Installation and routing of control cables and pipes to connection boxes
Auteur Gareth Green | Dernière modification 24/09/2024 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Installation and routing of control cables and pipes to connection boxes
Spindle_energy_chains_and_looms_Screenshot_81.png
Assembly 8 off spindle energy chains with 27 links of A0000343 and 1 pair of A0000344
Assemble as image
1 Use 4 off m3 x 6 pan head screws and mount energy chains as shown. Ensure energy chain is mounted parallel to the cylinder
2 Disconnect end shown ready for cabling
1 Use small cable wrap to start loom at cylinder end. Incorporate reed switches as passing. Add tie wrap to secure loom
2 Continue loom and fix to tie bases as passing
3 Continue loom over terminal box and secure on Tie base
4 Place looms as shown through energy chains
5 Reconnect energy chain and leave flying tails in centre of the ring
Repeat for 3 other double spindles