R0015087 Pneumatic Connections

Auteur avatarGareth Green | Dernière modification 11/03/2024 par Gareth Green en cours de rédaction

Introduction

Tools require


Pipe cutters

Number identification

Flush cutters


Parts required


P0000010 Elbow Adaptor 6mm - 1/8 BSPT (Taper thread)

P0000160 Fitting: Flow Controller In Line 6mm

P0000551 6mm inline Quick Exhaust Fitting

P0001008 Regulator: ARG20 0 - 8.5 Bar c/w Gauge

P0001022 Regulator Bracket: to suit P0001008


Étape 1 - Unless otherwise stated

All bolts to have Loctite 243 adhesive applied unless otherwise stated

All Threaded Pneumatic connections to have Loctite 570 applied

All bolts to be pen marked once adhesive applied and correct tension added



Étape 2 - Y239 Material blower

Material blower should be identified as 2399


P0000160 flow reg required to control flow onto sensors


Connect to active port ln valve bank (4)



Étape 3 - Y231, Y230 and Y299 Pop up feeds

Feed pipes from valve bank should be run to transfer arm location 4


Identifications will be


2319

2309

2299


Connect to active port on valve bank (4)


Étape 4 - Y221 channel

Has regulation on active position


Identification


2211 feeds from valve bank (2) to cylinder home port (nose)


2212 feeds from base of cylinder to reg out port


2219 feeds from reg in port to active port on valve bank (4)


P0000551 2 off must be fitted to 2211 and 2212 close to cylinder



Étape 5 - Y220 channel lock

Identification 2209


Connected to active port of valve bank (4)



Étape 6 - Y147 pop up E

Identification 1479


Connects to active port on valve bank (4)


Ensure enough loom to allow full range of movement



Étape 7 - Y146 Roller Bed

Identification


1461 and 1469


Roller bed is lifted at home position


1461 to home port on valve bank (2)

1469 to active port on valve bank (4)



Étape 8 -

Étape 9 -

Étape 10 -

Étape 11 -

Étape 12 -

Étape 13 -

Étape 14 -

Étape 15 -

Étape 16 -

Étape 17 -

Étape 18 -

Commentaires

Draft