Fitting Zx5 Crank Upgrade

Auteur avatarGareth Green | Dernière modification 22/11/2019 par Gareth Green en cours de rédaction

Introduction

This upgrade replaces the crank arm assemblies on Z065, Z066 and Z067 with a direct drive system to improve reliability

Étape 1 - Program Eaton Drives before they leave

Running frequency

Control mode

Accel time

Decel time


Étape 2 - Remove Link arm connecting to rack and pinion



Étape 3 - Remove pivot shaft and arm


Étape 4 - Undo clutch and remove Cam


Étape 5 - Add sprocket to clutch

B0001166


Étape 6 - Fix idler plate to upright


Étape 7 - Fix split sprocket onto drive shaft

...Line up with a straight edge


Étape 8 - Drill and pin split sprocket to shaft



Étape 9 - Add chain minimum length sprocket to sprocket

Use idler to create tension



Étape 10 - Fit Module C Crank Home sensor plate to Arm 5

Sensor cables run to rear Module C cabinet - EtherCAT fieldbus boxes


Étape 11 - Fit Module C Crank Out sensor plate to Arm 5

This one has an extension that may or not be required. See Module D Crank Out Sensor for more info.

Sensor cables run to rear Module C cabinet - EtherCAT fieldbus boxes


Étape 12 - Fit Module D Crank Home sensor plate to Arm 5

Sensor cables run to rear Module C cabinet - EtherCAT fieldbus boxes



Étape 13 - Fit Module D Crank Out sensor plate to Arm 5

This one has an extension

Sensor cables run to rear Module C cabinet - EtherCAT fieldbus boxes

Étape 14 - Fit Module E Crank Out sensor plate to Arm 5

Sensor cables run to rear Module E cabinet - EtherCAT fieldbus boxes


Étape 15 - Fit Module E Crank Home sensor plate to Arm 5

This one has an extension

Sensor cables run to rear Module E cabinet - EtherCAT fieldbus boxes

Étape 16 - Remove 2 off breaker and contactor Module C


Étape 17 - Add 2 off single pole breaker Module C

Tidy wires away for the spare 2 phases

Étape 18 - Add 2 off Eaton Drive to Module C

May need to move trunking or mount directly to side of enclosure.

Étape 19 - Add single pole breaker Module E

Étape 20 - Remove breaker and contactor Module E

Étape 21 - Add 1 Off Eaton drive to Module E

Étape 22 - For each Eaton Drive


  • 1 phase
  • Neutral
  • Earth
  • Fwd and Reverse signals
  • Wire motor cables directly to bottom of drives


Étape 23 - Wire Sensor Cables to EtherCAT boxes

Module C and D cranks to back of Module C cabinet

Module E crank to back of Module E cabinet


Étape 24 - Latest software installed

Étape 25 - Map new Links

Étape 26 - Test

Commentaires

Draft