The ZX5 machine can be tricky to align as there are many adjustments designed into the table to offset manufacturing tolerances. This step by step guide follows the correct protocol to ensure the starting point and sequence of alignment is correct
Étape 1 - Ensure alignment of module A, B and C on machining centre side
Check backfence roller alignment to infeed
Check roller heights to infeed and outfeed
Étape 2 - Both Linear Beam check - straightness and level
Straightness of MH side with laser level
Levelness of MH side with carriage plate. Use the carriage plate to check X and Y levelling
Straightness of saw side with laser level
Levelness of saw side with carriage plate
Parallelism of hepco beams to each other with tape rule
Adjust to get this correct - adjust frames on floor if not parallel
Étape 3 - MH Outfeed Roller bed height adjustment to gripper base
Fixed distance 2-3mm
Has to be clear of transfer beams in the up position
Étape 4 - Saw Roller bed height adjustment to gripper base
Fixed distance 2-3mm
Has to be clear of transfer beams in the up position
Étape 5 - Popup Alignment MH side
Alignment of the popup ins on crank C, D, E to hepco
Using Hepco as datum, ensure they are parallel
Étape 6 - Grip jig alignment on MH side
Check with beam at the HOME position (outside machine) and beam in the OUT position (inside machine)
Check pressure - as low as possible
Étape 7 - Popup Alignment / Overlap Saw side
Use the linear rail as the datum
Étape 8 - Set backfence parallel to hepco and overlap with popup correct
Étape 9 - Grip jig alignment to backfence
Adjusting Gripper Y position to suit Jig
Grip pressure as low as possible
Set first and last backfence, then use a string
...When setting long backfences be careful not to distort them when fixing the two anchoring points
Étape 10 - Channel Bar parallel with saw infeed backfences
Misses gripper by 1mm - should not touch
Parallel all the way down
Channel bar should be just over 1 bar - able to push profile to backfence
...Too much pressure will cause the fence to distort
Étape 11 - Saw Module Fence Alignment
Backfences aligned
Front fences aligned
Back and front parallel
Étape 12 - Infeed to saw module alignment
...Moving the saw is a major step, so double check your steps if this becomes necessary
Saw module level
Eject beds level and aligned
Backfence 0-1mm in front of saw infeed backfences
Beds 0-1mm above infeed rollers
Étape 13 - Outfeed push bar alignment
Pusher bar is behind saw rear rollers
Pusher bar is straight
Commentaires
ennone0Draft
×
Erreur de saisie dans le nom du tutoriel
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #
Connexion
Pas encore enregistré ? Créez un compte pour profiter de toutes les fonctionnalités du service !