Fitting of control pipes and connections
Auteur Gareth Green | Dernière modification 11/12/2023 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Fitting of control pipes and connections
Install_Spindle_control_pipework_and_fittings_Screenshot_99.png
Use Loctite 243 on all fasteners
Pen mark all fasteners to show finalised
4 off
1 Mount pre assembled valve into spindle connection boxes to the left of the single slide spindle assembly (as viewed from rear)
2 Use 3 off M3 x 12 pan heads to secure valve to connection box as shown
3 Before tightening, add 4 off D0010807 upstand collars to define position of valve mounting
4 Finalise fixing
4 off
1 Mount double stack of valves into spindle boxes to the left of the double plunge spindle assemblies. (as viewed from rear)
2 Use 3 off M3 x 25 pan heads to secure valve to connection box as shown
3 Before tightening, add 4 off D0010807 upstand collars to define position of valve mounting
4 Finalise fixing
1 Double valve connections
Use compact 6mm tee P0001023 and connect two valves together as picture
Lay feed pipe over top and mark length, cut and connect
2 Single valve connections
Lay feed pipe over valve fitting, mark and cut then connect
1 Fit 4 off P0000456 m5 -4mm straight fittings to double plunge connection boxes ( 2 valve boxes)
2 Fit 2 off Poooo456 m5-4mm straight fittings to single plunge connection boxes (1 valve boxes) and 2 off M5 x5 button heads as blanks
1 Use 4mm black air pipe to connect lower valve in all connection boxes as shown
2 On double valve boxes overlay second set of pipes to connect exhausts of top valve
1 Fit P0001091 bulkhead connector to all spindle boxes at position shown, ensuring orientation of bulkhead is the same
2 Cut 8 pieces of black 6mm air pipe @230mm long and fit as show
3 Add P0001091 bulkhead to double slide connection boxes only as shown
1 Prepare 8 off P0001091 bulkheads with a piece of 32mm long 6mm black pipe added and one nut removed
2 Push pipe into cylinder fitting with nuts loose as shown
3 Apply force on fitting towards cylinder and run indicated nut to face to ensure no strain is added to fitting when tightening
4 Spin indicated nut to the connection box face and then tighten nuts
Fit remaining p0001091 bulkhead to double slide connection boxes as shown
1 Cut 8 off pieces of black air pipe @ 230mm and fit as shown to all connection boxes, noting pipe routing
2 Cut 8 off pieces of black 6mm air pipe @ 190mm and fit as shown to all connection boxes
1 Cut 4 off pieces of 6mm black airpipe @ 245mm and install in double slide connection boxes as shown, noting pipe routing
2 Cut 4 off pieces of 6mm black airpipe @ 205mm and install in double slide connection boxes as shown, noting pipe routing
1 Install 300hz cable from single slide spindle as shown (4 off)
2 Install 300hz cable from double slide spindle as shown (4 off)
1 Loom with spiral wrap as shown sensors from double plunge assembly
2 Loom with spiral wrap as shown sensors from single plunge assembly
Fit 2 off P0001093 stem elbows as shown then connect 4mm airpipes over length as shown to either connection ( these will be identified and tidied later on)
Repeat on remaining 3 double plunge connection boxes