Dismantle Autoflow Mk4

Auteur avatarGareth Green | Dernière modification 1/03/2023 par Gareth Green en cours de rédaction

Étape 1 - Package Printer in original box



Étape 2 - Thoroughly clean the machine of swarf and material

Étape 3 - Prepare the infeed for transport

Stowing Stuertz Infeed Table



Étape 4 - Prepare the tooling heads for transport

6 off spindles



Étape 5 - R Axis

Tie the R axis at the datum assembly point



Étape 6 - Y Axis

Y axis roughly to middle

Cut profile blocks and tie in to prevent movement



Étape 7 - Z axis

Wind Z axis to bottom of travel

Take care to ensure MH outfeed top clamp is not compromised



Étape 8 - Check and Pack guarding

  • Ensure the correct number of fittings sent

Étape 9 - Tie All Clamps Safely

  1. MH Infeed Top
  2. MH Infeed Side
  3. MH Outfeed Top
  4. MH Outfeed Side
  5. Saw Infeed Side
  6. Saw Outfeed Side
  7. Ejector top
  8. Saw Outfeed top


Étape 10 - JX Ejector Axis

  1. Detach all cables and pipes at the carriage end ensuring it is clearly labelled where they re-attach
  2. Remove rail mounting bolt(s) on machine side of rail
  3. Remove the shoulder bolts connecting the assembly to the fram
  4. Second person needed to support weight of carriage while lifting off
  5. Package carefully with bolts
  6. Tie back the ejector energy chain


Étape 11 - Lower Eject Assembly

Tie back the assembly



Étape 12 - Air gun stowage

Étape 13 - Conveyor

Étape 14 - Extractor

Étape 15 - Tie doors shut

Commentaires

Draft