Weekly Maintenance Checklist for ZX5 Machine
Auteur Gareth Green | Dernière modification 5/04/2022 par Gareth Green en cours de rédaction ⧼frevu-button-review-label⧽
Weekly Maintenance Checklist for ZX5 Machine
Weekly, Maintenance ZX5_Weekly_Maintenance_Checklist_24872-web-032.jpg
Date | Build Number | Completed By |
---|---|---|
[___________] |
[______________] |
[_________________________________] |
Ref | Description | Tick | |
---|---|---|---|
1.1 | Clean Material Load and Offcut Sensors
Wipe Lenses. Check function on LED output |
[______] | |
1.2 | Check Alignment and State of Infeed Pegs
Check that the pegs on each arm all exist and are all aligned with each other. |
[______] | |
1.3 | Check State of Infeed Wheel Rubber | [______] | |
1.4 | Load Wheel Slide
Ensure the slide operates up and down freely |
[______] | |
1.5 | Roller bed
Check all rollers are free to turn and not flat-spotted Particularly near entrance to machining centre |
[______] |
en none 0
Draft
Vous avez entré un nom de page invalide, avec un ou plusieurs caractères suivants :
< > @ ~ : * € £ ` + = / \ | [ ] { } ; ? #