===Earth Bonding: === | ===Earth Bonding: === | ||
An earth bond will be loose that needs connecting to the Machining Centre frame. The connecting point will have an 'Earth' sticker as reference. | An earth bond will be loose that needs connecting to the Machining Centre frame. The connecting point will have an 'Earth' sticker as reference. | ||
+ | |||
+ | <br /> | ||
==<u>Module B (Machining Centre)</u>== | ==<u>Module B (Machining Centre)</u>== | ||
− | === Main Network Supply: === | + | ===Main Network Supply: === |
Module B is where the network from the factory comes into the machine. A network cable with an RJ45 plug will need to be supplied by the customer and this will need to be connected into the top port of the yellow ethernet switch inside the Module B electrical cabinet. | Module B is where the network from the factory comes into the machine. A network cable with an RJ45 plug will need to be supplied by the customer and this will need to be connected into the top port of the yellow ethernet switch inside the Module B electrical cabinet. | ||
<br /> | <br /> | ||
− | === External Connections: === | + | ===External Connections: === |
Module B cabinet will be completely wire but it will have a number of cables coming out of the back that need to be connected to external devices. The connection that need to be made are as follows: | Module B cabinet will be completely wire but it will have a number of cables coming out of the back that need to be connected to external devices. The connection that need to be made are as follows: | ||
− | * CBX | + | *CBX - Servo cable for X axis. Plugs into CBX1 behind Module B electrical cabinet. |
− | * CBSX | + | *CBSX - Servo cable for SX axis. Runs from Module B electrical cabinet, across the Transfer basket and plugs into CBSX1 on Module E basket tray. |
− | * CBSR | + | *CBSR - Servo cable for SR axis. Runs from Module B electrical cabinet, across the Transfer basket and plugs into CBSR1 behind Module F electrical cabinet. |
− | * CB20C | + | *CB20C - Power cable for EtherCAT boxes on back end. Runs from behind Module B electrical cabinet, into Module C basket tray and plugs into FB01C etherCAT box. |
− | * EC01C | + | *EC01C - Network cable for EtherCAT boxes on back end. Runs from behinf Module B electrical cabinet, into Module C basket tray and plugs into FB01C etherCAT box (green ports). |
− | * CB40C | + | *CB40C - Safety cable for Transfer gate. Runs from behind Module B electrical cabinet, half way across Transfer basket tray and across to hinge switch on gate between the Machining Centre and Sawing Centre. |
− | * CB01C | + | *CB01C - Crank motor power cable for Module C crank. Plugs into CB01C1 behind Module B electrical cabinet. |
− | * CB02C | + | *CB02C - Crank motor power cable for Module D crank. Plugs into CB02C1 behind Module B electrical cabinet. |
− | * CB43C | + | *CB43C - Safety cable for back end ESTOP and safety gates. Plugs into CB44C behind Module B electrical cabinet. |
− | * CB47C | + | *CB47C - Safety cable for middle ESTOP on Module C. Plugs into CB48C behind Module B electrical cabinet. |
− | * CB02E | + | *CB02E - Crank motor power cable for Module E crank. Runs from behind Module B electrical cabinet, across the Transfer basket and plugs into CB02E1 at the end of Module E frame work. |
<br /> | <br /> |
This guide is to be used for all of the electrical connections when installing a ZX5 machine.
Auteur Stuga Engineer | Dernière modification 5/12/2023 par Stuga Engineer en cours de rédaction ⧼frevu-button-review-label⧽
This guide is to be used for all of the electrical connections when installing a ZX5 machine.
ZX5, Electrical, Installation Installation_Guide_-_ZX5_Electrical_electrical_connection.JPG
Module A is where the factory mains supply comes into the machine. A cable is supplied on the screen and this needs to be terminated appropriately according the termination method given in the customer factory.
There will be 3 cables coming from the Machining Centre module that need to be connected to Module A. The cables are as follows:
There will also be a HDMI cable coiled up on Module A that needs to be run to Module F electrical cabinet. The HDMI cable needs to be run through the Machining Centre, down the Transfer basket tray and into the bottom brush of the Module F electrical cabinet. The HDMI cable then plugs into the HDMI port in the front end PC.
An earth bond will be loose that needs connecting to the Machining Centre frame. The connecting point will have an 'Earth' sticker as reference.
Module B is where the network from the factory comes into the machine. A network cable with an RJ45 plug will need to be supplied by the customer and this will need to be connected into the top port of the yellow ethernet switch inside the Module B electrical cabinet.
Module B cabinet will be completely wire but it will have a number of cables coming out of the back that need to be connected to external devices. The connection that need to be made are as follows:
Termination checks
Door unlock
Estop check