Igus Energy Chain Installation

Auteur avatarGareth Green | Dernière modification 11/08/2023 par Gareth Green en cours de rédaction

Important installation instructions for Igus Energy Chain

Problem

The relative height of the fixing point to the Igus energy chain is smaller / lower than the loop diameter.

Energy Chain Identification and Obsolescence Image.png


Solution

The first 3 links of the energy chain should be reversed to allow the chain to lay correctly and the loop to form.

Failure to insert these links will cause the chain to fail

Commentaires

Draft