>Module C (Machining Centre Outfeed Table)</u>== | + | |
+ | == <u>Module C (Machining Centre Outfeed Table)</u> == | ||
==<u>Module D (Transfer Table)</u>== | ==<u>Module D (Transfer Table)</u>== |
This guide is to be used for all of the electrical connections when installing a ZX5 machine.
Auteur Stuga Engineer | Dernière modification 5/12/2023 par Stuga Engineer en cours de rédaction ⧼frevu-button-review-label⧽
This guide is to be used for all of the electrical connections when installing a ZX5 machine.
ZX5, Electrical, Installation Installation_Guide_-_ZX5_Electrical_electrical_connection.JPG
Module A is where the factory mains supply comes into the machine. A cable is supplied on the screen and this needs to be terminated appropriately according the termination method given in the customer factory.
There will be 3 cables coming from the Machining Centre module that need to be connected to Module A. The cables are as follows:
There will also be a HDMI cable coiled up on Module A that needs to be run to Module F electrical cabinet. The HDMI cable needs to be run through the Machining Centre, down the Transfer basket tray and into the bottom brush of the Module F electrical cabinet. The HDMI cable then plugs into the HDMI port in the front end PC.
An earth bond will be loose that needs connecting to the Machining Centre frame. The connecting point will have an 'Earth' sticker as reference.
*The electrical cabinet attached to Module B is hinged and will need to be opened up. This should already have been done to be able to mechanically install the machine.
Module B is where the network from the factory comes into the machine. A network cable with an RJ45 plug will need to be supplied by the customer and this will need to be connected into the top port of the yellow ethernet switch inside the Module B electrical cabinet.
Module B cabinet will be completely wire but it will have a number of cables coming out of the back that need to be connected to external devices. The connection that need to be made are as follows:
2 earth bonds will be coming out of the Module B electrical cabinet, 1 of them needs to be attached to the frame work on Module C and the other runs from behind the back of the Module B electrical cabinet, across the Transfer bracket and connect to the Module E frame work. All fixing points will be marked with an 'Earth' sticker.
Termination checks
Door unlock
Estop check