ZX3 Counterweight Installation

Auteur avatarGareth Green | Dernière modification 25/02/2022 par Gareth Green en cours de rédaction

Introduction

This guide explains how to install the counterweight assembly on the current ZX3 ring

Étape 1 - Remove the large infill plate at the 180 degree position

The machine has been sent with an infill plate that needs to be replaced with a counterbalance spindle and smaller infill plate



Étape 2 - Install the mounting plate

Install the mounting plate using the standard mounting holes.



Étape 3 - Install the 3 weight plates

Fit all 3 weight plates, and secure with the provided bolts and washers



Étape 4 - Install the triangular sheet metal plate

Fit the triangular plate



Étape 5 - Finished result

Commentaires

Draft